Study guide

1.3 Personal Licenses, Scope of Work & Electrical Contractors

Minnesota Journeyman Electrician Study Guide Exam

Track your progress as you read

Finished sections get a check mark.

1 Minnesota Exam, Licensing & Electrical Law

1.1 Exam Format, Provided References, Scoring & Scheduling 1.2 The Minnesota Electrical Act, Board of Electricity & Code Adoption 1.3 Personal Licenses, Scope of Work & Electrical Contractors 1.4 Experience Credit, Registration, Reciprocity, Renewal & Continuing Education 1.5 Direct Supervision, Ratios & Licensing Exemptions 1.6 Electrical Permits, Inspections, Condemnation & Enforcement

2 Electrical Theory, Math & Power Calculations

2.1 Exam Math, Ohm's Law, Watt's Law & Series/Parallel Circuits 2.2 AC Fundamentals: Reactance, Impedance & Power Factor 2.3 Three-Phase Systems: Wye vs. Delta Calculations 2.4 Voltage Drop Calculations & Chapter 9 Conductor Properties 2.5 Transformer Ratios, Connections, Taps & Available Fault Current 2.6 Motor Connections, Control Circuits & Troubleshooting

3 NEC Structure & General Requirements

3.1 Navigating the 2026 NEC: Article 90, Code Structure & Article 100 Definitions 3.2 NEC Article 110: Working Clearances, Dedicated Space & Termination Ratings 3.3 Over-1000-Volt Installations, Guarding & Manholes (Article 110, Parts III–V)

4 Conductors, Identification & Ampacity

4.1 Conductor Insulation Types, Copper vs. Aluminum & Table 310.16 Allowable Ampacities 4.2 Ampacity Derating: Ambient Temperature Correction & Raceway Bundling Adjustments 4.3 Conductor Identification, Splices & Parallel Conductors

5 Branch Circuits, GFCI/AFCI & Required Outlets

5.1 Branch Circuit Sizing, Overcurrent Ratings & Multiwire Branch Circuits 5.2 GFCI & AFCI Protection Requirements (NEC 210.8 & 210.12) 5.3 Dwelling Receptacle Outlets, Required Circuits & Lighting Outlets (NEC 210.11, 210.52, 210.63 & 210.70)

6 Load Calculations (2026 NEC Article 120)

6.1 Article 120 Basics: Dwelling Lighting, Small-Appliance & Laundry Loads 6.2 Dwelling Standard Method: Appliances, Dryers, Ranges, Heating, EVSE & Neutral 6.3 Optional Methods: Single Dwelling, Existing Dwelling & Multifamily (2026 NEC 120.82–120.85) 6.4 Commercial Lighting, Receptacle, Sign & Show-Window Loads (Table 120.42(A) & 120.44) 6.5 Commercial Kitchens, Schools & Restaurants (2026 NEC 120.56, 120.86 & 120.88) 6.6 Farm Load Calculations (2026 NEC 120.102 & 120.103) 6.7 Feeder & Service Neutral Sizing (2026 NEC 120.61)

7 Feeders, Outside Wiring & Services

7.1 Feeder Design & Sizing Requirements (NEC Article 215) 7.2 Outside Feeders & Separate Buildings (Article 225 & 250.32) 7.3 Service Clearances, Overhead Drops & Underground Service Laterals 7.4 Service Equipment, Disconnecting Means, Surge Protection & GFPE (2026 NEC Article 230)

8 Overcurrent Protection

8.1 Overcurrent Protective Devices: Fuses, Breakers & Standard Ampere Ratings 8.2 Conductor Overcurrent Protection & Feeder Tap Rules (NEC 240.4 & 240.21) 8.3 OCPD Location, Breaker Voltage Ratings, Handle Ties & Arc Energy Reduction

9 System Grounding & Grounding Electrodes

9.1 Grounding vs. Bonding Principles & System Grounding (NEC Article 250 Parts I-II) 9.2 Grounding Electrode System: Permitted Electrodes & Installation (NEC 250.50 & 250.52) 9.3 Grounding Electrode Conductor (GEC) Sizing & Protection (NEC Table 250.66) 9.4 Main Bonding Jumper, System Bonding Jumper & Separately Derived Systems

10 Bonding & Equipment Grounding

10.1 Equipment Grounding Conductor (EGC) Types, Identification & Sizing (NEC Table 250.122) 10.2 Proportional Upsizing of EGC for Voltage Drop (NEC 250.122(B)) 10.3 Bonding of Interior Metal Piping, Structural Steel & Other Systems (NEC 250.104) 10.4 Bonding Methods, Equipment Requiring Grounding & Receptacle Grounding

11 General Wiring Methods & Underground Installations

11.1 General Wiring Methods & Mechanical Protection (NEC Article 300) 11.2 Underground Wiring Cover Requirements (NEC Table 300.7) 11.3 Securing & Supporting, Plenums, Firestopping & Raceway Installation (Article 300)

12 Raceways, Cables & Conduit Fill

12.1 Metal (RMC, IMC, EMT) & Nonmetallic (PVC, RTRC, LFNC) Raceways 12.2 Flexible Conduits, ENT, Wireways, Auxiliary Gutters & Surface Raceways 12.3 Busways & Cable Tray Systems (Articles 368 & 392) 12.4 Cable Assemblies (NM, UF, MC) & Minnesota Cold-Weather Installation Rules 12.5 Conduit & Tubing Fill Calculations (Chapter 9 & Annex C)

13 Boxes, Conduit Bodies & Cabinets

13.1 Box Installation, Support, Accessibility & Luminaire and Fan Boxes (Article 314) 13.2 Outlet, Switch & Junction Box Fill Calculations (NEC 314.16) 13.3 Pull and Junction Box Sizing for Conductors 4 AWG & Larger (NEC 314.28) 13.4 Cabinets, Cutout Boxes & Wire Bending Space (NEC Article 312)

14 Cords, Wiring Devices, Panelboards, Luminaires & Appliances

14.1 Flexible Cords, Flexible Cables & Fixture Wires (Articles 400 & 402) 14.2 Switches, Receptacles & Wiring Devices (Articles 404 & 406) 14.3 Panelboards, Switchboards & Switchgear (NEC Article 408) 14.4 Luminaires, Lampholders, Lighting Track & Low-Voltage Lighting (Articles 410 & 411) 14.5 Appliances, Fixed Electric Space Heating & Deicing Equipment (Articles 422, 424 & 426)

15 Motors, Controllers & Air Conditioning

15.1 Motor Full-Load Current Determination & Conductor Sizing (NEC 430.6 & 430.22) 15.2 Motor Branch-Circuit Short-Circuit & Ground-Fault Protection (NEC Table 430.52) 15.3 Motor Overload Protection & Feeder Calculations for Multiple Motors (NEC 430.32 & 430.24) 15.4 Motor Controllers, Disconnecting Means, Drives & Motor Control Centers (Article 430 Parts VII–XI) 15.5 Air Conditioning & Refrigeration Equipment (NEC Article 440)

16 Transformers, Generators & Equipment Over 1000 Volts

16.1 Transformer Overcurrent Protection & Sizing (NEC Article 450) 16.2 Generators & Transfer Switches (NEC Article 445) 16.3 Capacitors, Transformers Over 1000 V & Medium-Voltage Equipment (Articles 460, 450 & 495)

17 Hazardous (Classified) Locations

17.1 Hazardous (Classified) Locations: Classes, Divisions & Zones (NEC Articles 500-506) 17.2 Class I Locations: Wiring Methods & Conduit Seal-Offs (NEC Article 501) 17.3 Class II & Class III Locations and the Zone System (Articles 502, 503, 505 & 506) 17.4 Commercial Garages & Motor Fuel Dispensing Facilities (NEC Articles 511 & 514) 17.5 Spray Areas, Aircraft Hangars, Hazardous-Location Bonding & Intrinsic Safety (Articles 500, 504, 513 & 516)

18 Health Care, Assembly, Agricultural & Mobile Occupancies

18.1 Health Care Facilities: Patient Care Spaces & Redundant Grounding (NEC Article 517) 18.2 Places of Assembly, Carnivals & Fairs, and Temporary Installations (Articles 518, 525 & 590) 18.3 Agricultural Buildings, Equipotential Planes & Farm Distribution Points (Article 547) 18.4 Mobile & Manufactured Homes, RV Parks, and Marinas & Docks (Articles 550, 551 & 555)

19 Signs, Elevators, Pools, Solar & Other Specific Equipment

19.1 Signs & Outline Lighting, Office Partitions, IT Rooms & Irrigation Machines (Articles 600, 605, 645 & 675) 19.2 Elevators, Escalators & Platform Lifts (Article 620) 19.3 Swimming Pools, Spas & Water Features: Equipotential Bonding & GFCI (NEC Article 680) 19.4 Spas, Hot Tubs, Hydromassage Bathtubs, Fountains & Natural Bodies of Water (Article 680 Parts IV–VII & Article 682) 19.5 Solar Photovoltaic Systems (Article 690) 19.6 Small Wind Systems, Fire Pumps & Electric Vehicle Charging (Articles 694, 695 & 625)

20 Emergency, Standby & Interconnected Power Sources

20.1 Emergency Systems vs. Legally Required vs. Optional Standby (NEC Articles 700, 701, 702) 20.2 Interconnected Power Sources, Energy Storage & Power Control Systems (Articles 705, 706, 480 & 130)

21 Limited-Energy, Fire Alarm & Communications Systems

21.1 Remote-Control, Signaling & Power-Limited Circuits: Class 1, 2 & 3 (2026 Articles 206, 720–725) 21.2 Class 4 Fault-Managed Power, Tray Cables, Fire-Resistive Cable Systems & Limited-Energy Grounding (Articles 726, 727, 742, 750 & 772) 21.3 Fire Alarm Systems: NPLFA vs. PLFA Wiring & Overcurrent Protection (NEC Article 760) 21.4 Optical Fiber Cables & Communications Systems Entering Buildings (2026 Articles 720–723, 800, 810, 820)

1.3 Personal Licenses, Scope of Work & Electrical Contractors

Key Takeaways Explain This Topic AI

A Class A journeyworker license requires at least four years (48 months) of acceptable experience, with up to one year of credit for an approved two-year post-high-school electrical course.

A Class A master electrician applicant needs a four-year electrical engineering degree, one year as a licensed journeyworker, or five years of planning, layout, supervision, and installation experience.

Each electrical contractor must give a $25,000 bond and carry liability insurance of at least $100,000 per occurrence and $300,000 aggregate for bodily injury plus $50,000 property damage, or a $300,000 single limit.

A responsible licensed individual may serve only one contractor or employer at a time (Minn. Stat. 326B.33, subd. 17).

No new Class B master or Class B journeyworker licenses have been issued since August 1, 1985.

Last updated: October 2026

Why license scope matters

Most Minnesota electrical work is done by three groups: licensed individuals , registered unlicensed individuals working under them, and licensed contractors that employ both. The exam tests whether you know what each license allows, how each is earned, and what a contractor must maintain. All of these rules are in Minn. Stat. 326B.33 and in Minnesota Rules chapter 3800 , both of which are in the exam booklet.

Personal license classes

License What the holder may do Qualifying experience (326B.33)

Class A master electrician Perform and supervise any electrical work, including planning and layout 4-year electrical engineering degree, or 1 year as a licensed journeyworker, or 5 years in planning, layout, supervision, and installation

Class A journeyworker electrician Perform and supervise any electrical work except planning or laying out 4 years (48 months); up to 1 year credit for an approved 2-year post-high-school electrical course

Maintenance electrician Maintain and repair wiring, apparatus, and equipment for a contractor or as a full-time employee of one employer on its own property 48 months; up to 1 year course credit

Power limited technician (PLT) Install, alter, repair, plan, lay out, and supervise technology circuits or systems Electrical engineering degree or 36 months; up to 12 months credit for approved training

Satellite system installer Satellite broadcast communication systems only Approved national certification program plus a DLI exam

Class A installer Major home appliances on the load side of the service on farmsteads and in small towns No new licenses since December 1, 2007

Class B installer Center pivot irrigation booms on farmsteads and other equipment DLI approves 1 year experience or an approved post-high-school course

Lineman Install, maintain, and repair transmission and distribution systems owned or leased by a utility 48 months

Elevator constructor / master elevator constructor Elevator and escalator wiring 36 months / 60 months

Class B master and Class B journeyworker licenses are grandfathered. No new ones have been issued since August 1, 1985 . Existing holders may renew and work on single-phase systems of not over 200 amperes on farmsteads or single-family dwellings in towns with fewer than 2,500 inhabitants.

Where a journeyworker may work

Under 326B.33, subdivision 2, a journeyworker may perform and supervise electrical work only when the work is:

for a contractor , and the journeyworker is an employee, partner, or officer of the licensed contractor; or

performed under the supervision of a master electrician employed by the same employer on wiring, apparatus, or equipment the employer owns or leases on property it operates.

A journeyworker license does not authorize anyone to contract for electrical work with the public. Subdivision 14 requires a separate contractor's license for anyone who performs or offers to perform electrical work, other than an employee, partner, or officer of a licensed contractor.

  • Electrical contractors
  • License, bond, and insurance
  • Requirement Statute Amount or rule
  • Contractor license 326B.33, subd. 14 Required to perform or offer electrical work for others
  • Bond subd. 15 $25,000 penal sum to the state

General liability insurance subd. 16 At least $100,000 per occurrence and $300,000 aggregate for bodily injury, plus $50,000 property damage; or a single limit of $300,000 per occurrence and $300,000 aggregate

Certificate of insurance subd. 16 Kept on file with the commissioner; the insurer must notify DLI of cancellation

Installers (Class A and B) give a separate $1,000 bond (subd. 6).

The responsible licensed individual

Every contractor must designate a responsible master electrician , power limited technician, or satellite system installer (326B.33, subd. 17). That individual is responsible for all electrical work complying with the Act, the rules, and DLI orders. The classes of work the contractor may perform are limited to those the responsible licensed individual is licensed to perform. Key limits:

An individual may be the responsible licensed individual for only one contractor or employer .

If the responsible person is a managing employee rather than an owner, partner, member, or officer, they must be actively engaged in electrical work for that contractor and may not work for any other contractor or employer.

When the license is held by a business whose principal is not the responsible person, requests for inspection must be signed by the responsible licensed individual .

Minnesota Rules part 3800.3540 adds procedures. The responsible person must give the contractor and DLI at least 15 days' notice before resigning. After a termination or separation, the contractor has 30 days to file a replacement certificate; otherwise the contractor license becomes invalid and the contractor must stop electrical work.

Business conduct rules

Advertising (3800.3560): Any advertisement offering electrical work must show the contractor's name as it appears on the license.

Vehicle marking (3800.3570): Vehicles used for licensed electrical work must show the contractor's name and license number on each side in contrasting color, with characters at least 3 inches high and ½ inch wide .

Keeping information current (3800.3530): Contractors must notify DLI within 30 days of changes in required information.

Employers that are not contractors

A business whose own employees maintain the business's electrical systems can operate without a contractor license. Under 326B.33, subdivision 21(a), its maintenance electricians may even be exempt from licensing when they maintain and repair equipment on the employer's property under a licensed master electrician, maintenance electrician, power limited technician, or electrical engineer. The employer must keep a current certificate of responsible person on file with DLI. Under 326B.33, subdivision 19(c), the filing fee is $100 , and Minnesota Rules part 3800.3550 requires resubmittal every two years . "Maintaining and repairing" means fixing or replacing worn or defective parts, including defective receptacles and manual lighting switches. It does not include new wiring, additions, alterations, or extensions (Minn. R. 3800.3500, subp. 8).

License terms

Under 326B.33, subdivision 19:

Master licenses expire March 1 of odd-numbered years . DLI describes this as the last day of February of each odd-numbered year.

Contractor licenses expire March 1 of even-numbered years.

All other personal licenses , including the journeyworker license, expire two years from original issuance and every two years after that.

Registrations of unlicensed individuals expire one year from issuance.

For fee purposes, the journeyworker, installer, lineman, maintenance, satellite installer, and power limited technician licenses are all "journeyworker" class licenses. Section 1.4 covers renewal and continuing education.

Worked scenarios

Scenario 1 — Side job. A licensed journeyworker who works for a contractor during the week wires a basement for a neighbor on a Saturday for cash. The work is not for a licensed contractor, and the journeyworker holds no contractor license. This violates 326B.33, subdivision 14, even though the journeyworker is competent to do the wiring.

Scenario 2 — Small contractor. A master electrician forms an LLC and is its chief manager. The LLC needs a contractor license, a $25,000 bond, liability insurance on file, and a designation of the master as responsible licensed individual. The master may not also serve as the responsible person for another company.