Study guide
1.2 The Minnesota Electrical Act, Board of Electricity & Code Adoption
Minnesota Journeyman Electrician Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Minnesota Exam, Licensing & Electrical Law
1.1 Exam Format, Provided References, Scoring & Scheduling 1.2 The Minnesota Electrical Act, Board of Electricity & Code Adoption 1.3 Personal Licenses, Scope of Work & Electrical Contractors 1.4 Experience Credit, Registration, Reciprocity, Renewal & Continuing Education 1.5 Direct Supervision, Ratios & Licensing Exemptions 1.6 Electrical Permits, Inspections, Condemnation & Enforcement
2 Electrical Theory, Math & Power Calculations
2.1 Exam Math, Ohm's Law, Watt's Law & Series/Parallel Circuits 2.2 AC Fundamentals: Reactance, Impedance & Power Factor 2.3 Three-Phase Systems: Wye vs. Delta Calculations 2.4 Voltage Drop Calculations & Chapter 9 Conductor Properties 2.5 Transformer Ratios, Connections, Taps & Available Fault Current 2.6 Motor Connections, Control Circuits & Troubleshooting
3 NEC Structure & General Requirements
3.1 Navigating the 2026 NEC: Article 90, Code Structure & Article 100 Definitions 3.2 NEC Article 110: Working Clearances, Dedicated Space & Termination Ratings 3.3 Over-1000-Volt Installations, Guarding & Manholes (Article 110, Parts III–V)
4 Conductors, Identification & Ampacity
4.1 Conductor Insulation Types, Copper vs. Aluminum & Table 310.16 Allowable Ampacities 4.2 Ampacity Derating: Ambient Temperature Correction & Raceway Bundling Adjustments 4.3 Conductor Identification, Splices & Parallel Conductors
5 Branch Circuits, GFCI/AFCI & Required Outlets
5.1 Branch Circuit Sizing, Overcurrent Ratings & Multiwire Branch Circuits 5.2 GFCI & AFCI Protection Requirements (NEC 210.8 & 210.12) 5.3 Dwelling Receptacle Outlets, Required Circuits & Lighting Outlets (NEC 210.11, 210.52, 210.63 & 210.70)
6 Load Calculations (2026 NEC Article 120)
6.1 Article 120 Basics: Dwelling Lighting, Small-Appliance & Laundry Loads 6.2 Dwelling Standard Method: Appliances, Dryers, Ranges, Heating, EVSE & Neutral 6.3 Optional Methods: Single Dwelling, Existing Dwelling & Multifamily (2026 NEC 120.82–120.85) 6.4 Commercial Lighting, Receptacle, Sign & Show-Window Loads (Table 120.42(A) & 120.44) 6.5 Commercial Kitchens, Schools & Restaurants (2026 NEC 120.56, 120.86 & 120.88) 6.6 Farm Load Calculations (2026 NEC 120.102 & 120.103) 6.7 Feeder & Service Neutral Sizing (2026 NEC 120.61)
7 Feeders, Outside Wiring & Services
7.1 Feeder Design & Sizing Requirements (NEC Article 215) 7.2 Outside Feeders & Separate Buildings (Article 225 & 250.32) 7.3 Service Clearances, Overhead Drops & Underground Service Laterals 7.4 Service Equipment, Disconnecting Means, Surge Protection & GFPE (2026 NEC Article 230)
8 Overcurrent Protection
8.1 Overcurrent Protective Devices: Fuses, Breakers & Standard Ampere Ratings 8.2 Conductor Overcurrent Protection & Feeder Tap Rules (NEC 240.4 & 240.21) 8.3 OCPD Location, Breaker Voltage Ratings, Handle Ties & Arc Energy Reduction
9 System Grounding & Grounding Electrodes
9.1 Grounding vs. Bonding Principles & System Grounding (NEC Article 250 Parts I-II) 9.2 Grounding Electrode System: Permitted Electrodes & Installation (NEC 250.50 & 250.52) 9.3 Grounding Electrode Conductor (GEC) Sizing & Protection (NEC Table 250.66) 9.4 Main Bonding Jumper, System Bonding Jumper & Separately Derived Systems
10 Bonding & Equipment Grounding
10.1 Equipment Grounding Conductor (EGC) Types, Identification & Sizing (NEC Table 250.122) 10.2 Proportional Upsizing of EGC for Voltage Drop (NEC 250.122(B)) 10.3 Bonding of Interior Metal Piping, Structural Steel & Other Systems (NEC 250.104) 10.4 Bonding Methods, Equipment Requiring Grounding & Receptacle Grounding
11 General Wiring Methods & Underground Installations
11.1 General Wiring Methods & Mechanical Protection (NEC Article 300) 11.2 Underground Wiring Cover Requirements (NEC Table 300.7) 11.3 Securing & Supporting, Plenums, Firestopping & Raceway Installation (Article 300)
12 Raceways, Cables & Conduit Fill
12.1 Metal (RMC, IMC, EMT) & Nonmetallic (PVC, RTRC, LFNC) Raceways 12.2 Flexible Conduits, ENT, Wireways, Auxiliary Gutters & Surface Raceways 12.3 Busways & Cable Tray Systems (Articles 368 & 392) 12.4 Cable Assemblies (NM, UF, MC) & Minnesota Cold-Weather Installation Rules 12.5 Conduit & Tubing Fill Calculations (Chapter 9 & Annex C)
13 Boxes, Conduit Bodies & Cabinets
13.1 Box Installation, Support, Accessibility & Luminaire and Fan Boxes (Article 314) 13.2 Outlet, Switch & Junction Box Fill Calculations (NEC 314.16) 13.3 Pull and Junction Box Sizing for Conductors 4 AWG & Larger (NEC 314.28) 13.4 Cabinets, Cutout Boxes & Wire Bending Space (NEC Article 312)
14 Cords, Wiring Devices, Panelboards, Luminaires & Appliances
14.1 Flexible Cords, Flexible Cables & Fixture Wires (Articles 400 & 402) 14.2 Switches, Receptacles & Wiring Devices (Articles 404 & 406) 14.3 Panelboards, Switchboards & Switchgear (NEC Article 408) 14.4 Luminaires, Lampholders, Lighting Track & Low-Voltage Lighting (Articles 410 & 411) 14.5 Appliances, Fixed Electric Space Heating & Deicing Equipment (Articles 422, 424 & 426)
15 Motors, Controllers & Air Conditioning
15.1 Motor Full-Load Current Determination & Conductor Sizing (NEC 430.6 & 430.22) 15.2 Motor Branch-Circuit Short-Circuit & Ground-Fault Protection (NEC Table 430.52) 15.3 Motor Overload Protection & Feeder Calculations for Multiple Motors (NEC 430.32 & 430.24) 15.4 Motor Controllers, Disconnecting Means, Drives & Motor Control Centers (Article 430 Parts VII–XI) 15.5 Air Conditioning & Refrigeration Equipment (NEC Article 440)
16 Transformers, Generators & Equipment Over 1000 Volts
16.1 Transformer Overcurrent Protection & Sizing (NEC Article 450) 16.2 Generators & Transfer Switches (NEC Article 445) 16.3 Capacitors, Transformers Over 1000 V & Medium-Voltage Equipment (Articles 460, 450 & 495)
17 Hazardous (Classified) Locations
17.1 Hazardous (Classified) Locations: Classes, Divisions & Zones (NEC Articles 500-506) 17.2 Class I Locations: Wiring Methods & Conduit Seal-Offs (NEC Article 501) 17.3 Class II & Class III Locations and the Zone System (Articles 502, 503, 505 & 506) 17.4 Commercial Garages & Motor Fuel Dispensing Facilities (NEC Articles 511 & 514) 17.5 Spray Areas, Aircraft Hangars, Hazardous-Location Bonding & Intrinsic Safety (Articles 500, 504, 513 & 516)
18 Health Care, Assembly, Agricultural & Mobile Occupancies
18.1 Health Care Facilities: Patient Care Spaces & Redundant Grounding (NEC Article 517) 18.2 Places of Assembly, Carnivals & Fairs, and Temporary Installations (Articles 518, 525 & 590) 18.3 Agricultural Buildings, Equipotential Planes & Farm Distribution Points (Article 547) 18.4 Mobile & Manufactured Homes, RV Parks, and Marinas & Docks (Articles 550, 551 & 555)
19 Signs, Elevators, Pools, Solar & Other Specific Equipment
19.1 Signs & Outline Lighting, Office Partitions, IT Rooms & Irrigation Machines (Articles 600, 605, 645 & 675) 19.2 Elevators, Escalators & Platform Lifts (Article 620) 19.3 Swimming Pools, Spas & Water Features: Equipotential Bonding & GFCI (NEC Article 680) 19.4 Spas, Hot Tubs, Hydromassage Bathtubs, Fountains & Natural Bodies of Water (Article 680 Parts IV–VII & Article 682) 19.5 Solar Photovoltaic Systems (Article 690) 19.6 Small Wind Systems, Fire Pumps & Electric Vehicle Charging (Articles 694, 695 & 625)
20 Emergency, Standby & Interconnected Power Sources
20.1 Emergency Systems vs. Legally Required vs. Optional Standby (NEC Articles 700, 701, 702) 20.2 Interconnected Power Sources, Energy Storage & Power Control Systems (Articles 705, 706, 480 & 130)
21 Limited-Energy, Fire Alarm & Communications Systems
21.1 Remote-Control, Signaling & Power-Limited Circuits: Class 1, 2 & 3 (2026 Articles 206, 720–725) 21.2 Class 4 Fault-Managed Power, Tray Cables, Fire-Resistive Cable Systems & Limited-Energy Grounding (Articles 726, 727, 742, 750 & 772) 21.3 Fire Alarm Systems: NPLFA vs. PLFA Wiring & Overcurrent Protection (NEC Article 760) 21.4 Optical Fiber Cables & Communications Systems Entering Buildings (2026 Articles 720–723, 800, 810, 820)
1.2 The Minnesota Electrical Act, Board of Electricity & Code Adoption
Key Takeaways Explain This Topic AI
Minn. Stat. 326B.31, subd. 8 lets a Class A journeyworker perform and supervise any electrical work except planning or laying out electrical work.
The Board of Electricity has 12 members: 11 appointed by the governor plus the commissioner of labor and industry or a designee as a voting member.
Minnesota Rules part 1315.0200 adopts the 2026 NEC (ANSI/NFPA 70-2026) as the Minnesota Electrical Code.
Under Minn. Stat. 326B.35, political subdivisions may make and enforce electrical requirements more stringent than the state standard.
Minnesota Rules part 3801.3620 requires electrical equipment to be listed and labeled by a testing laboratory unless an alternative evaluation or exemption applies.
Last updated: October 2026
Why the statute shows up on a code exam
The exam booklet includes the Minnesota Electrical Act , Minnesota Statutes sections 326B.31 through 326B.399 , and DLI's rules in Minnesota Rules chapters 3800 and 3801 . These laws decide who may do electrical work, what each license allows, how equipment is approved, and how installations are permitted and inspected. Questions about them are usually short, rule-based items, which makes them some of the easiest points on the exam if you know the vocabulary.
Key definitions in 326B.31
The Act starts with definitions. Learn these by subdivision because the booklet is organized that way.
Subd. Term What it means
8 Class A journeyworker electrician May perform and supervise any electrical work except planning or laying out electrical work
9 Class A master electrician May perform and supervise any electrical work
14 Contractor A person licensed to perform or offer to perform electrical work; a contractor license alone does not qualify anyone to do the work
16 Direct supervision Six conditions, including physical presence for the entire working day and review of the work before it is operated
17 Electrical work Installing, altering, repairing, planning, or laying out wiring, apparatus, or equipment for light, heat, power, technology circuits or systems, or other purposes
- 21 Maintenance electrician Qualified to maintain and repair wiring, apparatus, and equipment
- 23 Owner Individual who works on premises they own and occupy, or will occupy, as a residence
- 26a Request for inspection The application for, and issuance of, an electrical permit
27 Residential dwelling A single dwelling unit, including a garage and accessory building used only by its residents
28 Responsible licensed individual The master electrician, power limited technician, or other licensee a contractor designates as responsible for compliance
29 Technology circuits or systems Class 2, Class 3, or Class 4 circuits isolated from other circuits by a demarcation, plus antenna, communication, and Class 2/3 low-voltage lighting circuits
Two points generate many wrong answers. First, the journeyworker definition excludes planning and laying out ; section 326B.33, subdivision 12(b) reserves those tasks for master electricians and power limited technicians. Second, the Act's term for a permit is a request for inspection . Filing one is the same as applying for an electrical permit.
The Board of Electricity (326B.32)
Section 326B.32 creates the Board of Electricity with 12 members . Eleven are appointed by the governor with the advice and consent of the Senate. The twelfth is the commissioner of labor and industry or the commissioner's designee , who is a voting member. The 11 appointed seats are:
- Seats Required qualification
- 1 Electrical inspector
- 2 Representatives of electrical suppliers in rural areas
- 2 Master electricians who are contractors
- 2 Journeyworker electricians
- 1 Registered consulting electrical engineer
- 1 Power limited technician who is a technology system contractor
- 1 Power limited technician
- 1 Public member
Appointed members serve three-year terms ending December 31 and are limited to three consecutive terms . Except for the public member and the rural supplier representatives, appointed members must hold a current DLI electrical license (the engineer must hold a Minnesota professional engineering license) and must be Minnesota residents.
The board's powers include:
adopting the Minnesota Electrical Code , which must be the most current edition of the NEC and any amendments, through Chapter 14 rulemaking;
adopting rules for licensing and continuing education of electricians, contractors, installers, and power limited technicians;
approving license reciprocity agreements and recommending license fees; and
issuing final interpretations of the electrical code.
An electrical code amendment moves forward only if it receives an affirmative two-thirds vote of all voting members . Licensing and continuing-education rule proposals need a majority of all voting members. Outside the board's powers, the commissioner administers and enforces the law, including licensing, inspections, and penalties.
The safety standard and the adopted code
Section 326B.35 says all electrical wiring, apparatus, and equipment for light, heat, power, and technology circuits must comply with the rules of the department and the board and be installed in conformity with accepted standards of construction for safety to life and property. The current NEC, and the National Electrical Safety Code for utility-type work, are prima facie evidence of those accepted standards. The section also states that nothing prohibits a political subdivision from making and enforcing more stringent requirements , and licensed electricians working there must comply with them.
Minnesota Rules part 1315.0200 is titled the "Minnesota Electrical Code." Subpart 1a requires all new electrical wiring, apparatus, and equipment for light, heat, power, technology circuits and systems, and alarm and communication systems to comply with the 2026 edition of the National Electrical Code (ANSI/NFPA 70-2026) , incorporated by reference into the State Building Code. DLI's exam guide states that the 2026 NEC became effective August 17, 2026 , and is the edition used for exam questions.
Note
Minnesota adopts the NEC by reference. When a question asks what "the code" requires for an installation, answer from the 2026 NEC unless the question points to the Minnesota Electrical Act or chapters 3800 and 3801.
Approval of electrical equipment (Minn. R. 3801.3620)
NEC 110.2 says equipment must be acceptable only if approved. Minnesota defines how. Under Minnesota Rules part 3801.3620, subpart 1 , all electrical equipment (materials, fittings, devices, apparatus, fixtures, appliances, and utilization equipment) used in an installation must be listed and labeled by a testing laboratory . A testing laboratory is one that has given DLI a written report showing it has the facilities described in NEC 90.7, or one accredited under OSHA's Nationally Recognized Testing Laboratory program (part 3801.3619).
Subpart 2 offers alternatives for equipment the NEC does not specifically require to be listed:
Evaluation by a testing laboratory or by a registered or licensed electrical engineer with no financial interest in the equipment, with a written report filed with DLI. Identical units are covered for one year or until listed, and must carry a label referencing the evaluation.
Submission of unlisted equipment to another manufacturer of similar listed equipment for evaluation, correction, and labeling under procedures the testing laboratory accepts.
Subpart 3 exempts four categories, including industrial machinery whose components comply and whose wiring meets the NEC; equipment in a listed enclosure connected only to Class 2, communications, or other circuits of 30 volts or less with overcurrent protection of 8 amperes or less; and control equipment or utilization equipment containing eight or fewer listed components.
Inspection authority at a glance
Section 326B.36 requires every new installation, other than minor repair work, to be inspected by the commissioner unless a political subdivision provides similar inspection by ordinance. Inspectors must be licensed master or journeyworker electricians. Section 1.6 of this guide covers permits, rough-in and final inspections, condemnation orders, and penalties in detail.
Exam traps
"A journeyworker may lay out a job." False. Planning and laying out belong to master electricians and power limited technicians.
"Cities cannot exceed the state code." False. Section 326B.35 allows more stringent local requirements.
"Any equipment the inspector likes is approved." Minnesota requires listing and labeling by a testing laboratory, or one of the evaluation methods or exemptions in part 3801.3620.
"The Board has 12 governor appointees." The governor appoints 11; the commissioner or designee is the twelfth, voting member.