Study guide
1.5 Direct Supervision, Ratios & Licensing Exemptions
Minnesota Journeyman Electrician Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Minnesota Exam, Licensing & Electrical Law
1.1 Exam Format, Provided References, Scoring & Scheduling 1.2 The Minnesota Electrical Act, Board of Electricity & Code Adoption 1.3 Personal Licenses, Scope of Work & Electrical Contractors 1.4 Experience Credit, Registration, Reciprocity, Renewal & Continuing Education 1.5 Direct Supervision, Ratios & Licensing Exemptions 1.6 Electrical Permits, Inspections, Condemnation & Enforcement
2 Electrical Theory, Math & Power Calculations
2.1 Exam Math, Ohm's Law, Watt's Law & Series/Parallel Circuits 2.2 AC Fundamentals: Reactance, Impedance & Power Factor 2.3 Three-Phase Systems: Wye vs. Delta Calculations 2.4 Voltage Drop Calculations & Chapter 9 Conductor Properties 2.5 Transformer Ratios, Connections, Taps & Available Fault Current 2.6 Motor Connections, Control Circuits & Troubleshooting
3 NEC Structure & General Requirements
3.1 Navigating the 2026 NEC: Article 90, Code Structure & Article 100 Definitions 3.2 NEC Article 110: Working Clearances, Dedicated Space & Termination Ratings 3.3 Over-1000-Volt Installations, Guarding & Manholes (Article 110, Parts III–V)
4 Conductors, Identification & Ampacity
4.1 Conductor Insulation Types, Copper vs. Aluminum & Table 310.16 Allowable Ampacities 4.2 Ampacity Derating: Ambient Temperature Correction & Raceway Bundling Adjustments 4.3 Conductor Identification, Splices & Parallel Conductors
5 Branch Circuits, GFCI/AFCI & Required Outlets
5.1 Branch Circuit Sizing, Overcurrent Ratings & Multiwire Branch Circuits 5.2 GFCI & AFCI Protection Requirements (NEC 210.8 & 210.12) 5.3 Dwelling Receptacle Outlets, Required Circuits & Lighting Outlets (NEC 210.11, 210.52, 210.63 & 210.70)
6 Load Calculations (2026 NEC Article 120)
6.1 Article 120 Basics: Dwelling Lighting, Small-Appliance & Laundry Loads 6.2 Dwelling Standard Method: Appliances, Dryers, Ranges, Heating, EVSE & Neutral 6.3 Optional Methods: Single Dwelling, Existing Dwelling & Multifamily (2026 NEC 120.82–120.85) 6.4 Commercial Lighting, Receptacle, Sign & Show-Window Loads (Table 120.42(A) & 120.44) 6.5 Commercial Kitchens, Schools & Restaurants (2026 NEC 120.56, 120.86 & 120.88) 6.6 Farm Load Calculations (2026 NEC 120.102 & 120.103) 6.7 Feeder & Service Neutral Sizing (2026 NEC 120.61)
7 Feeders, Outside Wiring & Services
7.1 Feeder Design & Sizing Requirements (NEC Article 215) 7.2 Outside Feeders & Separate Buildings (Article 225 & 250.32) 7.3 Service Clearances, Overhead Drops & Underground Service Laterals 7.4 Service Equipment, Disconnecting Means, Surge Protection & GFPE (2026 NEC Article 230)
8 Overcurrent Protection
8.1 Overcurrent Protective Devices: Fuses, Breakers & Standard Ampere Ratings 8.2 Conductor Overcurrent Protection & Feeder Tap Rules (NEC 240.4 & 240.21) 8.3 OCPD Location, Breaker Voltage Ratings, Handle Ties & Arc Energy Reduction
9 System Grounding & Grounding Electrodes
9.1 Grounding vs. Bonding Principles & System Grounding (NEC Article 250 Parts I-II) 9.2 Grounding Electrode System: Permitted Electrodes & Installation (NEC 250.50 & 250.52) 9.3 Grounding Electrode Conductor (GEC) Sizing & Protection (NEC Table 250.66) 9.4 Main Bonding Jumper, System Bonding Jumper & Separately Derived Systems
10 Bonding & Equipment Grounding
10.1 Equipment Grounding Conductor (EGC) Types, Identification & Sizing (NEC Table 250.122) 10.2 Proportional Upsizing of EGC for Voltage Drop (NEC 250.122(B)) 10.3 Bonding of Interior Metal Piping, Structural Steel & Other Systems (NEC 250.104) 10.4 Bonding Methods, Equipment Requiring Grounding & Receptacle Grounding
11 General Wiring Methods & Underground Installations
11.1 General Wiring Methods & Mechanical Protection (NEC Article 300) 11.2 Underground Wiring Cover Requirements (NEC Table 300.7) 11.3 Securing & Supporting, Plenums, Firestopping & Raceway Installation (Article 300)
12 Raceways, Cables & Conduit Fill
12.1 Metal (RMC, IMC, EMT) & Nonmetallic (PVC, RTRC, LFNC) Raceways 12.2 Flexible Conduits, ENT, Wireways, Auxiliary Gutters & Surface Raceways 12.3 Busways & Cable Tray Systems (Articles 368 & 392) 12.4 Cable Assemblies (NM, UF, MC) & Minnesota Cold-Weather Installation Rules 12.5 Conduit & Tubing Fill Calculations (Chapter 9 & Annex C)
13 Boxes, Conduit Bodies & Cabinets
13.1 Box Installation, Support, Accessibility & Luminaire and Fan Boxes (Article 314) 13.2 Outlet, Switch & Junction Box Fill Calculations (NEC 314.16) 13.3 Pull and Junction Box Sizing for Conductors 4 AWG & Larger (NEC 314.28) 13.4 Cabinets, Cutout Boxes & Wire Bending Space (NEC Article 312)
14 Cords, Wiring Devices, Panelboards, Luminaires & Appliances
14.1 Flexible Cords, Flexible Cables & Fixture Wires (Articles 400 & 402) 14.2 Switches, Receptacles & Wiring Devices (Articles 404 & 406) 14.3 Panelboards, Switchboards & Switchgear (NEC Article 408) 14.4 Luminaires, Lampholders, Lighting Track & Low-Voltage Lighting (Articles 410 & 411) 14.5 Appliances, Fixed Electric Space Heating & Deicing Equipment (Articles 422, 424 & 426)
15 Motors, Controllers & Air Conditioning
15.1 Motor Full-Load Current Determination & Conductor Sizing (NEC 430.6 & 430.22) 15.2 Motor Branch-Circuit Short-Circuit & Ground-Fault Protection (NEC Table 430.52) 15.3 Motor Overload Protection & Feeder Calculations for Multiple Motors (NEC 430.32 & 430.24) 15.4 Motor Controllers, Disconnecting Means, Drives & Motor Control Centers (Article 430 Parts VII–XI) 15.5 Air Conditioning & Refrigeration Equipment (NEC Article 440)
16 Transformers, Generators & Equipment Over 1000 Volts
16.1 Transformer Overcurrent Protection & Sizing (NEC Article 450) 16.2 Generators & Transfer Switches (NEC Article 445) 16.3 Capacitors, Transformers Over 1000 V & Medium-Voltage Equipment (Articles 460, 450 & 495)
17 Hazardous (Classified) Locations
17.1 Hazardous (Classified) Locations: Classes, Divisions & Zones (NEC Articles 500-506) 17.2 Class I Locations: Wiring Methods & Conduit Seal-Offs (NEC Article 501) 17.3 Class II & Class III Locations and the Zone System (Articles 502, 503, 505 & 506) 17.4 Commercial Garages & Motor Fuel Dispensing Facilities (NEC Articles 511 & 514) 17.5 Spray Areas, Aircraft Hangars, Hazardous-Location Bonding & Intrinsic Safety (Articles 500, 504, 513 & 516)
18 Health Care, Assembly, Agricultural & Mobile Occupancies
18.1 Health Care Facilities: Patient Care Spaces & Redundant Grounding (NEC Article 517) 18.2 Places of Assembly, Carnivals & Fairs, and Temporary Installations (Articles 518, 525 & 590) 18.3 Agricultural Buildings, Equipotential Planes & Farm Distribution Points (Article 547) 18.4 Mobile & Manufactured Homes, RV Parks, and Marinas & Docks (Articles 550, 551 & 555)
19 Signs, Elevators, Pools, Solar & Other Specific Equipment
19.1 Signs & Outline Lighting, Office Partitions, IT Rooms & Irrigation Machines (Articles 600, 605, 645 & 675) 19.2 Elevators, Escalators & Platform Lifts (Article 620) 19.3 Swimming Pools, Spas & Water Features: Equipotential Bonding & GFCI (NEC Article 680) 19.4 Spas, Hot Tubs, Hydromassage Bathtubs, Fountains & Natural Bodies of Water (Article 680 Parts IV–VII & Article 682) 19.5 Solar Photovoltaic Systems (Article 690) 19.6 Small Wind Systems, Fire Pumps & Electric Vehicle Charging (Articles 694, 695 & 625)
20 Emergency, Standby & Interconnected Power Sources
20.1 Emergency Systems vs. Legally Required vs. Optional Standby (NEC Articles 700, 701, 702) 20.2 Interconnected Power Sources, Energy Storage & Power Control Systems (Articles 705, 706, 480 & 130)
21 Limited-Energy, Fire Alarm & Communications Systems
21.1 Remote-Control, Signaling & Power-Limited Circuits: Class 1, 2 & 3 (2026 Articles 206, 720–725) 21.2 Class 4 Fault-Managed Power, Tray Cables, Fire-Resistive Cable Systems & Limited-Energy Grounding (Articles 726, 727, 742, 750 & 772) 21.3 Fire Alarm Systems: NPLFA vs. PLFA Wiring & Overcurrent Protection (NEC Article 760) 21.4 Optical Fiber Cables & Communications Systems Entering Buildings (2026 Articles 720–723, 800, 810, 820)
1.5 Direct Supervision, Ratios & Licensing Exemptions
Key Takeaways Explain This Topic AI
Minn. Stat. 326B.33, subd. 12 limits a licensed individual to supervising two unlicensed individuals, or three for technology circuits or systems work.
Direct supervision under Minn. Stat. 326B.31, subd. 16 requires the licensed individual to be physically present and immediately available during the entire working day; electronic supervision does not qualify.
The licensed supervisor and the unlicensed worker must be employed by the same employer, and the supervisor is responsible for the work's compliance.
An owner may wire a residential dwelling they own and occupy, or will occupy, without a license only if it has a separate electrical utility service not shared with another dwelling.
Unlicensed individuals may not supervise electrical work or assign electrical work to other unlicensed individuals.
Last updated: October 2026
Why supervision is tested
Supervision rules decide whether a job site is legal and whether an apprentice's hours count. They come from two places in the exam booklet: the definition of direct supervision in Minn. Stat. 326B.31, subdivision 16 , and the duties of licensed and unlicensed individuals in 326B.33, subdivision 12 . Expect questions on the ratio, physical presence, same-employer rules, and who is responsible for the work.
What "direct supervision" means
Subdivision 16 lists six conditions. All must be met:
The unlicensed individual is supervised by an individual licensed to perform the electrical work being supervised.
During the entire working day of the unlicensed individual, the licensed individual is physically present at the location where the work is being done and immediately available .
The licensed individual is physically present and immediately available at all times for assistance and direction.
Electronic supervision does not meet the requirement of physically present and immediately available.
The licensed individual reviews the work performed by the unlicensed individual before it is operated .
The licensed individual is able to and does determine that all the work complies with section 326B.35.
The subdivision ends with a liability rule: the licensed individual is responsible for the compliance of all electrical work performed by the unlicensed individual. Subdivision 12(d) repeats that responsibility.
Tip
Phone calls, video calls, and photos do not satisfy direct supervision, no matter how experienced the apprentice is. "Physically present and immediately available" is the test.
Ratios and other limits in 326B.33, subdivision 12
- Rule Requirement
- Registration An unlicensed individual must first register with DLI before doing work that requires a license
Supervision Unlicensed work must be under the direct supervision of an individual licensed to perform that work
- Same employer The licensed and unlicensed individuals must be employed by the same employer
- Ratio, general A licensed individual may supervise no more than two unlicensed individuals
- Ratio, technology For technology circuits or systems work, the limit is three
No supervising by unlicensed Unlicensed individuals may not supervise electrical work or make assignments to other unlicensed individuals
Planning and layout Only a master electrician or power limited technician may plan or lay out electrical work, except for exempt technology circuits
Records Contractors must keep records identifying all unlicensed individuals doing electrical work and let DLI copy them
The two-to-one ratio applies to the type of work, not to the size of the job or the danger of the task. The Act has no separate one-to-one ratio for services or energized work. A licensed journeyworker may supervise up to two registered unlicensed individuals on any electrical work the journeyworker is licensed to perform.
DLI's summary for workers adds practical points. You may do electrical work as a registered unlicensed electrician only within the scope of work your employer is authorized to perform, only under direct supervision at all times by a licensed journeyworker or master, and only when you and your supervisor work for the same licensed contractor or registered employer. A licensed employee of one company cannot supervise the unlicensed employees of another company.
Who may do electrical work at all
DLI states that you may do electrical work in Minnesota only if you are at least 17 years old , licensed by DLI or registered as an unlicensed electrician, and a W-2 employee of a licensed electrical contractor or registered employer, or the owner of a licensed contractor. Minnesota Rules part 3800.3500, subpart 3 defines employee as an individual whose pay for electrical work is reported on a W-2, plus the instructor and students of an electrical wiring course working on school projects under a licensed contractor employee's direct supervision. A 1099 subcontractor is not an employee for this purpose.
Exemptions from licensing (326B.33, subdivision 21)
The Act lists situations where no personal license is required:
Exemption Conditions
Employer maintenance electricians Maintain and repair the employer's own equipment on its property, under supervision of a licensed master, maintenance electrician, power limited technician, or electrical engineer, with a current certificate of responsible person on file
Technology circuits under a contractor Employees of a licensed electrical or technology system contractor supervised by a master or PLT may install most Class 2 and Class 3 circuits, except listed items such as remote-control circuits controlling non-Class 2/3 circuits outside dwellings, Class 4 circuits, and work in hazardous locations
Plug-connected appliance controls Class 2 and 3 remote-control wiring for plug or cord-and-plug connected appliances, other than security or fire alarm systems, in a residential dwelling
HVAC contractors HVAC and refrigeration contractors and their employees doing HVAC work described in section 326B.38
Utilities Employees of electric, communications, railway, cable, or telephone utilities working on utility-owned facilities used for the utility function, not on the load side of the service point
Owners An individual who personally performs electrical work on a residential dwelling they own and actually occupy, or will occupy on completion, if the dwelling has a separate electrical utility service not shared with any other dwelling
Elevator contractors Companies licensed under 326B.164 doing elevator work
The owner exemption is narrow. It covers only the owner personally, only a dwelling the owner occupies, and only a dwelling on its own utility service. It does not let an owner hire an unlicensed helper, wire a rental unit, or work on a duplex with a shared service. Even exempt owners must still file a request for inspection, because inspection under 326B.36 is a separate requirement.
Worked scenarios
Scenario 1 — Three apprentices. A journeyworker is assigned three registered unlicensed workers to rough in a strip mall. The ratio for general electrical work is two. One worker must be reassigned to another licensed electrician of the same contractor before work continues.
Scenario 2 — Supply-house run. A journeyworker leaves a registered apprentice terminating devices while picking up material across town for an hour. During that hour the journeyworker is not physically present and immediately available, so the apprentice's work is not under direct supervision. The apprentice must stop until a licensed electrician of the same employer is on site.
Scenario 3 — Borrowed apprentice. A licensed journeyworker from Contractor A offers to supervise an idle registered apprentice employed by Contractor B. This is not allowed because the licensed and unlicensed individuals must be employed by the same employer.
Scenario 4 — Low-voltage crew. A licensed power limited technician supervises three registered unlicensed workers pulling Class 2 data cabling. The technology-circuits ratio of three allows this crew size.