Study guide

7.2 Outside Feeders & Separate Buildings (Article 225 & 250.32)

Minnesota Journeyman Electrician Study Guide Exam

Track your progress as you read

Finished sections get a check mark.

1 Minnesota Exam, Licensing & Electrical Law

1.1 Exam Format, Provided References, Scoring & Scheduling 1.2 The Minnesota Electrical Act, Board of Electricity & Code Adoption 1.3 Personal Licenses, Scope of Work & Electrical Contractors 1.4 Experience Credit, Registration, Reciprocity, Renewal & Continuing Education 1.5 Direct Supervision, Ratios & Licensing Exemptions 1.6 Electrical Permits, Inspections, Condemnation & Enforcement

2 Electrical Theory, Math & Power Calculations

2.1 Exam Math, Ohm's Law, Watt's Law & Series/Parallel Circuits 2.2 AC Fundamentals: Reactance, Impedance & Power Factor 2.3 Three-Phase Systems: Wye vs. Delta Calculations 2.4 Voltage Drop Calculations & Chapter 9 Conductor Properties 2.5 Transformer Ratios, Connections, Taps & Available Fault Current 2.6 Motor Connections, Control Circuits & Troubleshooting

3 NEC Structure & General Requirements

3.1 Navigating the 2026 NEC: Article 90, Code Structure & Article 100 Definitions 3.2 NEC Article 110: Working Clearances, Dedicated Space & Termination Ratings 3.3 Over-1000-Volt Installations, Guarding & Manholes (Article 110, Parts III–V)

4 Conductors, Identification & Ampacity

4.1 Conductor Insulation Types, Copper vs. Aluminum & Table 310.16 Allowable Ampacities 4.2 Ampacity Derating: Ambient Temperature Correction & Raceway Bundling Adjustments 4.3 Conductor Identification, Splices & Parallel Conductors

5 Branch Circuits, GFCI/AFCI & Required Outlets

5.1 Branch Circuit Sizing, Overcurrent Ratings & Multiwire Branch Circuits 5.2 GFCI & AFCI Protection Requirements (NEC 210.8 & 210.12) 5.3 Dwelling Receptacle Outlets, Required Circuits & Lighting Outlets (NEC 210.11, 210.52, 210.63 & 210.70)

6 Load Calculations (2026 NEC Article 120)

6.1 Article 120 Basics: Dwelling Lighting, Small-Appliance & Laundry Loads 6.2 Dwelling Standard Method: Appliances, Dryers, Ranges, Heating, EVSE & Neutral 6.3 Optional Methods: Single Dwelling, Existing Dwelling & Multifamily (2026 NEC 120.82–120.85) 6.4 Commercial Lighting, Receptacle, Sign & Show-Window Loads (Table 120.42(A) & 120.44) 6.5 Commercial Kitchens, Schools & Restaurants (2026 NEC 120.56, 120.86 & 120.88) 6.6 Farm Load Calculations (2026 NEC 120.102 & 120.103) 6.7 Feeder & Service Neutral Sizing (2026 NEC 120.61)

7 Feeders, Outside Wiring & Services

7.1 Feeder Design & Sizing Requirements (NEC Article 215) 7.2 Outside Feeders & Separate Buildings (Article 225 & 250.32) 7.3 Service Clearances, Overhead Drops & Underground Service Laterals 7.4 Service Equipment, Disconnecting Means, Surge Protection & GFPE (2026 NEC Article 230)

8 Overcurrent Protection

8.1 Overcurrent Protective Devices: Fuses, Breakers & Standard Ampere Ratings 8.2 Conductor Overcurrent Protection & Feeder Tap Rules (NEC 240.4 & 240.21) 8.3 OCPD Location, Breaker Voltage Ratings, Handle Ties & Arc Energy Reduction

9 System Grounding & Grounding Electrodes

9.1 Grounding vs. Bonding Principles & System Grounding (NEC Article 250 Parts I-II) 9.2 Grounding Electrode System: Permitted Electrodes & Installation (NEC 250.50 & 250.52) 9.3 Grounding Electrode Conductor (GEC) Sizing & Protection (NEC Table 250.66) 9.4 Main Bonding Jumper, System Bonding Jumper & Separately Derived Systems

10 Bonding & Equipment Grounding

10.1 Equipment Grounding Conductor (EGC) Types, Identification & Sizing (NEC Table 250.122) 10.2 Proportional Upsizing of EGC for Voltage Drop (NEC 250.122(B)) 10.3 Bonding of Interior Metal Piping, Structural Steel & Other Systems (NEC 250.104) 10.4 Bonding Methods, Equipment Requiring Grounding & Receptacle Grounding

11 General Wiring Methods & Underground Installations

11.1 General Wiring Methods & Mechanical Protection (NEC Article 300) 11.2 Underground Wiring Cover Requirements (NEC Table 300.7) 11.3 Securing & Supporting, Plenums, Firestopping & Raceway Installation (Article 300)

12 Raceways, Cables & Conduit Fill

12.1 Metal (RMC, IMC, EMT) & Nonmetallic (PVC, RTRC, LFNC) Raceways 12.2 Flexible Conduits, ENT, Wireways, Auxiliary Gutters & Surface Raceways 12.3 Busways & Cable Tray Systems (Articles 368 & 392) 12.4 Cable Assemblies (NM, UF, MC) & Minnesota Cold-Weather Installation Rules 12.5 Conduit & Tubing Fill Calculations (Chapter 9 & Annex C)

13 Boxes, Conduit Bodies & Cabinets

13.1 Box Installation, Support, Accessibility & Luminaire and Fan Boxes (Article 314) 13.2 Outlet, Switch & Junction Box Fill Calculations (NEC 314.16) 13.3 Pull and Junction Box Sizing for Conductors 4 AWG & Larger (NEC 314.28) 13.4 Cabinets, Cutout Boxes & Wire Bending Space (NEC Article 312)

14 Cords, Wiring Devices, Panelboards, Luminaires & Appliances

14.1 Flexible Cords, Flexible Cables & Fixture Wires (Articles 400 & 402) 14.2 Switches, Receptacles & Wiring Devices (Articles 404 & 406) 14.3 Panelboards, Switchboards & Switchgear (NEC Article 408) 14.4 Luminaires, Lampholders, Lighting Track & Low-Voltage Lighting (Articles 410 & 411) 14.5 Appliances, Fixed Electric Space Heating & Deicing Equipment (Articles 422, 424 & 426)

15 Motors, Controllers & Air Conditioning

15.1 Motor Full-Load Current Determination & Conductor Sizing (NEC 430.6 & 430.22) 15.2 Motor Branch-Circuit Short-Circuit & Ground-Fault Protection (NEC Table 430.52) 15.3 Motor Overload Protection & Feeder Calculations for Multiple Motors (NEC 430.32 & 430.24) 15.4 Motor Controllers, Disconnecting Means, Drives & Motor Control Centers (Article 430 Parts VII–XI) 15.5 Air Conditioning & Refrigeration Equipment (NEC Article 440)

16 Transformers, Generators & Equipment Over 1000 Volts

16.1 Transformer Overcurrent Protection & Sizing (NEC Article 450) 16.2 Generators & Transfer Switches (NEC Article 445) 16.3 Capacitors, Transformers Over 1000 V & Medium-Voltage Equipment (Articles 460, 450 & 495)

17 Hazardous (Classified) Locations

17.1 Hazardous (Classified) Locations: Classes, Divisions & Zones (NEC Articles 500-506) 17.2 Class I Locations: Wiring Methods & Conduit Seal-Offs (NEC Article 501) 17.3 Class II & Class III Locations and the Zone System (Articles 502, 503, 505 & 506) 17.4 Commercial Garages & Motor Fuel Dispensing Facilities (NEC Articles 511 & 514) 17.5 Spray Areas, Aircraft Hangars, Hazardous-Location Bonding & Intrinsic Safety (Articles 500, 504, 513 & 516)

18 Health Care, Assembly, Agricultural & Mobile Occupancies

18.1 Health Care Facilities: Patient Care Spaces & Redundant Grounding (NEC Article 517) 18.2 Places of Assembly, Carnivals & Fairs, and Temporary Installations (Articles 518, 525 & 590) 18.3 Agricultural Buildings, Equipotential Planes & Farm Distribution Points (Article 547) 18.4 Mobile & Manufactured Homes, RV Parks, and Marinas & Docks (Articles 550, 551 & 555)

19 Signs, Elevators, Pools, Solar & Other Specific Equipment

19.1 Signs & Outline Lighting, Office Partitions, IT Rooms & Irrigation Machines (Articles 600, 605, 645 & 675) 19.2 Elevators, Escalators & Platform Lifts (Article 620) 19.3 Swimming Pools, Spas & Water Features: Equipotential Bonding & GFCI (NEC Article 680) 19.4 Spas, Hot Tubs, Hydromassage Bathtubs, Fountains & Natural Bodies of Water (Article 680 Parts IV–VII & Article 682) 19.5 Solar Photovoltaic Systems (Article 690) 19.6 Small Wind Systems, Fire Pumps & Electric Vehicle Charging (Articles 694, 695 & 625)

20 Emergency, Standby & Interconnected Power Sources

20.1 Emergency Systems vs. Legally Required vs. Optional Standby (NEC Articles 700, 701, 702) 20.2 Interconnected Power Sources, Energy Storage & Power Control Systems (Articles 705, 706, 480 & 130)

21 Limited-Energy, Fire Alarm & Communications Systems

21.1 Remote-Control, Signaling & Power-Limited Circuits: Class 1, 2 & 3 (2026 Articles 206, 720–725) 21.2 Class 4 Fault-Managed Power, Tray Cables, Fire-Resistive Cable Systems & Limited-Energy Grounding (Articles 726, 727, 742, 750 & 772) 21.3 Fire Alarm Systems: NPLFA vs. PLFA Wiring & Overcurrent Protection (NEC Article 760) 21.4 Optical Fiber Cables & Communications Systems Entering Buildings (2026 Articles 720–723, 800, 810, 820)

7.2 Outside Feeders & Separate Buildings (Article 225 & 250.32)

Key Takeaways Explain This Topic AI

A building or structure supplied by a feeder may have only one feeder or branch circuit supplying it, unless 225.30 permits more, such as for fire pumps, emergency or standby systems, or different voltage characteristics.

Each building must have a disconnecting means for all ungrounded supply conductors, either inside nearest the point of entrance or outside on or within sight of the building (225.31).

At a separate building supplied by a feeder, the equipment grounding conductor run with the feeder is connected to the building's grounding electrode system, and the neutral is not bonded to the enclosure (250.32(B)).

Overhead feeder conductors must be at least 10 AWG copper for spans up to 50 ft and 8 AWG copper for longer spans, unless supported by a messenger (225.6(A)).

Overhead feeder conductors need 12 ft of clearance over residential driveways at 300 V or less to ground and 18 ft over public streets and roads subject to truck traffic (225.18).

Last updated: October 2026

Why separate buildings are tested

Minnesota homes have detached garages and shops, and farms have many outbuildings. DLI's knowledge areas include outside branch circuits and feeders and grounding of separate buildings . Most errors come from treating a feeder-supplied building like a service: bonding the neutral at the second panel, or running only three wires.

Number of supplies (225.30)

A building or structure supplied by a feeder or branch circuit may have only one feeder or branch circuit supplying it, unless 225.30 permits additional supplies for:

special conditions: fire pumps, emergency systems, legally required and optional standby systems, parallel power production, and systems designed for multiple sources for enhanced reliability;

special occupancies: by special permission, for multiple-occupancy buildings without space for supply equipment accessible to all occupants, or very large buildings;

capacity requirements: where the load exceeds what one supply can provide; and

different characteristics: different voltages, frequencies, or phases, or different uses.

Where a building has more than one supply, 225.37 requires a permanent plaque or directory at each disconnect location identifying all other supplies and the area served by each.

Disconnecting means (225.31 to 225.41)

Rule Requirement

Required disconnect (225.31(A)) A means to disconnect all ungrounded conductors that supply or pass through the building

Location (225.31(B)) Readily accessible, either inside nearest the point of entrance of the conductors or outside ; the 2026 NEC states that an outside disconnect must be on or within sight of the building (110.29)

Number (225.33) Not more than six switches or sets of circuit breakers for each supply, grouped at one location (225.34)

Rating and type (225.36) Suitable for use as service equipment; for garages and outbuildings on residential property, a snap switch or a set of 3-way or 4-way snap switches is permitted

Emergency disconnect (225.41) One- and two-family dwellings supplied by a feeder need an emergency disconnecting means in a readily accessible outdoor location on or within sight of the dwelling; the 2026 NEC clarifies that one disconnect can satisfy both 225.31 and 225.41

"Within sight" means visible and not more than 50 ft away (110.29).

Outdoor lighting (225.7)

Part I of Article 225 also covers outdoor lighting supplied by outside branch circuits and feeders:

Common neutral (225.7(B)): where outdoor lighting circuits share a neutral, its ampacity may not be less than the maximum net computed load current between the neutral and all ungrounded conductors connected to any one phase.

277 V to ground (225.7(C)): circuits over 120 V between conductors and not over 277 V to ground may supply luminaires lighting outdoor areas of industrial establishments, office buildings, schools, stores, and other commercial or public buildings. This is how 480Y/277 V parking-lot lighting is fed.

Up to 1000 V between conductors (225.7(D)): circuits over 277 V to ground and not over 1000 V between conductors may supply the auxiliary equipment of electric-discharge lamps where 210.6 allows it, such as luminaires on poles at least 22 ft high for parking lots, roads, and athletic fields, or at least 18 ft high on other structures such as tunnels.

Overhead feeder spans

Rule Requirement

Conductor size (225.6(A)) At least 10 AWG copper (8 AWG aluminum) for spans up to 50 ft ; 8 AWG copper (6 AWG aluminum) for longer spans, unless supported by a messenger wire

Clearance from ground (225.18) 10 ft over areas accessible to pedestrians only, at the electric service entrance, for cables at 150 V to ground or less; 12 ft over residential property and driveways and commercial areas not subject to truck traffic, at 300 V to ground or less; 15 ft for those areas above 300 V to ground; 18 ft over public streets, alleys, roads, parking areas subject to truck traffic, and nonresidential driveways; 24.5 ft over railroad tracks

Clearance from buildings (225.19) Generally 8 ft 6 in. above roofs, with exceptions similar to services; 3 ft from windows that open, doors, porches, balconies, ladders, stairs, and fire escapes

  • Vegetation (225.26) Trees and other vegetation may not be used to support overhead conductor spans
  • Underground feeders

An underground feeder to a detached building follows the Article 300 burial depths, which the 2026 NEC moved from 300.5 to 300.7 . Conductors in underground raceways are in a wet location and need wet-rated insulation such as THWN-2 or XHHW-2. Raceways entering a building from underground must be sealed or plugged where moisture could contact live parts.

Grounding and bonding at the separate building (250.32)

250.32(A) Grounding electrode: each building supplied by a feeder or branch circuit needs a grounding electrode system per Part III of Article 250, connected to the building disconnecting means. A building supplied by a single branch circuit (including a multiwire branch circuit) with an equipment grounding conductor does not need an electrode.

250.32(B)(1) Equipment grounding conductor: the supply must include an equipment grounding conductor sized from Table 250.122. It connects to the building disconnecting means and to the grounding electrode system. The grounded (neutral) conductor may not be connected to the equipment grounding conductor or to the grounding electrodes at the second building. In practice:

  • run four wires for a 120/240 V feeder: two ungrounded conductors, a neutral, and an EGC;
  • use a panelboard with an isolated neutral bar, and remove or do not install the bonding screw or strap;

land the EGC and the grounding electrode conductor on the equipment grounding bar.

An exception allows existing installations, made under earlier Code editions that permitted it, to keep using the grounded conductor for grounding where no EGC was run, there are no continuous metallic paths between buildings, and no ground-fault protection of equipment is installed at the supply. New work never uses this method.

250.32(E) Grounding electrode conductor: sized from 250.66 based on the largest ungrounded supply conductor.

Bonding the neutral at the second building creates parallel paths, so normal neutral current flows on the EGC, metal raceways, water pipes, and the earth. This creates shock hazards and stray voltage, a serious problem around livestock.

Worked example: detached garage

A 60 A, 120/240 V feeder supplies a detached garage from the house panel, underground in PVC.

Conductors: 6 AWG copper THWN-2 for the two ungrounded conductors and the neutral (65 A at 75°C), protected at 60 A.

EGC: Table 250.122 for a 60 A OCPD is 10 AWG copper .

Disconnect: a main breaker or switch at the garage, suitable as service equipment, or a snap switch if the garage is on residential property and the load permits.

Electrode: install a grounding electrode system, such as a ground rod supplemented by a second rod at least 6 ft away, unless one rod measures 25 Ω or less.

GEC: for 6 AWG copper supply conductors, Table 250.66 gives 8 AWG copper ; a GEC connected only to rods need not be larger than 6 AWG copper.

Neutral: isolated from the enclosure at the garage panel.