18.4 Mobile & Manufactured Homes, RV Parks, and Marinas & Docks (Articles 550, 551 & 555)

Minnesota Journeyman Electrician Study Guide Exam

Track your progress as you read

Finished sections get a check mark.

1 Minnesota Exam, Licensing & Electrical Law

1.1 Exam Format, Provided References, Scoring & Scheduling 1.2 The Minnesota Electrical Act, Board of Electricity & Code Adoption 1.3 Personal Licenses, Scope of Work & Electrical Contractors 1.4 Experience Credit, Registration, Reciprocity, Renewal & Continuing Education 1.5 Direct Supervision, Ratios & Licensing Exemptions 1.6 Electrical Permits, Inspections, Condemnation & Enforcement

2 Electrical Theory, Math & Power Calculations

2.1 Exam Math, Ohm's Law, Watt's Law & Series/Parallel Circuits 2.2 AC Fundamentals: Reactance, Impedance & Power Factor 2.3 Three-Phase Systems: Wye vs. Delta Calculations 2.4 Voltage Drop Calculations & Chapter 9 Conductor Properties 2.5 Transformer Ratios, Connections, Taps & Available Fault Current 2.6 Motor Connections, Control Circuits & Troubleshooting

3 NEC Structure & General Requirements

3.1 Navigating the 2026 NEC: Article 90, Code Structure & Article 100 Definitions 3.2 NEC Article 110: Working Clearances, Dedicated Space & Termination Ratings 3.3 Over-1000-Volt Installations, Guarding & Manholes (Article 110, Parts III–V)

4 Conductors, Identification & Ampacity

4.1 Conductor Insulation Types, Copper vs. Aluminum & Table 310.16 Allowable Ampacities 4.2 Ampacity Derating: Ambient Temperature Correction & Raceway Bundling Adjustments 4.3 Conductor Identification, Splices & Parallel Conductors

5 Branch Circuits, GFCI/AFCI & Required Outlets

5.1 Branch Circuit Sizing, Overcurrent Ratings & Multiwire Branch Circuits 5.2 GFCI & AFCI Protection Requirements (NEC 210.8 & 210.12) 5.3 Dwelling Receptacle Outlets, Required Circuits & Lighting Outlets (NEC 210.11, 210.52, 210.63 & 210.70)

6 Load Calculations (2026 NEC Article 120)

6.1 Article 120 Basics: Dwelling Lighting, Small-Appliance & Laundry Loads 6.2 Dwelling Standard Method: Appliances, Dryers, Ranges, Heating, EVSE & Neutral 6.3 Optional Methods: Single Dwelling, Existing Dwelling & Multifamily (2026 NEC 120.82–120.85) 6.4 Commercial Lighting, Receptacle, Sign & Show-Window Loads (Table 120.42(A) & 120.44) 6.5 Commercial Kitchens, Schools & Restaurants (2026 NEC 120.56, 120.86 & 120.88) 6.6 Farm Load Calculations (2026 NEC 120.102 & 120.103) 6.7 Feeder & Service Neutral Sizing (2026 NEC 120.61)

7 Feeders, Outside Wiring & Services

7.1 Feeder Design & Sizing Requirements (NEC Article 215) 7.2 Outside Feeders & Separate Buildings (Article 225 & 250.32) 7.3 Service Clearances, Overhead Drops & Underground Service Laterals 7.4 Service Equipment, Disconnecting Means, Surge Protection & GFPE (2026 NEC Article 230)

8 Overcurrent Protection

8.1 Overcurrent Protective Devices: Fuses, Breakers & Standard Ampere Ratings 8.2 Conductor Overcurrent Protection & Feeder Tap Rules (NEC 240.4 & 240.21) 8.3 OCPD Location, Breaker Voltage Ratings, Handle Ties & Arc Energy Reduction

9 System Grounding & Grounding Electrodes

9.1 Grounding vs. Bonding Principles & System Grounding (NEC Article 250 Parts I-II) 9.2 Grounding Electrode System: Permitted Electrodes & Installation (NEC 250.50 & 250.52) 9.3 Grounding Electrode Conductor (GEC) Sizing & Protection (NEC Table 250.66) 9.4 Main Bonding Jumper, System Bonding Jumper & Separately Derived Systems

10 Bonding & Equipment Grounding

10.1 Equipment Grounding Conductor (EGC) Types, Identification & Sizing (NEC Table 250.122) 10.2 Proportional Upsizing of EGC for Voltage Drop (NEC 250.122(B)) 10.3 Bonding of Interior Metal Piping, Structural Steel & Other Systems (NEC 250.104) 10.4 Bonding Methods, Equipment Requiring Grounding & Receptacle Grounding

11 General Wiring Methods & Underground Installations

11.1 General Wiring Methods & Mechanical Protection (NEC Article 300) 11.2 Underground Wiring Cover Requirements (NEC Table 300.7) 11.3 Securing & Supporting, Plenums, Firestopping & Raceway Installation (Article 300)

12 Raceways, Cables & Conduit Fill

12.1 Metal (RMC, IMC, EMT) & Nonmetallic (PVC, RTRC, LFNC) Raceways 12.2 Flexible Conduits, ENT, Wireways, Auxiliary Gutters & Surface Raceways 12.3 Busways & Cable Tray Systems (Articles 368 & 392) 12.4 Cable Assemblies (NM, UF, MC) & Minnesota Cold-Weather Installation Rules 12.5 Conduit & Tubing Fill Calculations (Chapter 9 & Annex C)

13 Boxes, Conduit Bodies & Cabinets

13.1 Box Installation, Support, Accessibility & Luminaire and Fan Boxes (Article 314) 13.2 Outlet, Switch & Junction Box Fill Calculations (NEC 314.16) 13.3 Pull and Junction Box Sizing for Conductors 4 AWG & Larger (NEC 314.28) 13.4 Cabinets, Cutout Boxes & Wire Bending Space (NEC Article 312)

14 Cords, Wiring Devices, Panelboards, Luminaires & Appliances

14.1 Flexible Cords, Flexible Cables & Fixture Wires (Articles 400 & 402) 14.2 Switches, Receptacles & Wiring Devices (Articles 404 & 406) 14.3 Panelboards, Switchboards & Switchgear (NEC Article 408) 14.4 Luminaires, Lampholders, Lighting Track & Low-Voltage Lighting (Articles 410 & 411) 14.5 Appliances, Fixed Electric Space Heating & Deicing Equipment (Articles 422, 424 & 426)

15 Motors, Controllers & Air Conditioning

15.1 Motor Full-Load Current Determination & Conductor Sizing (NEC 430.6 & 430.22) 15.2 Motor Branch-Circuit Short-Circuit & Ground-Fault Protection (NEC Table 430.52) 15.3 Motor Overload Protection & Feeder Calculations for Multiple Motors (NEC 430.32 & 430.24) 15.4 Motor Controllers, Disconnecting Means, Drives & Motor Control Centers (Article 430 Parts VII–XI) 15.5 Air Conditioning & Refrigeration Equipment (NEC Article 440)

16 Transformers, Generators & Equipment Over 1000 Volts

16.1 Transformer Overcurrent Protection & Sizing (NEC Article 450) 16.2 Generators & Transfer Switches (NEC Article 445) 16.3 Capacitors, Transformers Over 1000 V & Medium-Voltage Equipment (Articles 460, 450 & 495)

17 Hazardous (Classified) Locations

17.1 Hazardous (Classified) Locations: Classes, Divisions & Zones (NEC Articles 500-506) 17.2 Class I Locations: Wiring Methods & Conduit Seal-Offs (NEC Article 501) 17.3 Class II & Class III Locations and the Zone System (Articles 502, 503, 505 & 506) 17.4 Commercial Garages & Motor Fuel Dispensing Facilities (NEC Articles 511 & 514) 17.5 Spray Areas, Aircraft Hangars, Hazardous-Location Bonding & Intrinsic Safety (Articles 500, 504, 513 & 516)

18 Health Care, Assembly, Agricultural & Mobile Occupancies

18.1 Health Care Facilities: Patient Care Spaces & Redundant Grounding (NEC Article 517) 18.2 Places of Assembly, Carnivals & Fairs, and Temporary Installations (Articles 518, 525 & 590) 18.3 Agricultural Buildings, Equipotential Planes & Farm Distribution Points (Article 547) 18.4 Mobile & Manufactured Homes, RV Parks, and Marinas & Docks (Articles 550, 551 & 555)

19 Signs, Elevators, Pools, Solar & Other Specific Equipment

19.1 Signs & Outline Lighting, Office Partitions, IT Rooms & Irrigation Machines (Articles 600, 605, 645 & 675) 19.2 Elevators, Escalators & Platform Lifts (Article 620) 19.3 Swimming Pools, Spas & Water Features: Equipotential Bonding & GFCI (NEC Article 680) 19.4 Spas, Hot Tubs, Hydromassage Bathtubs, Fountains & Natural Bodies of Water (Article 680 Parts IV–VII & Article 682) 19.5 Solar Photovoltaic Systems (Article 690) 19.6 Small Wind Systems, Fire Pumps & Electric Vehicle Charging (Articles 694, 695 & 625)

20 Emergency, Standby & Interconnected Power Sources

20.1 Emergency Systems vs. Legally Required vs. Optional Standby (NEC Articles 700, 701, 702) 20.2 Interconnected Power Sources, Energy Storage & Power Control Systems (Articles 705, 706, 480 & 130)

21 Limited-Energy, Fire Alarm & Communications Systems

21.1 Remote-Control, Signaling & Power-Limited Circuits: Class 1, 2 & 3 (2026 Articles 206, 720–725) 21.2 Class 4 Fault-Managed Power, Tray Cables, Fire-Resistive Cable Systems & Limited-Energy Grounding (Articles 726, 727, 742, 750 & 772) 21.3 Fire Alarm Systems: NPLFA vs. PLFA Wiring & Overcurrent Protection (NEC Article 760) 21.4 Optical Fiber Cables & Communications Systems Entering Buildings (2026 Articles 720–723, 800, 810, 820)

18.4 Mobile & Manufactured Homes, RV Parks, and Marinas & Docks (Articles 550, 551 & 555)

Key Takeaways Explain This Topic AI

Mobile home service equipment must be located outside of and not mounted in or on the mobile home, within sight and not more than 30 ft from its exterior wall (550.32(A)).

Mobile home service equipment must be rated at least 100 A at 120/240 V (550.32(C)).

Every RV site with electric supply needs a 20 A, 125 V receptacle; at least 70% of sites need a 30 A, 125 V receptacle; and at least 40% need a 50 A, 125/250 V receptacle (551.71).

The 2026 NEC 555.35(A) requires GFPE with a trip setting of not more than 100 mA on feeders and branch circuits supplying docking facilities and piers.

Marina and floating dock service equipment must be located on land, not on the floating structure, adjacent to the structure it serves (555.4).

Last updated: October 2026

Mobile and manufactured homes (Article 550)

A mobile home is a factory-assembled structure on a permanent chassis, transportable in one or more sections, designed as a dwelling without a permanent foundation. A manufactured home is built to the HUD code and may be placed on a permanent foundation.

Service equipment (550.32)

Rule Requirement

Location (A) Service equipment must be located adjacent to the mobile home and not mounted in or on it; within sight and not more than 30 ft from the exterior wall it serves. The 2026 NEC points to Article 230 for the general service disconnect rules

Manufactured homes (B) Service equipment may be installed in or on a manufactured home placed on a permanent foundation, if the home's grounding and bonding meet Article 250 and the manufacturer's instructions

Rating (C) At least 100 A at 120/240 V , with provisions for connecting the feeder by a permanent wiring method; power outlets used as service equipment may contain receptacles rated up to 50 A with appropriate overcurrent protection

Mounting height Outdoor mobile home disconnecting means installed so the bottom of the enclosure is at least 2 ft above finished grade or working platform, and the center of the operating handle grip in its highest position is not more than 6 ft 7 in. above grade

Replacement home (2026) Where existing service equipment is reconnected to a replacement mobile or manufactured home, a surge-protective device per 230.67 must be provided

Feeder to the home

The feeder from the service equipment is a permanent wiring method with four insulated, color-coded conductors : two ungrounded conductors, a neutral, and an equipment grounding conductor . The neutral and EGC are not connected together in the home's panelboard. A mobile home may alternatively use a single listed 50 A, four-conductor power-supply cord , where permitted. An outdoor receptacle and other required outlets in the home follow Article 550 and Article 210.

Mobile home park demand factors

Mobile home park and RV park load calculations were relocated to Article 120 in the 2026 NEC (Parts VIII and IX). For a mobile home park, each lot feeder is calculated at the larger of a minimum of 16,000 VA per lot at 120/240 V or the calculated load of the home, and the park service and feeders apply demand factors that decrease with the number of lots, such as 100% for one lot and 55% for two lots, down to 28% for 61 or more lots.

Recreational vehicle parks (Article 551, Part VI)

Rule Requirement

Receptacles at each site (551.71) Every RV site with electrical supply: at least one 20 A, 125 V receptacle; at least 70% of sites: a 30 A, 125 V receptacle (TT-30); at least 40% of sites: a 50 A, 125/250 V receptacle (14-50); tent sites may have only 20 A receptacles

GFCI 125 V, single-phase, 15- and 20-ampere receptacles at RV sites must be GFCI protected

Supply equipment location On the left (road) side of the parked vehicle, in a line 5 ft to 7 ft from the left edge of the stall, from the rear of the stall to 15 ft forward of the rear

Disconnecting means A switch or circuit breaker in the site supply equipment to disconnect the power supply to the RV

Grounding (551.76) All electrical equipment and installed wiring must be connected to an EGC; the neutral is not bonded to the EGC at the site supply equipment

Load calculations (2026 Article 120, Part VIII) Site base loads such as 9,600 VA for a 50 A, 120/240 V site, 3,600 VA for a 20 A and 30 A site, 2,400 VA for a 20 A only site, and 600 VA for a tent site, with demand factors by number of sites

Marinas, boatyards, and docks (Article 555)

Article 555 covers commercial and noncommercial docking facilities, including one- and two-family dwelling docks , which Minnesota's lakes make very common.

Rule Requirement

Service equipment location (555.4) On land , not closer than 5 ft horizontally from and adjacent to the structure served, and not on or in a floating structure

Engineered design (555.9, new in 2026) Documentation of an engineered electrical design must be provided upon request of the AHJ; not required for one- and two-family dwelling docks at 240 V single phase or less

Shore power receptacles Rated at least 30 A , single type, locking and grounding or pin-and-sleeve; mounted at least 12 in. above the deck of a fixed pier or 12 in. above the surface of a floating pier

Wiring methods Chapter 3 methods identified for wet locations; extra-hard-usage portable power cables where flexibility is required

Bonding (555.13) Non-current-carrying metal parts likely to become energized must be connected to the circuit EGC with a bonding conductor not required to be larger than 8 AWG

Equipotential planes (555.14) Where system voltage exceeds 250 V to ground and equipment is within 10 ft of the water, an equipotential plane must be constructed and bonded as specified

GFPE (555.35(A), 2026) Feeders and branch circuits on docking facilities and piers must have GFPE with a trip current not exceeding 100 mA , coordinated and performance tested by qualified persons, with a written record for the AHJ

GFCI (555.35) 125 V, single-phase, 15- and 20-ampere receptacles other than shore power receptacles must have GFCI protection for personnel

Servicing and replacement (555.15, 2026) Equipment may be serviced to the Code edition under which it was installed; replaced equipment must comply with the current Code, and the circuit must be inspected

Load calculations Marina feeders and services may use demand factors based on the number of shore power receptacles

Electric shock drowning: water around a dock with a ground fault can carry enough current to paralyze a swimmer. The GFPE and bonding rules of Article 555 exist to prevent it.

Worked example: a lake-home dock in Minnesota

A homeowner wants power on a seasonal dock for a boat lift and two receptacles at a 120/240 V single-phase house.

Engineered design: not required, because the system is 240 V single phase or less at a one-family dwelling.

Supply: a feeder or branch circuit from the house, with the disconnect on land.

Protection: GFPE not exceeding 100 mA on the circuits serving the dock, performance tested and recorded, and GFCI protection for the 125 V, 15- and 20-ampere receptacles.

Bonding: connect metal parts likely to become energized, such as the boat lift frame, to the EGC.