Study guide
9.3 Valleys: Linings, Open Metal, Closed-Cut & Woven Valleys
Michigan Roofing Contractor Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: The Exam & Michigan Licensing Law
1.1 The Michigan Roofing License Exam: Format, Fees & Test-Day Rules 1.2 Who Must Be Licensed: Residential Builder vs. M&A Roofing & the Exemptions 1.3 Prelicensure Education, Application, Renewal & Continuing Competency 1.4 Company Licenses, Qualifying Officers, Salespersons & Reporting Changes 1.5 Rules of Conduct: Place of Business, Advertising, Written Agreements & Records 1.6 Complaints, Investigations, Hearings, Arbitration & Penalties
2 Chapter 2: Codes, Permits, Civil Rights & Environmental Rules
2.1 The State Construction Code, Permits & Inspections 2.2 Civil Rights, Fair Housing, ADA & Michigan Barrier-Free Design 2.3 EPA Hazardous-Materials Rules: Lead-Safe Renovation, Asbestos & Radon
3 Chapter 3: Business Organization, Contracts & In-Home Sales
3.1 Types of Business Organization: Sole Proprietorship, Partnership, LLC & Corporation 3.2 Contract Essentials: Requirements, Types, Terminology & When a Contract Binds 3.3 Addenda, Change Orders, Allowances, Schedules, Warranties, Financing & Breach 3.4 In-Home Sales: The Home Solicitation Sales Act & Door-to-Door Roofing Sales
4 Chapter 4: Project Management, Accounting, Taxes & Personnel
4.1 Project Management & Administration: Quality, Logistics, Schedules, Draws & Retainage 4.2 Accounting & Finance: Costs, Receivables, Cash Flow, Financial Statements & Ratios 4.3 Payroll & Tax Obligations: Federal, Michigan, Unemployment & Sales/Use Tax 4.4 Personnel: MIOSHA Administration, Recordkeeping, Wages, Minors & Benefits
5 Chapter 5: Insurance, Bonds & Construction Liens
5.1 Insurance for Roofing Contractors: Liability, Workers' Compensation, Vehicles, Property & Builders' Risk 5.2 Bonds, Public Works Bonding & the Building Contract Fund Act 5.3 Construction Lien Act I: Notices of Commencement & Furnishing, Sworn Statements & Waivers 5.4 Construction Lien Act II: Claims of Lien, Foreclosure, Priority & Residential Protections
6 Chapter 6: Roofing Safety & Public Protection (MIOSHA)
6.1 MIOSHA Part 45 Fall Protection & Personal Fall Arrest Systems 6.2 Guardrails, Safety Nets, Warning Lines, Safety Monitors, Covers & Fall Protection Plans 6.3 Ladders, Scaffolds, Roof Brackets & Aerial Lifts (MIOSHA Parts 11, 12 & 32) 6.4 Hazard Communication, SDS, Silica, Lead & Asbestos Exposure, Power Lines & Heat 6.5 Hoisting & Lift Equipment, Fire Prevention, PPE, Barricades, Debris & Recycling
7 Chapter 7: Planning, Structure & Estimating
7.1 Roof Types, Framing Terminology & Structural Loads 7.2 Pre-Job Walk-Through, Plans & Details, Permits & Selecting the Roof System 7.3 Roof Geometry, Slope, Pitch & Slope Factors for Measuring Roofs 7.4 Material Takeoffs: Squares, Bundles, Waste, Underlayment, Ice Barrier, Metals & Fasteners 7.5 Labor, Subcontractor & Access Costs and Preparing the Estimate
8 Chapter 8: Tear-Off, Deck Preparation & Underlayment
8.1 Roof Sheathing: Panel Grades, Spans, Edge Support & Nailing 8.2 Tear-Off vs. Recover, Reroofing Rules & Preparing the Site (MRC R908) 8.3 Michigan's Ice Barrier Requirement: Coverage, Materials & Detailing (R905.1.2) 8.4 Underlayment: Standards, Application by Slope & Attachment (R905.1.1) 8.5 Roof & Ceiling Insulation, Vapor Retarders, Air Sealing & Unvented Assemblies
9 Chapter 9: Steep-Slope Roof Systems
9.1 Asphalt Shingles: Types, ASTM D3462, Wind Classes, Impact & Fire Ratings 9.2 Installing Asphalt Shingles: Starter, Exposure, Nailing, Steep Slopes & Caps 9.3 Valleys: Linings, Open Metal, Closed-Cut & Woven Valleys 9.4 Metal Roof Systems, Tile, Slate & Wood Shingles and Shakes
10 Chapter 10: Low-Slope Roof Systems & Drainage
10.1 Single-Ply Membranes: EPDM, TPO & PVC 10.2 Built-Up Roofing & Modified Bitumen: Materials, Application, Kettles & Torch Safety 10.3 Low-Slope Drainage: Positive Drainage, Roof Drains, Overflow Scuppers & Correcting Ponding
11 Chapter 11: Flashings, Transitions & Penetrations
11.1 Drip Edge & Roof-Edge Metals (R905.2.8.5 and R903.2) 11.2 Sidewalls, Headwalls, Kick-Outs, Counterflashing & Pitch Transitions 11.3 Chimneys & Crickets, Skylights, Pipes, Flues, Exhaust Vents & Solar
12 Chapter 12: Ventilation, Inspection & Repair
12.1 Attic Ventilation Requirements & Net Free Vent Area Calculations (MRC R806) 12.2 Balanced Airflow, Vent Installation Practice & Preventing Ice Dams 12.3 Roof Inspections, Leak Diagnosis, Repairs & Roofovers
9.3 Valleys: Linings, Open Metal, Closed-Cut & Woven Valleys
Key Takeaways Explain This Topic AI
Valley linings are installed per the manufacturer's instructions before shingles. An open metal valley lining must be at least 24 inches wide and made of a metal from Table R905.2.8.2.
An open valley may be lined with two plies of mineral-surfaced roll roofing, an 18-inch bottom layer and a top layer at least 36 inches wide.
A closed valley may be lined with one ply of smooth roll roofing at least 36 inches wide, or with the open-valley linings, and ASTM D1970 self-adhering membrane may be used in place of the lining.
Table R905.2.8.2 lists galvanized steel at 0.0179 inch (26 gauge, G90), aluminum at 0.024 inch, stainless steel at 28 gauge, and cold-rolled copper at 16 ounces per square foot.
Manufacturers typically require keeping nails at least 6 inches from the valley centerline, trimming closed-cut shingles about 2 inches back from the centerline, and clipping upper corners.
Last updated: September 2026
Code Requirements for Asphalt Shingle Valleys (R905.2.8.2)
Valley linings are installed according to the manufacturer's instructions before applying shingles . The permitted linings:
Open valleys lined with metal: lining at least 24 inches wide , made of a corrosion-resistant metal from Table R905.2.8.2 .
Open valleys lined with roll roofing: two plies of mineral-surfaced roll roofing meeting ASTM D3909 or ASTM D6380 Class M. The bottom layer is 18 inches wide and the top layer at least 36 inches wide.
Closed valleys (covered with shingles): one ply of smooth roll roofing meeting ASTM D6380, at least 36 inches wide, or either of the linings above.
Self-adhering polymer-modified bitumen underlayment meeting ASTM D1970 may be used in place of the lining material. This is the usual choice on Michigan roofs, because valleys hold snow and ice.
Table R905.2.8.2 Valley Lining Metals
- Material Minimum thickness, gauge, or weight
- Cold-rolled copper 0.0216 in nominal (16 oz per sq ft), ASTM B370
- Lead-coated copper 0.0216 in nominal (16 oz), ASTM B101
- High-yield copper 0.0162 in nominal (12 oz), ASTM B370
- Lead-coated high-yield copper 0.0162 in nominal (12 oz), ASTM B101
- Aluminum 0.024 in
- Stainless steel 28 gauge
- Galvanized steel 0.0179 in (26 gauge, zinc-coated G90)
- Zinc alloy 0.027 in
- Lead 2 1/2 lb
- Painted terne 20 lb
- Open Metal Valleys
The shingles stop short of the centerline, leaving the metal exposed. Typical manufacturer details:
Install the lining (usually D1970 membrane), then the metal, which is often preformed with a center diverter rib to keep water from one slope from running across and under the shingles on the other.
Fasten the metal near its outer edges only , with clips or nails, as the metal and shingle makers direct. Do not nail through the open channel.
Snap two chalk lines for the shingle edges. Manufacturers commonly start about 6 inches apart at the top (3 inches each side of center) and widen them about 1/8 inch per foot toward the eave, because the valley carries more water lower down. Follow the specific instructions.
Clip the upper corner of each shingle that ends at the valley so water is directed into the channel. Bed the edges in asphalt cement where instructed. Keep nails away from the metal channel.
Open metal valleys shed snow and debris well and suit laminated shingles, slate, and tile.
Closed-Cut Valleys
The most common asphalt shingle valley. Typical manufacturer steps:
Install the lining.
Lay shingles on one roof plane (often the lower-slope or smaller plane) across the valley and at least about 12 inches onto the adjoining plane. Keep nails at least 6 inches from the centerline .
Apply shingles on the other plane over the first, then snap a line about 2 inches back from the centerline on that side.
Trim along the line, clip the upper corners , and bed the cut edges in asphalt cement if the manufacturer calls for it.
Protect the lower layer while cutting. Slip a scrap of metal under the line so the knife does not cut the shingles or lining.
Woven Valleys
Shingles from both planes are interlaced across the valley, course by course. This works with flexible 3-tab shingles. Many manufacturers do not permit weaving laminated shingles , because the thick layers bridge the valley and trap water. Check the instructions. Keep nails out of the valley center.
Other Roof Coverings
Covering Valley rule (2015 MRC)
Clay and concrete tile (R905.3.8) Valley flashing at least 11 inches each side of center, with a splash diverter rib at least 1 inch high, 4-inch end laps, and 36-inch Type I underlayment under it on slopes of 3:12 and up. In areas with an average January temperature of 25°F or less, the valley underlayment is solid-cemented below 7:12 or is self-adhering membrane
Metal roof shingles (R905.4.6) Metal flashing at least 8 inches each side of center, with a 3/4-inch diverter rib, 4-inch end laps, and a 36-inch underlayment layer under it. Same cold-climate rule
Slate (R905.6.6) Sheet metal valley flashing at least 15 inches wide, minimum 0.0179-inch G90 galvanized
Wood shingles (R905.7.6) At least No. 26 gauge (0.019 in) metal, extending 10 inches each side of center below 12:12 and 7 inches at 12:12 and steeper, with 4-inch end laps
Wood shakes (R905.8.8) At least No. 26 gauge metal, extending 11 inches each side of center, with 4-inch end laps
Valley Troubleshooting
Leaks near the bottom: often water overshooting a closed valley on steep-to-shallow intersections, a missing kick at the eave, or ice damming. Check that the ice barrier and valley lining run under the eave detail.
Leaks along the middle: nails too close to the centerline, cut shingles not clipped, or debris dams.
Cracked shingles in a woven valley: usually laminated shingles bent too sharply, or cold-weather weaving.