3.1 Navigating the 2026 NEC: Article 90, Code Structure & Article 100 Definitions

Minnesota Journeyman Electrician Study Guide Exam

Track your progress as you read

Finished sections get a check mark.

1 Minnesota Exam, Licensing & Electrical Law

1.1 Exam Format, Provided References, Scoring & Scheduling 1.2 The Minnesota Electrical Act, Board of Electricity & Code Adoption 1.3 Personal Licenses, Scope of Work & Electrical Contractors 1.4 Experience Credit, Registration, Reciprocity, Renewal & Continuing Education 1.5 Direct Supervision, Ratios & Licensing Exemptions 1.6 Electrical Permits, Inspections, Condemnation & Enforcement

2 Electrical Theory, Math & Power Calculations

2.1 Exam Math, Ohm's Law, Watt's Law & Series/Parallel Circuits 2.2 AC Fundamentals: Reactance, Impedance & Power Factor 2.3 Three-Phase Systems: Wye vs. Delta Calculations 2.4 Voltage Drop Calculations & Chapter 9 Conductor Properties 2.5 Transformer Ratios, Connections, Taps & Available Fault Current 2.6 Motor Connections, Control Circuits & Troubleshooting

3 NEC Structure & General Requirements

3.1 Navigating the 2026 NEC: Article 90, Code Structure & Article 100 Definitions 3.2 NEC Article 110: Working Clearances, Dedicated Space & Termination Ratings 3.3 Over-1000-Volt Installations, Guarding & Manholes (Article 110, Parts III–V)

4 Conductors, Identification & Ampacity

4.1 Conductor Insulation Types, Copper vs. Aluminum & Table 310.16 Allowable Ampacities 4.2 Ampacity Derating: Ambient Temperature Correction & Raceway Bundling Adjustments 4.3 Conductor Identification, Splices & Parallel Conductors

5 Branch Circuits, GFCI/AFCI & Required Outlets

5.1 Branch Circuit Sizing, Overcurrent Ratings & Multiwire Branch Circuits 5.2 GFCI & AFCI Protection Requirements (NEC 210.8 & 210.12) 5.3 Dwelling Receptacle Outlets, Required Circuits & Lighting Outlets (NEC 210.11, 210.52, 210.63 & 210.70)

6 Load Calculations (2026 NEC Article 120)

6.1 Article 120 Basics: Dwelling Lighting, Small-Appliance & Laundry Loads 6.2 Dwelling Standard Method: Appliances, Dryers, Ranges, Heating, EVSE & Neutral 6.3 Optional Methods: Single Dwelling, Existing Dwelling & Multifamily (2026 NEC 120.82–120.85) 6.4 Commercial Lighting, Receptacle, Sign & Show-Window Loads (Table 120.42(A) & 120.44) 6.5 Commercial Kitchens, Schools & Restaurants (2026 NEC 120.56, 120.86 & 120.88) 6.6 Farm Load Calculations (2026 NEC 120.102 & 120.103) 6.7 Feeder & Service Neutral Sizing (2026 NEC 120.61)

7 Feeders, Outside Wiring & Services

7.1 Feeder Design & Sizing Requirements (NEC Article 215) 7.2 Outside Feeders & Separate Buildings (Article 225 & 250.32) 7.3 Service Clearances, Overhead Drops & Underground Service Laterals 7.4 Service Equipment, Disconnecting Means, Surge Protection & GFPE (2026 NEC Article 230)

8 Overcurrent Protection

8.1 Overcurrent Protective Devices: Fuses, Breakers & Standard Ampere Ratings 8.2 Conductor Overcurrent Protection & Feeder Tap Rules (NEC 240.4 & 240.21) 8.3 OCPD Location, Breaker Voltage Ratings, Handle Ties & Arc Energy Reduction

9 System Grounding & Grounding Electrodes

9.1 Grounding vs. Bonding Principles & System Grounding (NEC Article 250 Parts I-II) 9.2 Grounding Electrode System: Permitted Electrodes & Installation (NEC 250.50 & 250.52) 9.3 Grounding Electrode Conductor (GEC) Sizing & Protection (NEC Table 250.66) 9.4 Main Bonding Jumper, System Bonding Jumper & Separately Derived Systems

10 Bonding & Equipment Grounding

10.1 Equipment Grounding Conductor (EGC) Types, Identification & Sizing (NEC Table 250.122) 10.2 Proportional Upsizing of EGC for Voltage Drop (NEC 250.122(B)) 10.3 Bonding of Interior Metal Piping, Structural Steel & Other Systems (NEC 250.104) 10.4 Bonding Methods, Equipment Requiring Grounding & Receptacle Grounding

11 General Wiring Methods & Underground Installations

11.1 General Wiring Methods & Mechanical Protection (NEC Article 300) 11.2 Underground Wiring Cover Requirements (NEC Table 300.7) 11.3 Securing & Supporting, Plenums, Firestopping & Raceway Installation (Article 300)

12 Raceways, Cables & Conduit Fill

12.1 Metal (RMC, IMC, EMT) & Nonmetallic (PVC, RTRC, LFNC) Raceways 12.2 Flexible Conduits, ENT, Wireways, Auxiliary Gutters & Surface Raceways 12.3 Busways & Cable Tray Systems (Articles 368 & 392) 12.4 Cable Assemblies (NM, UF, MC) & Minnesota Cold-Weather Installation Rules 12.5 Conduit & Tubing Fill Calculations (Chapter 9 & Annex C)

13 Boxes, Conduit Bodies & Cabinets

13.1 Box Installation, Support, Accessibility & Luminaire and Fan Boxes (Article 314) 13.2 Outlet, Switch & Junction Box Fill Calculations (NEC 314.16) 13.3 Pull and Junction Box Sizing for Conductors 4 AWG & Larger (NEC 314.28) 13.4 Cabinets, Cutout Boxes & Wire Bending Space (NEC Article 312)

14 Cords, Wiring Devices, Panelboards, Luminaires & Appliances

14.1 Flexible Cords, Flexible Cables & Fixture Wires (Articles 400 & 402) 14.2 Switches, Receptacles & Wiring Devices (Articles 404 & 406) 14.3 Panelboards, Switchboards & Switchgear (NEC Article 408) 14.4 Luminaires, Lampholders, Lighting Track & Low-Voltage Lighting (Articles 410 & 411) 14.5 Appliances, Fixed Electric Space Heating & Deicing Equipment (Articles 422, 424 & 426)

15 Motors, Controllers & Air Conditioning

15.1 Motor Full-Load Current Determination & Conductor Sizing (NEC 430.6 & 430.22) 15.2 Motor Branch-Circuit Short-Circuit & Ground-Fault Protection (NEC Table 430.52) 15.3 Motor Overload Protection & Feeder Calculations for Multiple Motors (NEC 430.32 & 430.24) 15.4 Motor Controllers, Disconnecting Means, Drives & Motor Control Centers (Article 430 Parts VII–XI) 15.5 Air Conditioning & Refrigeration Equipment (NEC Article 440)

16 Transformers, Generators & Equipment Over 1000 Volts

16.1 Transformer Overcurrent Protection & Sizing (NEC Article 450) 16.2 Generators & Transfer Switches (NEC Article 445) 16.3 Capacitors, Transformers Over 1000 V & Medium-Voltage Equipment (Articles 460, 450 & 495)

17 Hazardous (Classified) Locations

17.1 Hazardous (Classified) Locations: Classes, Divisions & Zones (NEC Articles 500-506) 17.2 Class I Locations: Wiring Methods & Conduit Seal-Offs (NEC Article 501) 17.3 Class II & Class III Locations and the Zone System (Articles 502, 503, 505 & 506) 17.4 Commercial Garages & Motor Fuel Dispensing Facilities (NEC Articles 511 & 514) 17.5 Spray Areas, Aircraft Hangars, Hazardous-Location Bonding & Intrinsic Safety (Articles 500, 504, 513 & 516)

18 Health Care, Assembly, Agricultural & Mobile Occupancies

18.1 Health Care Facilities: Patient Care Spaces & Redundant Grounding (NEC Article 517) 18.2 Places of Assembly, Carnivals & Fairs, and Temporary Installations (Articles 518, 525 & 590) 18.3 Agricultural Buildings, Equipotential Planes & Farm Distribution Points (Article 547) 18.4 Mobile & Manufactured Homes, RV Parks, and Marinas & Docks (Articles 550, 551 & 555)

19 Signs, Elevators, Pools, Solar & Other Specific Equipment

19.1 Signs & Outline Lighting, Office Partitions, IT Rooms & Irrigation Machines (Articles 600, 605, 645 & 675) 19.2 Elevators, Escalators & Platform Lifts (Article 620) 19.3 Swimming Pools, Spas & Water Features: Equipotential Bonding & GFCI (NEC Article 680) 19.4 Spas, Hot Tubs, Hydromassage Bathtubs, Fountains & Natural Bodies of Water (Article 680 Parts IV–VII & Article 682) 19.5 Solar Photovoltaic Systems (Article 690) 19.6 Small Wind Systems, Fire Pumps & Electric Vehicle Charging (Articles 694, 695 & 625)

20 Emergency, Standby & Interconnected Power Sources

20.1 Emergency Systems vs. Legally Required vs. Optional Standby (NEC Articles 700, 701, 702) 20.2 Interconnected Power Sources, Energy Storage & Power Control Systems (Articles 705, 706, 480 & 130)

21 Limited-Energy, Fire Alarm & Communications Systems

21.1 Remote-Control, Signaling & Power-Limited Circuits: Class 1, 2 & 3 (2026 Articles 206, 720–725) 21.2 Class 4 Fault-Managed Power, Tray Cables, Fire-Resistive Cable Systems & Limited-Energy Grounding (Articles 726, 727, 742, 750 & 772) 21.3 Fire Alarm Systems: NPLFA vs. PLFA Wiring & Overcurrent Protection (NEC Article 760) 21.4 Optical Fiber Cables & Communications Systems Entering Buildings (2026 Articles 720–723, 800, 810, 820)

3.1 Navigating the 2026 NEC: Article 90, Code Structure & Article 100 Definitions

Key Takeaways Explain This Topic AI

Minnesota Rules part 1315.0200 incorporates the 2026 NEC (NFPA 70-2026) by reference, and DLI states that it became effective August 17, 2026, and is the edition used for exam questions.

NEC 90.5 makes rules using "shall" or "shall not" mandatory, rules using "shall be permitted" or "shall not be required" permissive, and Informational Notes explanatory only.

In the 2026 NEC, branch-circuit, feeder, and service load calculations are in Article 120, not Article 220.

Article 100 defines a continuous load as one where the maximum current is expected to continue for 3 hours or more.

Minnesota Rules part 3801.3620 requires electrical equipment to be listed and labeled by a testing laboratory unless an approved alternative evaluation is accepted.

Last updated: October 2026

3.1 Navigating the 2026 NEC: Article 90, Code Structure & Article 100 Definitions

Quick Answer: The Minnesota exam is based on the 2026 NEC , and DLI provides a soft-cover copy at the test site. Learn Article 90's rules for reading the Code, know where the 2026 edition moved familiar material (load calculations are now Article 120 ), and master the Article 100 definitions that decide many questions.

How Minnesota adopts the NEC

Minnesota Rules part 1315.0200 requires all new electrical wiring, apparatus, and equipment to comply with the 2026 edition of the National Electrical Code (NFPA 70-2026) , Minn. Stat. 326B.35, and the Minnesota State Building Code. The NEC is incorporated by reference and made part of the State Building Code. DLI's exam guide states that the 2026 NEC became effective August 17, 2026 , and is the edition used for exam questions.

DLI's exam guide adds two practical points:

The Code book provided at the exam is a soft-cover copy without tabs or other aids .

The NEC now shows SI (metric) units first with inch-pound units in parentheses. Compliance with either value is compliance with the Code, but all exam questions and answers use inch-pound units .

Article 90: reading the Code correctly

Section What it says Exam use

90.1 Purpose The practical safeguarding of persons and property from hazards arising from the use of electricity The NEC is a minimum safety standard, not a design manual

90.2 Scope Covers installation and removal of conductors, equipment, raceways, signaling and communications systems, and optical fiber for public and private premises, yards, lots, carnivals, and similar sites Utility generation, transmission, and distribution under exclusive utility control are not covered

90.4 Enforcement The authority having jurisdiction (AHJ) interprets the Code, approves equipment and materials, and may permit alternative methods where equivalent safety is achieved In Minnesota the AHJ is the state electrical inspector or a local inspection program

90.5 Language "Shall" and "shall not" are mandatory; "shall be permitted" and "shall not be required" are permissive; Informational Notes are explanatory and not enforceable Do not answer a question with an Informational Note as if it were a requirement

90.9 Units SI units are primary, inch-pound units follow in parentheses DLI questions use inch-pound units

Utility-owned office buildings, warehouses, garages, and similar buildings that are not an integral part of a generating plant, substation, or control center are covered by the NEC. Utility facilities used for the utility function are not. Minnesota mirrors this in Minn. Stat. 326B.36, which exempts utility facilities used for the utility function from inspection unless they are on the load side of the service point.

How the 2026 NEC is organized

The 2026 edition made large structural changes. Knowing where material now lives saves time on an open-book exam.

  • Change in the 2026 NEC What to know
  • Article 120 (new location) Branch-circuit, feeder, and service load calculations moved here from Article 220
  • Article 130 (new) Energy management systems, including power control systems, moved from Article 750
  • Article 206 (new) General requirements for non-power-limited remote-control and signaling circuits

Article 406 (expanded) Now covers "wiring devices": receptacles, cord connectors, attachment plugs, snap switches, dimmers, and electronic control switches; small switch-type devices moved here from Article 404

Articles 245, 265, 266, 267, 268, 270, 305, 315, 495 Over-1000 V ac (1500 V dc) overcurrent protection, branch circuits, feeders, outside circuits, services, grounding, wiring methods, MV cable, and equipment

Articles 720 to 723, 742, 750 Consolidated general rules for limited-energy systems: wiring methods, power sources, cables, raceways and cable trays, overvoltage protection, and grounding and bonding

Article 772 Fire-resistive cable systems (formerly Article 728)

Deleted articles Article 235 (its material moved to Articles 265 to 268), Article 770 (optical fiber), and Article 805 (communications circuits)

The Code also replaced "overcurrent protective device" with the acronym OCPD in many rules and added "ac" to rules that apply only to alternating-current systems.

Article 100 definitions that decide answers

All definitions are in Article 100, in one alphabetical list.

Access terms

Term Meaning Example

Readily accessible Capable of being reached quickly for operation, renewal, or inspection without having to use tools (other than keys), climb over or under, remove obstacles, or use portable ladders Service disconnects and most OCPDs must be readily accessible

Accessible (equipment) Admitting close approach; not guarded by locked doors, elevation, or other effective means Equipment behind an unlocked door

Accessible (wiring methods) Capable of being removed or exposed without damaging the building structure or finish Junction boxes above lift-out ceiling panels

Concealed Rendered inaccessible by the structure or finish of the building Cable inside a finished wall; wiring in concealed raceways is considered concealed even if it becomes accessible by withdrawing it

A box above a lay-in ceiling is accessible but not readily accessible , because reaching it requires a ladder.

Load and circuit terms

Continuous load: maximum current expected to continue for 3 hours or more . Conductors and OCPDs for continuous loads are generally sized at 125% of the continuous load plus 100% of the noncontinuous load.

Branch circuit: conductors between the final OCPD protecting the circuit and the outlets.

Feeder: conductors between the service equipment, a separately derived system source, or another power supply source and the final branch-circuit OCPD.

Service conductors: conductors from the service point to the service disconnecting means.

Outlet: a point on the wiring system at which current is taken to supply utilization equipment. A receptacle outlet, lighting outlet, and a hard-wired water heater connection are all outlets.

Equipment approval terms

  • Term Article 100 meaning
  • Approved Acceptable to the authority having jurisdiction

Listed Included in a list published by an organization acceptable to the AHJ that evaluates products, maintains periodic inspection of production, and states that the item meets appropriate standards or has been tested and found suitable for a specified purpose

Labeled Bearing a label, symbol, or other identifying mark of an organization acceptable to the AHJ that evaluates products and maintains periodic inspection, indicating compliance with appropriate standards

Identified Recognizable as suitable for the specific purpose, function, use, environment, or application where described in a particular Code requirement

Minnesota adds its own rule. Minnesota Rules part 3801.3620 requires all electrical equipment used in an installation to be listed and labeled by a testing laboratory , except where the department accepts an alternative, such as an evaluation by a testing laboratory or by an independent registered electrical engineer with a written report filed with DLI. Equipment that the NEC specifically requires to be listed cannot use the alternatives.

Grounding and bonding terms

  • Term Article 100 meaning
  • Grounded conductor A system or circuit conductor that is intentionally grounded (usually the neutral)

Equipment grounding conductor (EGC) The conductive path that provides a ground-fault current path and connects non-current-carrying metal parts of equipment together and to the system grounded conductor, the grounding electrode conductor, or both

Grounding electrode conductor (GEC) The conductor that connects the system grounded conductor or the equipment to a grounding electrode or to a point on the grounding electrode system

Main bonding jumper The connection between the grounded circuit conductor and the EGC, or the supply-side bonding jumper, or both, at the service

System bonding jumper The same connection at a separately derived system

Effective ground-fault current path An intentionally constructed, low-impedance path designed to carry ground-fault current to the source and allow OCPDs or ground-fault detectors to operate

Worked example: continuous loads

A store feeder serves 40 A of sales-floor lighting that operates 14 hours a day and 12 A of stockroom lighting used intermittently. The sales-floor lighting is a continuous load, so the minimum feeder ampacity is 40 × 1.25 + 12 = 62 40 \times 1.25 + 12 = 62 40 × 1.25 + 12 = 62 A. Under 215.3, the feeder OCPD is sized the same way unless the assembly is listed for 100% continuous operation.