Study guide
6.6 Farm Load Calculations (2026 NEC 120.102 & 120.103)
Minnesota Journeyman Electrician Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Minnesota Exam, Licensing & Electrical Law
1.1 Exam Format, Provided References, Scoring & Scheduling 1.2 The Minnesota Electrical Act, Board of Electricity & Code Adoption 1.3 Personal Licenses, Scope of Work & Electrical Contractors 1.4 Experience Credit, Registration, Reciprocity, Renewal & Continuing Education 1.5 Direct Supervision, Ratios & Licensing Exemptions 1.6 Electrical Permits, Inspections, Condemnation & Enforcement
2 Electrical Theory, Math & Power Calculations
2.1 Exam Math, Ohm's Law, Watt's Law & Series/Parallel Circuits 2.2 AC Fundamentals: Reactance, Impedance & Power Factor 2.3 Three-Phase Systems: Wye vs. Delta Calculations 2.4 Voltage Drop Calculations & Chapter 9 Conductor Properties 2.5 Transformer Ratios, Connections, Taps & Available Fault Current 2.6 Motor Connections, Control Circuits & Troubleshooting
3 NEC Structure & General Requirements
3.1 Navigating the 2026 NEC: Article 90, Code Structure & Article 100 Definitions 3.2 NEC Article 110: Working Clearances, Dedicated Space & Termination Ratings 3.3 Over-1000-Volt Installations, Guarding & Manholes (Article 110, Parts III–V)
4 Conductors, Identification & Ampacity
4.1 Conductor Insulation Types, Copper vs. Aluminum & Table 310.16 Allowable Ampacities 4.2 Ampacity Derating: Ambient Temperature Correction & Raceway Bundling Adjustments 4.3 Conductor Identification, Splices & Parallel Conductors
5 Branch Circuits, GFCI/AFCI & Required Outlets
5.1 Branch Circuit Sizing, Overcurrent Ratings & Multiwire Branch Circuits 5.2 GFCI & AFCI Protection Requirements (NEC 210.8 & 210.12) 5.3 Dwelling Receptacle Outlets, Required Circuits & Lighting Outlets (NEC 210.11, 210.52, 210.63 & 210.70)
6 Load Calculations (2026 NEC Article 120)
6.1 Article 120 Basics: Dwelling Lighting, Small-Appliance & Laundry Loads 6.2 Dwelling Standard Method: Appliances, Dryers, Ranges, Heating, EVSE & Neutral 6.3 Optional Methods: Single Dwelling, Existing Dwelling & Multifamily (2026 NEC 120.82–120.85) 6.4 Commercial Lighting, Receptacle, Sign & Show-Window Loads (Table 120.42(A) & 120.44) 6.5 Commercial Kitchens, Schools & Restaurants (2026 NEC 120.56, 120.86 & 120.88) 6.6 Farm Load Calculations (2026 NEC 120.102 & 120.103) 6.7 Feeder & Service Neutral Sizing (2026 NEC 120.61)
7 Feeders, Outside Wiring & Services
7.1 Feeder Design & Sizing Requirements (NEC Article 215) 7.2 Outside Feeders & Separate Buildings (Article 225 & 250.32) 7.3 Service Clearances, Overhead Drops & Underground Service Laterals 7.4 Service Equipment, Disconnecting Means, Surge Protection & GFPE (2026 NEC Article 230)
8 Overcurrent Protection
8.1 Overcurrent Protective Devices: Fuses, Breakers & Standard Ampere Ratings 8.2 Conductor Overcurrent Protection & Feeder Tap Rules (NEC 240.4 & 240.21) 8.3 OCPD Location, Breaker Voltage Ratings, Handle Ties & Arc Energy Reduction
9 System Grounding & Grounding Electrodes
9.1 Grounding vs. Bonding Principles & System Grounding (NEC Article 250 Parts I-II) 9.2 Grounding Electrode System: Permitted Electrodes & Installation (NEC 250.50 & 250.52) 9.3 Grounding Electrode Conductor (GEC) Sizing & Protection (NEC Table 250.66) 9.4 Main Bonding Jumper, System Bonding Jumper & Separately Derived Systems
10 Bonding & Equipment Grounding
10.1 Equipment Grounding Conductor (EGC) Types, Identification & Sizing (NEC Table 250.122) 10.2 Proportional Upsizing of EGC for Voltage Drop (NEC 250.122(B)) 10.3 Bonding of Interior Metal Piping, Structural Steel & Other Systems (NEC 250.104) 10.4 Bonding Methods, Equipment Requiring Grounding & Receptacle Grounding
11 General Wiring Methods & Underground Installations
11.1 General Wiring Methods & Mechanical Protection (NEC Article 300) 11.2 Underground Wiring Cover Requirements (NEC Table 300.7) 11.3 Securing & Supporting, Plenums, Firestopping & Raceway Installation (Article 300)
12 Raceways, Cables & Conduit Fill
12.1 Metal (RMC, IMC, EMT) & Nonmetallic (PVC, RTRC, LFNC) Raceways 12.2 Flexible Conduits, ENT, Wireways, Auxiliary Gutters & Surface Raceways 12.3 Busways & Cable Tray Systems (Articles 368 & 392) 12.4 Cable Assemblies (NM, UF, MC) & Minnesota Cold-Weather Installation Rules 12.5 Conduit & Tubing Fill Calculations (Chapter 9 & Annex C)
13 Boxes, Conduit Bodies & Cabinets
13.1 Box Installation, Support, Accessibility & Luminaire and Fan Boxes (Article 314) 13.2 Outlet, Switch & Junction Box Fill Calculations (NEC 314.16) 13.3 Pull and Junction Box Sizing for Conductors 4 AWG & Larger (NEC 314.28) 13.4 Cabinets, Cutout Boxes & Wire Bending Space (NEC Article 312)
14 Cords, Wiring Devices, Panelboards, Luminaires & Appliances
14.1 Flexible Cords, Flexible Cables & Fixture Wires (Articles 400 & 402) 14.2 Switches, Receptacles & Wiring Devices (Articles 404 & 406) 14.3 Panelboards, Switchboards & Switchgear (NEC Article 408) 14.4 Luminaires, Lampholders, Lighting Track & Low-Voltage Lighting (Articles 410 & 411) 14.5 Appliances, Fixed Electric Space Heating & Deicing Equipment (Articles 422, 424 & 426)
15 Motors, Controllers & Air Conditioning
15.1 Motor Full-Load Current Determination & Conductor Sizing (NEC 430.6 & 430.22) 15.2 Motor Branch-Circuit Short-Circuit & Ground-Fault Protection (NEC Table 430.52) 15.3 Motor Overload Protection & Feeder Calculations for Multiple Motors (NEC 430.32 & 430.24) 15.4 Motor Controllers, Disconnecting Means, Drives & Motor Control Centers (Article 430 Parts VII–XI) 15.5 Air Conditioning & Refrigeration Equipment (NEC Article 440)
16 Transformers, Generators & Equipment Over 1000 Volts
16.1 Transformer Overcurrent Protection & Sizing (NEC Article 450) 16.2 Generators & Transfer Switches (NEC Article 445) 16.3 Capacitors, Transformers Over 1000 V & Medium-Voltage Equipment (Articles 460, 450 & 495)
17 Hazardous (Classified) Locations
17.1 Hazardous (Classified) Locations: Classes, Divisions & Zones (NEC Articles 500-506) 17.2 Class I Locations: Wiring Methods & Conduit Seal-Offs (NEC Article 501) 17.3 Class II & Class III Locations and the Zone System (Articles 502, 503, 505 & 506) 17.4 Commercial Garages & Motor Fuel Dispensing Facilities (NEC Articles 511 & 514) 17.5 Spray Areas, Aircraft Hangars, Hazardous-Location Bonding & Intrinsic Safety (Articles 500, 504, 513 & 516)
18 Health Care, Assembly, Agricultural & Mobile Occupancies
18.1 Health Care Facilities: Patient Care Spaces & Redundant Grounding (NEC Article 517) 18.2 Places of Assembly, Carnivals & Fairs, and Temporary Installations (Articles 518, 525 & 590) 18.3 Agricultural Buildings, Equipotential Planes & Farm Distribution Points (Article 547) 18.4 Mobile & Manufactured Homes, RV Parks, and Marinas & Docks (Articles 550, 551 & 555)
19 Signs, Elevators, Pools, Solar & Other Specific Equipment
19.1 Signs & Outline Lighting, Office Partitions, IT Rooms & Irrigation Machines (Articles 600, 605, 645 & 675) 19.2 Elevators, Escalators & Platform Lifts (Article 620) 19.3 Swimming Pools, Spas & Water Features: Equipotential Bonding & GFCI (NEC Article 680) 19.4 Spas, Hot Tubs, Hydromassage Bathtubs, Fountains & Natural Bodies of Water (Article 680 Parts IV–VII & Article 682) 19.5 Solar Photovoltaic Systems (Article 690) 19.6 Small Wind Systems, Fire Pumps & Electric Vehicle Charging (Articles 694, 695 & 625)
20 Emergency, Standby & Interconnected Power Sources
20.1 Emergency Systems vs. Legally Required vs. Optional Standby (NEC Articles 700, 701, 702) 20.2 Interconnected Power Sources, Energy Storage & Power Control Systems (Articles 705, 706, 480 & 130)
21 Limited-Energy, Fire Alarm & Communications Systems
21.1 Remote-Control, Signaling & Power-Limited Circuits: Class 1, 2 & 3 (2026 Articles 206, 720–725) 21.2 Class 4 Fault-Managed Power, Tray Cables, Fire-Resistive Cable Systems & Limited-Energy Grounding (Articles 726, 727, 742, 750 & 772) 21.3 Fire Alarm Systems: NPLFA vs. PLFA Wiring & Overcurrent Protection (NEC Article 760) 21.4 Optical Fiber Cables & Communications Systems Entering Buildings (2026 Articles 720–723, 800, 810, 820)
6.6 Farm Load Calculations (2026 NEC 120.102 & 120.103)
Key Takeaways Explain This Topic AI
Table 120.102 takes loads expected to operate simultaneously at 100%, but not less than 125% of the largest motor's full-load current and not less than the first 60 A of load.
After the 100% portion, Table 120.102 takes the next 60 A of other loads at 50% and the remainder at 25%.
Table 120.103 combines individual farm building loads on a common service at 100% for the largest, 75% for the second largest, 65% for the third largest, and 50% for all remaining loads.
The farm dwelling load is calculated by the standard or optional dwelling method and added to the Table 120.103 total.
The optional method may not be used for a farm dwelling with electric heat on a common service with an electric grain-drying system.
Last updated: October 2026
Why farm calculations matter in Minnesota
Minnesota has thousands of farms with barns, machine sheds, grain bins, and dryers fed from one utility service. Farm load calculations are in Part V of Article 120 (formerly 220.100 to 220.103). They apply to farm buildings and loads other than the dwelling, and they recognize that farm loads in different buildings rarely peak at the same time.
Step 1: each farm building or load (120.102)
120.102(A) Dwelling unit: the farm dwelling is calculated by the standard method or the optional method in 120.82. If the dwelling has electric heat and the farm has electric grain-drying systems , the optional method may not be used for the dwelling when the dwelling and farm loads share a common service.
120.102(B) Other than dwelling unit: where a feeder or service supplies a farm building or other load with two or more separate branch circuits , the load for feeders, service conductors, and service equipment is calculated with demand factors not less than those in Table 120.102:
Ampere load at 240 V maximum Demand factor
Loads expected to operate simultaneously, but not less than 125% of the full-load current of the largest motor and not less than the first 60 A of load 100%
- Next 60 A of all other loads 50%
- Remainder of other load 25%
The first line uses the largest of the three values: the simultaneous load, 125% of the largest motor, or 60 A.
Step 2: total farm load on a common service (120.103)
Where the farm buildings and loads are supplied by a common service, calculate each building or load under Table 120.102, then combine them:
- Individual loads calculated under Table 120.102 Demand factor
- Largest load 100%
- Second largest load 75%
- Third largest load 65%
- Remaining loads 50%
Add the farm dwelling load, calculated under Step 1, to this total.
Typical farm loads
Farm buildings combine motors, heating, and lighting that run on very different schedules, which is why the demand factors are so generous:
Grain drying: dryer fans and burners, augers, and bin aeration fans run hard during harvest and little the rest of the year. The dryer site is often the largest load on the farm.
Dairy: vacuum pumps, milk coolers, water heaters, and ventilation fans run every day, often for long periods.
Hog and poultry confinement: ventilation fans run continuously, with heaters and lighting on controls.
Shops and machine sheds: welders, air compressors, and heaters run intermittently.
Heated stock waterers and heat tape: small but long-running winter loads in Minnesota.
Table 120.102 is stated in amperes at 240 V maximum , so convert other loads to amperes before applying it. The demand factors only reduce the calculated load ; feeder and service conductors must still be sized under 215.2 and 230.42, with continuous loads at 125%.
Worked example: a dairy barn
A barn has a total connected load of 150 A at 240 V . The largest motor is a 10 hp, 230 V single-phase vacuum pump with a Table 430.248 full-load current of 50 A . Loads expected to run together total 70 A .
125% of the largest motor: 50 × 1.25 = 62.5 50 \times 1.25 = 62.5 50 × 1.25 = 62.5 A. The first line uses the largest of 70 A, 62.5 A, and 60 A, so 70 A at 100% = 70 A .
Next 60 A at 50%: 60 × 0.50 = 30 60 \times 0.50 = 30 60 × 0.50 = 30 A.
Remainder: 150 − 70 − 60 = 20 150 - 70 - 60 = 20 150 − 70 − 60 = 20 A at 25% = 5 5 5 A.
Barn demand: 70 + 30 + 5 = 105 70 + 30 + 5 = 105 70 + 30 + 5 = 105 A.
Worked example: total farm service
The same farm has these building loads, each already calculated under Table 120.102: barn 105 A , grain dryer and bins 90 A , machine shed 60 A , shop 40 A . The house calculates to 120 A by the standard method.
- Load Rank Factor Demand
- Barn Largest 100% 105.0 A
- Grain dryer and bins Second 75% 67.5 A
- Machine shed Third 65% 39.0 A
- Shop Remaining 50% 20.0 A
- Farm buildings subtotal 231.5 A
- Dwelling Added at its own calculation 120.0 A
- Total farm load 351.5 A
A 400 A service, or a 400 A distribution point, is needed.
How farm calculations connect to other rules
Agricultural buildings (Article 547): a farm's distribution point , often a pole-mounted site-isolating device, feeds the buildings as separate structures. The 2026 NEC adds detailed construction rules for equipotential planes in livestock confinement areas.
Outside feeders (Article 225): each building fed from the distribution point needs its own disconnecting means, located at or within sight of the building under 225.31 and 110.29.
Grounding of separate buildings (250.32): each building needs a grounding electrode system and an equipment grounding conductor run with the feeder; the neutral and equipment grounding conductor are not bonded at the building.
Tip
On a farm question, do the building calculations first, rank the results from largest to smallest, and only then apply Table 120.103. Applying the 75% and 65% factors before ranking is the most common error.