Study guide
12.2 Flexible Conduits, ENT, Wireways, Auxiliary Gutters & Surface Raceways
Minnesota Journeyman Electrician Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Minnesota Exam, Licensing & Electrical Law
1.1 Exam Format, Provided References, Scoring & Scheduling 1.2 The Minnesota Electrical Act, Board of Electricity & Code Adoption 1.3 Personal Licenses, Scope of Work & Electrical Contractors 1.4 Experience Credit, Registration, Reciprocity, Renewal & Continuing Education 1.5 Direct Supervision, Ratios & Licensing Exemptions 1.6 Electrical Permits, Inspections, Condemnation & Enforcement
2 Electrical Theory, Math & Power Calculations
2.1 Exam Math, Ohm's Law, Watt's Law & Series/Parallel Circuits 2.2 AC Fundamentals: Reactance, Impedance & Power Factor 2.3 Three-Phase Systems: Wye vs. Delta Calculations 2.4 Voltage Drop Calculations & Chapter 9 Conductor Properties 2.5 Transformer Ratios, Connections, Taps & Available Fault Current 2.6 Motor Connections, Control Circuits & Troubleshooting
3 NEC Structure & General Requirements
3.1 Navigating the 2026 NEC: Article 90, Code Structure & Article 100 Definitions 3.2 NEC Article 110: Working Clearances, Dedicated Space & Termination Ratings 3.3 Over-1000-Volt Installations, Guarding & Manholes (Article 110, Parts III–V)
4 Conductors, Identification & Ampacity
4.1 Conductor Insulation Types, Copper vs. Aluminum & Table 310.16 Allowable Ampacities 4.2 Ampacity Derating: Ambient Temperature Correction & Raceway Bundling Adjustments 4.3 Conductor Identification, Splices & Parallel Conductors
5 Branch Circuits, GFCI/AFCI & Required Outlets
5.1 Branch Circuit Sizing, Overcurrent Ratings & Multiwire Branch Circuits 5.2 GFCI & AFCI Protection Requirements (NEC 210.8 & 210.12) 5.3 Dwelling Receptacle Outlets, Required Circuits & Lighting Outlets (NEC 210.11, 210.52, 210.63 & 210.70)
6 Load Calculations (2026 NEC Article 120)
6.1 Article 120 Basics: Dwelling Lighting, Small-Appliance & Laundry Loads 6.2 Dwelling Standard Method: Appliances, Dryers, Ranges, Heating, EVSE & Neutral 6.3 Optional Methods: Single Dwelling, Existing Dwelling & Multifamily (2026 NEC 120.82–120.85) 6.4 Commercial Lighting, Receptacle, Sign & Show-Window Loads (Table 120.42(A) & 120.44) 6.5 Commercial Kitchens, Schools & Restaurants (2026 NEC 120.56, 120.86 & 120.88) 6.6 Farm Load Calculations (2026 NEC 120.102 & 120.103) 6.7 Feeder & Service Neutral Sizing (2026 NEC 120.61)
7 Feeders, Outside Wiring & Services
7.1 Feeder Design & Sizing Requirements (NEC Article 215) 7.2 Outside Feeders & Separate Buildings (Article 225 & 250.32) 7.3 Service Clearances, Overhead Drops & Underground Service Laterals 7.4 Service Equipment, Disconnecting Means, Surge Protection & GFPE (2026 NEC Article 230)
8 Overcurrent Protection
8.1 Overcurrent Protective Devices: Fuses, Breakers & Standard Ampere Ratings 8.2 Conductor Overcurrent Protection & Feeder Tap Rules (NEC 240.4 & 240.21) 8.3 OCPD Location, Breaker Voltage Ratings, Handle Ties & Arc Energy Reduction
9 System Grounding & Grounding Electrodes
9.1 Grounding vs. Bonding Principles & System Grounding (NEC Article 250 Parts I-II) 9.2 Grounding Electrode System: Permitted Electrodes & Installation (NEC 250.50 & 250.52) 9.3 Grounding Electrode Conductor (GEC) Sizing & Protection (NEC Table 250.66) 9.4 Main Bonding Jumper, System Bonding Jumper & Separately Derived Systems
10 Bonding & Equipment Grounding
10.1 Equipment Grounding Conductor (EGC) Types, Identification & Sizing (NEC Table 250.122) 10.2 Proportional Upsizing of EGC for Voltage Drop (NEC 250.122(B)) 10.3 Bonding of Interior Metal Piping, Structural Steel & Other Systems (NEC 250.104) 10.4 Bonding Methods, Equipment Requiring Grounding & Receptacle Grounding
11 General Wiring Methods & Underground Installations
11.1 General Wiring Methods & Mechanical Protection (NEC Article 300) 11.2 Underground Wiring Cover Requirements (NEC Table 300.7) 11.3 Securing & Supporting, Plenums, Firestopping & Raceway Installation (Article 300)
12 Raceways, Cables & Conduit Fill
12.1 Metal (RMC, IMC, EMT) & Nonmetallic (PVC, RTRC, LFNC) Raceways 12.2 Flexible Conduits, ENT, Wireways, Auxiliary Gutters & Surface Raceways 12.3 Busways & Cable Tray Systems (Articles 368 & 392) 12.4 Cable Assemblies (NM, UF, MC) & Minnesota Cold-Weather Installation Rules 12.5 Conduit & Tubing Fill Calculations (Chapter 9 & Annex C)
13 Boxes, Conduit Bodies & Cabinets
13.1 Box Installation, Support, Accessibility & Luminaire and Fan Boxes (Article 314) 13.2 Outlet, Switch & Junction Box Fill Calculations (NEC 314.16) 13.3 Pull and Junction Box Sizing for Conductors 4 AWG & Larger (NEC 314.28) 13.4 Cabinets, Cutout Boxes & Wire Bending Space (NEC Article 312)
14 Cords, Wiring Devices, Panelboards, Luminaires & Appliances
14.1 Flexible Cords, Flexible Cables & Fixture Wires (Articles 400 & 402) 14.2 Switches, Receptacles & Wiring Devices (Articles 404 & 406) 14.3 Panelboards, Switchboards & Switchgear (NEC Article 408) 14.4 Luminaires, Lampholders, Lighting Track & Low-Voltage Lighting (Articles 410 & 411) 14.5 Appliances, Fixed Electric Space Heating & Deicing Equipment (Articles 422, 424 & 426)
15 Motors, Controllers & Air Conditioning
15.1 Motor Full-Load Current Determination & Conductor Sizing (NEC 430.6 & 430.22) 15.2 Motor Branch-Circuit Short-Circuit & Ground-Fault Protection (NEC Table 430.52) 15.3 Motor Overload Protection & Feeder Calculations for Multiple Motors (NEC 430.32 & 430.24) 15.4 Motor Controllers, Disconnecting Means, Drives & Motor Control Centers (Article 430 Parts VII–XI) 15.5 Air Conditioning & Refrigeration Equipment (NEC Article 440)
16 Transformers, Generators & Equipment Over 1000 Volts
16.1 Transformer Overcurrent Protection & Sizing (NEC Article 450) 16.2 Generators & Transfer Switches (NEC Article 445) 16.3 Capacitors, Transformers Over 1000 V & Medium-Voltage Equipment (Articles 460, 450 & 495)
17 Hazardous (Classified) Locations
17.1 Hazardous (Classified) Locations: Classes, Divisions & Zones (NEC Articles 500-506) 17.2 Class I Locations: Wiring Methods & Conduit Seal-Offs (NEC Article 501) 17.3 Class II & Class III Locations and the Zone System (Articles 502, 503, 505 & 506) 17.4 Commercial Garages & Motor Fuel Dispensing Facilities (NEC Articles 511 & 514) 17.5 Spray Areas, Aircraft Hangars, Hazardous-Location Bonding & Intrinsic Safety (Articles 500, 504, 513 & 516)
18 Health Care, Assembly, Agricultural & Mobile Occupancies
18.1 Health Care Facilities: Patient Care Spaces & Redundant Grounding (NEC Article 517) 18.2 Places of Assembly, Carnivals & Fairs, and Temporary Installations (Articles 518, 525 & 590) 18.3 Agricultural Buildings, Equipotential Planes & Farm Distribution Points (Article 547) 18.4 Mobile & Manufactured Homes, RV Parks, and Marinas & Docks (Articles 550, 551 & 555)
19 Signs, Elevators, Pools, Solar & Other Specific Equipment
19.1 Signs & Outline Lighting, Office Partitions, IT Rooms & Irrigation Machines (Articles 600, 605, 645 & 675) 19.2 Elevators, Escalators & Platform Lifts (Article 620) 19.3 Swimming Pools, Spas & Water Features: Equipotential Bonding & GFCI (NEC Article 680) 19.4 Spas, Hot Tubs, Hydromassage Bathtubs, Fountains & Natural Bodies of Water (Article 680 Parts IV–VII & Article 682) 19.5 Solar Photovoltaic Systems (Article 690) 19.6 Small Wind Systems, Fire Pumps & Electric Vehicle Charging (Articles 694, 695 & 625)
20 Emergency, Standby & Interconnected Power Sources
20.1 Emergency Systems vs. Legally Required vs. Optional Standby (NEC Articles 700, 701, 702) 20.2 Interconnected Power Sources, Energy Storage & Power Control Systems (Articles 705, 706, 480 & 130)
21 Limited-Energy, Fire Alarm & Communications Systems
21.1 Remote-Control, Signaling & Power-Limited Circuits: Class 1, 2 & 3 (2026 Articles 206, 720–725) 21.2 Class 4 Fault-Managed Power, Tray Cables, Fire-Resistive Cable Systems & Limited-Energy Grounding (Articles 726, 727, 742, 750 & 772) 21.3 Fire Alarm Systems: NPLFA vs. PLFA Wiring & Overcurrent Protection (NEC Article 760) 21.4 Optical Fiber Cables & Communications Systems Entering Buildings (2026 Articles 720–723, 800, 810, 820)
12.2 Flexible Conduits, ENT, Wireways, Auxiliary Gutters & Surface Raceways
Key Takeaways Explain This Topic AI
FMC and LFMC must be secured within 12 in. of each box or fitting and at intervals not exceeding 4½ ft, with exceptions for fished runs and short lengths at terminals where flexibility is needed (348.30 and 350.30).
ENT is permitted exposed or concealed in buildings of three floors or less above grade, and concealed behind a 15-minute finish rating in taller buildings (362.10).
Conductors in a metal wireway may not fill more than 20% of its interior cross-sectional area, and splices and taps may not fill more than 75% at any point (376.22 and 376.56).
Ampacity adjustment factors apply to wireways and auxiliary gutters only when more than 30 current-carrying conductors are present at any cross section (376.22(B) and 366.23).
Metal wireways must be supported at intervals not exceeding 5 ft horizontally and 15 ft vertically (376.30).
Last updated: October 2026
Flexible raceways
Wiring method Article Key uses and limits Securing and supporting
Flexible metal conduit (FMC) 348 Dry locations; not in wet locations, hoistways (with exceptions), storage battery rooms, hazardous locations (except as permitted), underground, embedded in concrete, or where subject to physical damage; minimum trade size ½ (⅜ in specific cases, such as luminaire and motor whips not over 6 ft) Within 12 in. of each box and every 4½ ft
Liquidtight flexible metal conduit (LFMC) 350 Where flexibility or protection from liquids, vapors, or solids is needed; direct burial where listed and marked; not where subject to physical damage Within 12 in. and every 4½ ft
Liquidtight flexible nonmetallic conduit (LFNC) 356 Where flexibility and liquidtight protection are needed; outdoors and direct burial where listed and marked; not where subject to physical damage or above its temperature rating Within 12 in. of each box and every 3 ft
Flexible metallic tubing (FMT) 360 Dry locations, concealed or accessible, branch circuits; trade sizes ⅜ to ¾ Per its listing and Article 360
Common exceptions to support: fished runs; lengths of not more than 3 ft at terminals where flexibility is necessary; and lengths of not more than 6 ft from the last support to a luminaire or other equipment within an accessible ceiling. Listed fittings may count as a means of securement.
Bends: the total of bends between pull points may not exceed 360 degrees (and the 2026 NEC 300.24 applies that limit across transitions between raceway types).
Grounding: FMC and LFMC may serve as the EGC only within the limits of 250.118: fittings listed for grounding, 6 ft maximum total flexible length in the ground return path, circuits of 20 A or less (FMC and ⅜–½ LFMC) or 60 A or less (¾–1¼ LFMC), trade size not over 1¼, and not where flexibility after installation is required. Otherwise run a wire-type EGC. LFNC is nonmetallic and always needs an EGC.
Electrical nonmetallic tubing (ENT, Article 362)
ENT is a pliable, corrugated raceway that can be bent by hand.
- Rule Requirement
- Buildings three floors or less above grade Exposed or concealed
Buildings over three floors Concealed in walls, floors, and ceilings that provide a thermal barrier with at least a 15-minute finish rating
- Concrete Embedded in concrete slabs or poured concrete, with fittings identified for the purpose
- Wet locations Indoors, and in concrete slabs on or below grade, with fittings identified for the purpose
Not permitted Hazardous (classified) locations, except as permitted elsewhere; as support for luminaires and other equipment; ambient temperatures above its rating; direct burial ; exposed in theaters and places of assembly, except as permitted; exposed to direct sunlight unless identified as sunlight resistant
- Support (362.30) Within 3 ft of each box and every 3 ft
- Wireways (Articles 376 and 378) and auxiliary gutters (Article 366)
A wireway is a sheet-metal or nonmetallic trough with a hinged or removable cover, used to house and protect conductors laid in after the wireway is installed. An auxiliary gutter supplements the wiring space at switchboards, meter centers, distribution centers, and similar equipment, and may not extend more than 30 ft beyond the equipment it supplements.
- Rule Metal wireway (376) Auxiliary gutter (366)
- Conductor fill 20% of interior cross-sectional area 20%
- Splices and taps Conductors, splices, and taps not over 75% of the area at that point 75%
Ampacity adjustment Table 310.15(C)(1) factors apply only where more than 30 current-carrying conductors are at any cross section Same 30-conductor rule
Support Horizontal: at each end or joint (unless listed otherwise) and every 5 ft ; vertical: every 15 ft , with not more than one joint between supports Sheet-metal gutters every 5 ft
Bending space Where conductors are deflected, Table 312.6(A) applies Same
Wireways may not be used where subject to severe physical damage, and nonmetallic wireways (Article 378) have their own temperature and sunlight limits.
Surface raceways (Articles 386 and 388)
Surface metal raceways are permitted in dry locations and in Class I, Division 2 locations as permitted by Article 501; they are not permitted where subject to severe physical damage, where voltage exceeds 300 V between conductors (unless the metal is at least 0.040 in. thick), in hoistways, or where concealed (with limited exceptions). The number of conductors may not exceed the number the raceway is designed for. Ampacity adjustment is not required in surface metal raceways when all of these are true: the cross-sectional area exceeds 4 in² , there are not more than 30 current-carrying conductors, and fill does not exceed 20% .
Worked example: wireway fill
A 4 in. × 4 in. metal wireway has an interior cross section of 16 in².
Maximum conductor fill: 16 × 0.20 = 3.2 16 \times 0.20 = 3.2 16 × 0.20 = 3.2 in².
Maximum fill at a splice point: 16 × 0.75 = 12 16 \times 0.75 = 12 16 × 0.75 = 12 in².
500 kcmil THHN has an area of 0.7073 in² (Chapter 9, Table 5). The wireway can hold 3.2 ÷ 0.7073 = 4.5 3.2 \div 0.7073 = 4.5 3.2 ÷ 0.7073 = 4.5 , so 4 conductors of 500 kcmil THHN.
With 4 current-carrying conductors (not more than 30), no Table 310.15(C)(1) adjustment applies.