Study guide
6.3 Optional Methods: Single Dwelling, Existing Dwelling & Multifamily (2026 NEC 120.82–120.85)
Minnesota Journeyman Electrician Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Minnesota Exam, Licensing & Electrical Law
1.1 Exam Format, Provided References, Scoring & Scheduling 1.2 The Minnesota Electrical Act, Board of Electricity & Code Adoption 1.3 Personal Licenses, Scope of Work & Electrical Contractors 1.4 Experience Credit, Registration, Reciprocity, Renewal & Continuing Education 1.5 Direct Supervision, Ratios & Licensing Exemptions 1.6 Electrical Permits, Inspections, Condemnation & Enforcement
2 Electrical Theory, Math & Power Calculations
2.1 Exam Math, Ohm's Law, Watt's Law & Series/Parallel Circuits 2.2 AC Fundamentals: Reactance, Impedance & Power Factor 2.3 Three-Phase Systems: Wye vs. Delta Calculations 2.4 Voltage Drop Calculations & Chapter 9 Conductor Properties 2.5 Transformer Ratios, Connections, Taps & Available Fault Current 2.6 Motor Connections, Control Circuits & Troubleshooting
3 NEC Structure & General Requirements
3.1 Navigating the 2026 NEC: Article 90, Code Structure & Article 100 Definitions 3.2 NEC Article 110: Working Clearances, Dedicated Space & Termination Ratings 3.3 Over-1000-Volt Installations, Guarding & Manholes (Article 110, Parts III–V)
4 Conductors, Identification & Ampacity
4.1 Conductor Insulation Types, Copper vs. Aluminum & Table 310.16 Allowable Ampacities 4.2 Ampacity Derating: Ambient Temperature Correction & Raceway Bundling Adjustments 4.3 Conductor Identification, Splices & Parallel Conductors
5 Branch Circuits, GFCI/AFCI & Required Outlets
5.1 Branch Circuit Sizing, Overcurrent Ratings & Multiwire Branch Circuits 5.2 GFCI & AFCI Protection Requirements (NEC 210.8 & 210.12) 5.3 Dwelling Receptacle Outlets, Required Circuits & Lighting Outlets (NEC 210.11, 210.52, 210.63 & 210.70)
6 Load Calculations (2026 NEC Article 120)
6.1 Article 120 Basics: Dwelling Lighting, Small-Appliance & Laundry Loads 6.2 Dwelling Standard Method: Appliances, Dryers, Ranges, Heating, EVSE & Neutral 6.3 Optional Methods: Single Dwelling, Existing Dwelling & Multifamily (2026 NEC 120.82–120.85) 6.4 Commercial Lighting, Receptacle, Sign & Show-Window Loads (Table 120.42(A) & 120.44) 6.5 Commercial Kitchens, Schools & Restaurants (2026 NEC 120.56, 120.86 & 120.88) 6.6 Farm Load Calculations (2026 NEC 120.102 & 120.103) 6.7 Feeder & Service Neutral Sizing (2026 NEC 120.61)
7 Feeders, Outside Wiring & Services
7.1 Feeder Design & Sizing Requirements (NEC Article 215) 7.2 Outside Feeders & Separate Buildings (Article 225 & 250.32) 7.3 Service Clearances, Overhead Drops & Underground Service Laterals 7.4 Service Equipment, Disconnecting Means, Surge Protection & GFPE (2026 NEC Article 230)
8 Overcurrent Protection
8.1 Overcurrent Protective Devices: Fuses, Breakers & Standard Ampere Ratings 8.2 Conductor Overcurrent Protection & Feeder Tap Rules (NEC 240.4 & 240.21) 8.3 OCPD Location, Breaker Voltage Ratings, Handle Ties & Arc Energy Reduction
9 System Grounding & Grounding Electrodes
9.1 Grounding vs. Bonding Principles & System Grounding (NEC Article 250 Parts I-II) 9.2 Grounding Electrode System: Permitted Electrodes & Installation (NEC 250.50 & 250.52) 9.3 Grounding Electrode Conductor (GEC) Sizing & Protection (NEC Table 250.66) 9.4 Main Bonding Jumper, System Bonding Jumper & Separately Derived Systems
10 Bonding & Equipment Grounding
10.1 Equipment Grounding Conductor (EGC) Types, Identification & Sizing (NEC Table 250.122) 10.2 Proportional Upsizing of EGC for Voltage Drop (NEC 250.122(B)) 10.3 Bonding of Interior Metal Piping, Structural Steel & Other Systems (NEC 250.104) 10.4 Bonding Methods, Equipment Requiring Grounding & Receptacle Grounding
11 General Wiring Methods & Underground Installations
11.1 General Wiring Methods & Mechanical Protection (NEC Article 300) 11.2 Underground Wiring Cover Requirements (NEC Table 300.7) 11.3 Securing & Supporting, Plenums, Firestopping & Raceway Installation (Article 300)
12 Raceways, Cables & Conduit Fill
12.1 Metal (RMC, IMC, EMT) & Nonmetallic (PVC, RTRC, LFNC) Raceways 12.2 Flexible Conduits, ENT, Wireways, Auxiliary Gutters & Surface Raceways 12.3 Busways & Cable Tray Systems (Articles 368 & 392) 12.4 Cable Assemblies (NM, UF, MC) & Minnesota Cold-Weather Installation Rules 12.5 Conduit & Tubing Fill Calculations (Chapter 9 & Annex C)
13 Boxes, Conduit Bodies & Cabinets
13.1 Box Installation, Support, Accessibility & Luminaire and Fan Boxes (Article 314) 13.2 Outlet, Switch & Junction Box Fill Calculations (NEC 314.16) 13.3 Pull and Junction Box Sizing for Conductors 4 AWG & Larger (NEC 314.28) 13.4 Cabinets, Cutout Boxes & Wire Bending Space (NEC Article 312)
14 Cords, Wiring Devices, Panelboards, Luminaires & Appliances
14.1 Flexible Cords, Flexible Cables & Fixture Wires (Articles 400 & 402) 14.2 Switches, Receptacles & Wiring Devices (Articles 404 & 406) 14.3 Panelboards, Switchboards & Switchgear (NEC Article 408) 14.4 Luminaires, Lampholders, Lighting Track & Low-Voltage Lighting (Articles 410 & 411) 14.5 Appliances, Fixed Electric Space Heating & Deicing Equipment (Articles 422, 424 & 426)
15 Motors, Controllers & Air Conditioning
15.1 Motor Full-Load Current Determination & Conductor Sizing (NEC 430.6 & 430.22) 15.2 Motor Branch-Circuit Short-Circuit & Ground-Fault Protection (NEC Table 430.52) 15.3 Motor Overload Protection & Feeder Calculations for Multiple Motors (NEC 430.32 & 430.24) 15.4 Motor Controllers, Disconnecting Means, Drives & Motor Control Centers (Article 430 Parts VII–XI) 15.5 Air Conditioning & Refrigeration Equipment (NEC Article 440)
16 Transformers, Generators & Equipment Over 1000 Volts
16.1 Transformer Overcurrent Protection & Sizing (NEC Article 450) 16.2 Generators & Transfer Switches (NEC Article 445) 16.3 Capacitors, Transformers Over 1000 V & Medium-Voltage Equipment (Articles 460, 450 & 495)
17 Hazardous (Classified) Locations
17.1 Hazardous (Classified) Locations: Classes, Divisions & Zones (NEC Articles 500-506) 17.2 Class I Locations: Wiring Methods & Conduit Seal-Offs (NEC Article 501) 17.3 Class II & Class III Locations and the Zone System (Articles 502, 503, 505 & 506) 17.4 Commercial Garages & Motor Fuel Dispensing Facilities (NEC Articles 511 & 514) 17.5 Spray Areas, Aircraft Hangars, Hazardous-Location Bonding & Intrinsic Safety (Articles 500, 504, 513 & 516)
18 Health Care, Assembly, Agricultural & Mobile Occupancies
18.1 Health Care Facilities: Patient Care Spaces & Redundant Grounding (NEC Article 517) 18.2 Places of Assembly, Carnivals & Fairs, and Temporary Installations (Articles 518, 525 & 590) 18.3 Agricultural Buildings, Equipotential Planes & Farm Distribution Points (Article 547) 18.4 Mobile & Manufactured Homes, RV Parks, and Marinas & Docks (Articles 550, 551 & 555)
19 Signs, Elevators, Pools, Solar & Other Specific Equipment
19.1 Signs & Outline Lighting, Office Partitions, IT Rooms & Irrigation Machines (Articles 600, 605, 645 & 675) 19.2 Elevators, Escalators & Platform Lifts (Article 620) 19.3 Swimming Pools, Spas & Water Features: Equipotential Bonding & GFCI (NEC Article 680) 19.4 Spas, Hot Tubs, Hydromassage Bathtubs, Fountains & Natural Bodies of Water (Article 680 Parts IV–VII & Article 682) 19.5 Solar Photovoltaic Systems (Article 690) 19.6 Small Wind Systems, Fire Pumps & Electric Vehicle Charging (Articles 694, 695 & 625)
20 Emergency, Standby & Interconnected Power Sources
20.1 Emergency Systems vs. Legally Required vs. Optional Standby (NEC Articles 700, 701, 702) 20.2 Interconnected Power Sources, Energy Storage & Power Control Systems (Articles 705, 706, 480 & 130)
21 Limited-Energy, Fire Alarm & Communications Systems
21.1 Remote-Control, Signaling & Power-Limited Circuits: Class 1, 2 & 3 (2026 Articles 206, 720–725) 21.2 Class 4 Fault-Managed Power, Tray Cables, Fire-Resistive Cable Systems & Limited-Energy Grounding (Articles 726, 727, 742, 750 & 772) 21.3 Fire Alarm Systems: NPLFA vs. PLFA Wiring & Overcurrent Protection (NEC Article 760) 21.4 Optical Fiber Cables & Communications Systems Entering Buildings (2026 Articles 720–723, 800, 810, 820)
6.3 Optional Methods: Single Dwelling, Existing Dwelling & Multifamily (2026 NEC 120.82–120.85)
Key Takeaways Explain This Topic AI
The 2026 NEC 120.82(B) takes the first 8 kVA of general loads at 100% and the remainder at 40%; the 2023 edition used the first 10 kVA.
The optional method applies to a dwelling served by a single 120/240 V or 208Y/120 V, 3-wire set of service or feeder conductors with an ampacity of 100 A or more (120.82(A)).
Under 120.82(C), a heat pump with supplemental heat is taken at 100% of the compressor plus 65% of the supplemental heat, and three or fewer separately controlled space-heating units at 65%.
The 2026 NEC 120.82(D) adds EVSE at 100% of its nameplate rating, with no demand factor.
Table 120.84 applies one demand factor to a multifamily building's total connected load, such as 45% for 3 to 5 units and 43% for 8 to 10 units.
Last updated: October 2026
When to use the optional method
The optional calculations in Article 120 (formerly Part IV of Article 220) let you size a feeder or service from total connected load with large demand factors. They recognize that a dwelling never runs every appliance at once. On the exam, read the question: if it says "using the optional method," apply 120.82 or 120.84; otherwise use the standard method.
- Single dwelling unit (120.82)
- Eligibility (120.82(A))
The dwelling must be served by a single 120/240 V or 208Y/120 V, 3-wire set of service or feeder conductors with an ampacity of 100 A or greater . The neutral may still be calculated under 120.61.
General loads (120.82(B))
Add the following and take the first 8 kVA at 100% plus 40% of the remainder (2026 NEC; the 2023 edition used the first 10 kVA):
General lighting: 2 VA/ft² (2026 NEC; formerly 3 VA/ft²), with floor area per 120.5(C).
Small-appliance and laundry circuits: 1,500 VA for each 20 A small-appliance circuit (at least two) and each laundry circuit (at least one).
Appliances at nameplate: appliances fastened in place, permanently connected, or on a specific circuit; ranges, wall ovens, and counter-mounted cooking units; clothes dryers not connected to the laundry circuit; and water heaters.
Motors: nameplate rating of permanently connected motors not already included.
Note that the range and dryer are added at nameplate here, not from Tables 120.55 and 120.54.
Heating and air conditioning (120.82(C))
Include the largest of these:
- Item Load
- (1) Air conditioning 100% of nameplate
- (2) Heat pump without supplemental heat 100% of nameplate
(3) Heat pump with supplemental heat 100% of the heat pump compressor + 65% of the supplemental electric heat for central electric space heating
- (4) Space-heating units, three or fewer separately controlled 65% of nameplate
- (5) Space-heating units, four or more separately controlled 40% of nameplate
- (6) Electric thermal storage and other heating expected to run continuously at full rating 100% of nameplate
- EVSE (120.82(D))
New in 2026: add 100% of the EVSE nameplate rating, calculated as in 120.57, with no demand factor. EVSE is a large, long-duration load, so it is no longer reduced with the general loads.
Worked example: the same 2,000 ft² house
The house from the standard-method section has a 12 kW range, 5.5 kW dryer, 4.5 kW water heater, 1.2 kW dishwasher, 0.8 kW disposal, 1.5 kW built-in microwave, 10 kW electric furnace, 5 kVA A/C, and 9.6 kW EVSE.
General loads: 4000 + 3000 + 1500 + 12,000 + 5500 + 4500 + 1200 + 800 + 1500 = 34,000 4000 + 3000 + 1500 + 12{,}000 + 5500 + 4500 + 1200 + 800 + 1500 = 34{,}000 4000 + 3000 + 1500 + 12 , 000 + 5500 + 4500 + 1200 + 800 + 1500 = 34 , 000 VA.
Demand: 8000 + ( 34,000 − 8000 ) × 0.40 = 8000 + 10,400 = 18,400 8000 + (34{,}000 - 8000) \times 0.40 = 8000 + 10{,}400 = 18{,}400 8000 + ( 34 , 000 − 8000 ) × 0.40 = 8000 + 10 , 400 = 18 , 400 VA.
Heating or cooling: A/C at 100% = 5,000 VA; one electric furnace at 65% = 6,500 VA. Use 6,500 VA .
EVSE: 9,600 VA .
Total: 18,400 + 6500 + 9600 = 34,500 18{,}400 + 6500 + 9600 = 34{,}500 18 , 400 + 6500 + 9600 = 34 , 500 VA, and 34,500 ÷ 240 = 143.75 34{,}500 \div 240 = 143.75 34 , 500 ÷ 240 = 143.75 A.
The optional method supports a 150 A service, while the standard method required 200 A for the same house.
Existing dwelling units (120.83)
Section 120.83 (formerly 220.83) provides an optional way to decide whether an existing dwelling service can carry added loads , such as a heat pump or EVSE. The 2026 edition consolidated the older two-part method into a single Table 120.83, uses the 2 VA/ft² lighting load, and adds demand factors for new loads such as EVSE. Section 120.87 also allows existing loads to be based on the maximum demand data for one year, with conditions.
- Multifamily dwellings (120.84)
- Conditions (120.84(A))
The optional multifamily calculation may be used for a building of three or more units only when all of these are true:
- no dwelling unit is supplied by more than one feeder;
- each unit has electric cooking equipment ; and
each unit has electric space heating, air conditioning, or both .
House loads, such as corridor lighting and elevators, are calculated by the standard method and added to the Table 120.84 result (120.84(B)).
Table 120.84 demand factors
- Units Demand Units Demand
- 3–5 45% 22–23 36%
- 6–7 44% 24–25 35%
- 8–10 43% 26–27 34%
- 11 42% 28–30 33%
- 12–13 41% 31 32%
- 14–15 40% 32–33 31%
- 16–17 39% 34–36 30%
- 18–20 38% 37–38 29%
- 21 37% 39–42 28%
The table continues down to 23% for 62 or more units. The connected load for each unit includes its general lighting, small-appliance and laundry circuits, appliances at nameplate, and the larger of heating or air conditioning.
Two dwelling units (120.85): where a feeder serves two units and the standard calculation exceeds the optional result for three identical units, the lesser of the two loads may be used.
Example: a 10-unit building in which each unit has a total connected load of 40 kVA: 10 × 40 = 400 10 \times 40 = 400 10 × 40 = 400 kVA; Table 120.84 for 8 to 10 units is 43%, so the demand is 400 × 0.43 = 172 400 \times 0.43 = 172 400 × 0.43 = 172 kVA, plus the house loads.