Study guide

19.5 Solar Photovoltaic Systems (Article 690)

Minnesota Journeyman Electrician Study Guide Exam

Track your progress as you read

Finished sections get a check mark.

1 Minnesota Exam, Licensing & Electrical Law

1.1 Exam Format, Provided References, Scoring & Scheduling 1.2 The Minnesota Electrical Act, Board of Electricity & Code Adoption 1.3 Personal Licenses, Scope of Work & Electrical Contractors 1.4 Experience Credit, Registration, Reciprocity, Renewal & Continuing Education 1.5 Direct Supervision, Ratios & Licensing Exemptions 1.6 Electrical Permits, Inspections, Condemnation & Enforcement

2 Electrical Theory, Math & Power Calculations

2.1 Exam Math, Ohm's Law, Watt's Law & Series/Parallel Circuits 2.2 AC Fundamentals: Reactance, Impedance & Power Factor 2.3 Three-Phase Systems: Wye vs. Delta Calculations 2.4 Voltage Drop Calculations & Chapter 9 Conductor Properties 2.5 Transformer Ratios, Connections, Taps & Available Fault Current 2.6 Motor Connections, Control Circuits & Troubleshooting

3 NEC Structure & General Requirements

3.1 Navigating the 2026 NEC: Article 90, Code Structure & Article 100 Definitions 3.2 NEC Article 110: Working Clearances, Dedicated Space & Termination Ratings 3.3 Over-1000-Volt Installations, Guarding & Manholes (Article 110, Parts III–V)

4 Conductors, Identification & Ampacity

4.1 Conductor Insulation Types, Copper vs. Aluminum & Table 310.16 Allowable Ampacities 4.2 Ampacity Derating: Ambient Temperature Correction & Raceway Bundling Adjustments 4.3 Conductor Identification, Splices & Parallel Conductors

5 Branch Circuits, GFCI/AFCI & Required Outlets

5.1 Branch Circuit Sizing, Overcurrent Ratings & Multiwire Branch Circuits 5.2 GFCI & AFCI Protection Requirements (NEC 210.8 & 210.12) 5.3 Dwelling Receptacle Outlets, Required Circuits & Lighting Outlets (NEC 210.11, 210.52, 210.63 & 210.70)

6 Load Calculations (2026 NEC Article 120)

6.1 Article 120 Basics: Dwelling Lighting, Small-Appliance & Laundry Loads 6.2 Dwelling Standard Method: Appliances, Dryers, Ranges, Heating, EVSE & Neutral 6.3 Optional Methods: Single Dwelling, Existing Dwelling & Multifamily (2026 NEC 120.82–120.85) 6.4 Commercial Lighting, Receptacle, Sign & Show-Window Loads (Table 120.42(A) & 120.44) 6.5 Commercial Kitchens, Schools & Restaurants (2026 NEC 120.56, 120.86 & 120.88) 6.6 Farm Load Calculations (2026 NEC 120.102 & 120.103) 6.7 Feeder & Service Neutral Sizing (2026 NEC 120.61)

7 Feeders, Outside Wiring & Services

7.1 Feeder Design & Sizing Requirements (NEC Article 215) 7.2 Outside Feeders & Separate Buildings (Article 225 & 250.32) 7.3 Service Clearances, Overhead Drops & Underground Service Laterals 7.4 Service Equipment, Disconnecting Means, Surge Protection & GFPE (2026 NEC Article 230)

8 Overcurrent Protection

8.1 Overcurrent Protective Devices: Fuses, Breakers & Standard Ampere Ratings 8.2 Conductor Overcurrent Protection & Feeder Tap Rules (NEC 240.4 & 240.21) 8.3 OCPD Location, Breaker Voltage Ratings, Handle Ties & Arc Energy Reduction

9 System Grounding & Grounding Electrodes

9.1 Grounding vs. Bonding Principles & System Grounding (NEC Article 250 Parts I-II) 9.2 Grounding Electrode System: Permitted Electrodes & Installation (NEC 250.50 & 250.52) 9.3 Grounding Electrode Conductor (GEC) Sizing & Protection (NEC Table 250.66) 9.4 Main Bonding Jumper, System Bonding Jumper & Separately Derived Systems

10 Bonding & Equipment Grounding

10.1 Equipment Grounding Conductor (EGC) Types, Identification & Sizing (NEC Table 250.122) 10.2 Proportional Upsizing of EGC for Voltage Drop (NEC 250.122(B)) 10.3 Bonding of Interior Metal Piping, Structural Steel & Other Systems (NEC 250.104) 10.4 Bonding Methods, Equipment Requiring Grounding & Receptacle Grounding

11 General Wiring Methods & Underground Installations

11.1 General Wiring Methods & Mechanical Protection (NEC Article 300) 11.2 Underground Wiring Cover Requirements (NEC Table 300.7) 11.3 Securing & Supporting, Plenums, Firestopping & Raceway Installation (Article 300)

12 Raceways, Cables & Conduit Fill

12.1 Metal (RMC, IMC, EMT) & Nonmetallic (PVC, RTRC, LFNC) Raceways 12.2 Flexible Conduits, ENT, Wireways, Auxiliary Gutters & Surface Raceways 12.3 Busways & Cable Tray Systems (Articles 368 & 392) 12.4 Cable Assemblies (NM, UF, MC) & Minnesota Cold-Weather Installation Rules 12.5 Conduit & Tubing Fill Calculations (Chapter 9 & Annex C)

13 Boxes, Conduit Bodies & Cabinets

13.1 Box Installation, Support, Accessibility & Luminaire and Fan Boxes (Article 314) 13.2 Outlet, Switch & Junction Box Fill Calculations (NEC 314.16) 13.3 Pull and Junction Box Sizing for Conductors 4 AWG & Larger (NEC 314.28) 13.4 Cabinets, Cutout Boxes & Wire Bending Space (NEC Article 312)

14 Cords, Wiring Devices, Panelboards, Luminaires & Appliances

14.1 Flexible Cords, Flexible Cables & Fixture Wires (Articles 400 & 402) 14.2 Switches, Receptacles & Wiring Devices (Articles 404 & 406) 14.3 Panelboards, Switchboards & Switchgear (NEC Article 408) 14.4 Luminaires, Lampholders, Lighting Track & Low-Voltage Lighting (Articles 410 & 411) 14.5 Appliances, Fixed Electric Space Heating & Deicing Equipment (Articles 422, 424 & 426)

15 Motors, Controllers & Air Conditioning

15.1 Motor Full-Load Current Determination & Conductor Sizing (NEC 430.6 & 430.22) 15.2 Motor Branch-Circuit Short-Circuit & Ground-Fault Protection (NEC Table 430.52) 15.3 Motor Overload Protection & Feeder Calculations for Multiple Motors (NEC 430.32 & 430.24) 15.4 Motor Controllers, Disconnecting Means, Drives & Motor Control Centers (Article 430 Parts VII–XI) 15.5 Air Conditioning & Refrigeration Equipment (NEC Article 440)

16 Transformers, Generators & Equipment Over 1000 Volts

16.1 Transformer Overcurrent Protection & Sizing (NEC Article 450) 16.2 Generators & Transfer Switches (NEC Article 445) 16.3 Capacitors, Transformers Over 1000 V & Medium-Voltage Equipment (Articles 460, 450 & 495)

17 Hazardous (Classified) Locations

17.1 Hazardous (Classified) Locations: Classes, Divisions & Zones (NEC Articles 500-506) 17.2 Class I Locations: Wiring Methods & Conduit Seal-Offs (NEC Article 501) 17.3 Class II & Class III Locations and the Zone System (Articles 502, 503, 505 & 506) 17.4 Commercial Garages & Motor Fuel Dispensing Facilities (NEC Articles 511 & 514) 17.5 Spray Areas, Aircraft Hangars, Hazardous-Location Bonding & Intrinsic Safety (Articles 500, 504, 513 & 516)

18 Health Care, Assembly, Agricultural & Mobile Occupancies

18.1 Health Care Facilities: Patient Care Spaces & Redundant Grounding (NEC Article 517) 18.2 Places of Assembly, Carnivals & Fairs, and Temporary Installations (Articles 518, 525 & 590) 18.3 Agricultural Buildings, Equipotential Planes & Farm Distribution Points (Article 547) 18.4 Mobile & Manufactured Homes, RV Parks, and Marinas & Docks (Articles 550, 551 & 555)

19 Signs, Elevators, Pools, Solar & Other Specific Equipment

19.1 Signs & Outline Lighting, Office Partitions, IT Rooms & Irrigation Machines (Articles 600, 605, 645 & 675) 19.2 Elevators, Escalators & Platform Lifts (Article 620) 19.3 Swimming Pools, Spas & Water Features: Equipotential Bonding & GFCI (NEC Article 680) 19.4 Spas, Hot Tubs, Hydromassage Bathtubs, Fountains & Natural Bodies of Water (Article 680 Parts IV–VII & Article 682) 19.5 Solar Photovoltaic Systems (Article 690) 19.6 Small Wind Systems, Fire Pumps & Electric Vehicle Charging (Articles 694, 695 & 625)

20 Emergency, Standby & Interconnected Power Sources

20.1 Emergency Systems vs. Legally Required vs. Optional Standby (NEC Articles 700, 701, 702) 20.2 Interconnected Power Sources, Energy Storage & Power Control Systems (Articles 705, 706, 480 & 130)

21 Limited-Energy, Fire Alarm & Communications Systems

21.1 Remote-Control, Signaling & Power-Limited Circuits: Class 1, 2 & 3 (2026 Articles 206, 720–725) 21.2 Class 4 Fault-Managed Power, Tray Cables, Fire-Resistive Cable Systems & Limited-Energy Grounding (Articles 726, 727, 742, 750 & 772) 21.3 Fire Alarm Systems: NPLFA vs. PLFA Wiring & Overcurrent Protection (NEC Article 760) 21.4 Optical Fiber Cables & Communications Systems Entering Buildings (2026 Articles 720–723, 800, 810, 820)

19.5 Solar Photovoltaic Systems (Article 690)

Key Takeaways Explain This Topic AI

PV system DC circuit voltage may not exceed 600 V for one- and two-family dwellings or 1000 V for other buildings (690.7).

Maximum PV source circuit current is the sum of the parallel module short-circuit currents multiplied by 125% (690.8(A)).

PV circuit conductors must have an ampacity of at least 125% of the maximum circuit current before adjustment and correction factors, or the maximum current after them, whichever is larger (690.8(B)).

Rapid shutdown must reduce controlled conductors outside the array boundary to 30 V or less within 30 seconds of initiation (690.12).

PV DC circuits of 80 V or more on or in buildings need a listed PV arc-fault circuit interrupter or equivalent protection (690.11).

Last updated: October 2026

Why PV is tested

DLI's knowledge areas include solar photovoltaic systems: disconnecting means; wiring methods . Minnesota's cold winters make the voltage correction a common exam calculation, because module voltage rises as temperature drops.

Maximum voltage (690.7)

  • Building Maximum PV system DC circuit voltage
  • One- and two-family dwellings 600 V
  • Other buildings 1000 V
  • Not on or in buildings (ground-mounted arrays) Up to 1500 V where permitted

The maximum PV source circuit voltage is the sum of the series-connected modules' open-circuit voltage (Voc) , corrected for the lowest expected ambient temperature . Use the module manufacturer's temperature coefficient of Voc when available, or the correction factors in Table 690.7(A) for crystalline and multicrystalline silicon modules. For systems of any size, a licensed professional engineer may also calculate the voltage using an industry standard method; the 2026 NEC removed the former 100 kW threshold for that option and clarified that 690.7(A) applies to dc voltages.

Minnesota example: each module has a Voc of 49.5 V at 25°C and a temperature coefficient of −0.28%/°C. The lowest expected ambient temperature at the site is −30°C, a difference of 55°C.

Correction: 1 + 0.0028 × 55 = 1.154 1 + 0.0028 \times 55 = 1.154 1 + 0.0028 × 55 = 1.154 .

Corrected Voc per module: 49.5 × 1.154 = 57.1 49.5 \times 1.154 = 57.1 49.5 × 1.154 = 57.1 V.

A string of 12 modules: 12 × 57.1 = 685 12 \times 57.1 = 685 12 × 57.1 = 685 V, which exceeds 600 V for a one-family dwelling.

A string of 10 modules: 10 × 57.1 = 571 10 \times 57.1 = 571 10 × 57.1 = 571 V, which is acceptable.

Current and conductor sizing (690.8)

Step Rule

Maximum current, PV source circuit (690.8(A)(1)) Sum of the parallel module rated short-circuit currents (Isc) × 125%

Maximum current, inverter output circuit The inverter's continuous output current rating

Conductor ampacity (690.8(B)) The larger of 125% of the maximum current before adjustment and correction factors, or the maximum current after applying them

Overcurrent protection (690.9) OCPDs rated at least 125% of the maximum current; source circuit OCPDs are not required where there are not more than two strings in parallel and the module ratings permit

Example: a string with modules rated Isc = 11 A. Maximum current = 11 × 1.25 = 13.75 = 11 \times 1.25 = 13.75 = 11 × 1.25 = 13.75 A. Minimum conductor ampacity before adjustment = 13.75 × 1.25 = 17.2 = 13.75 \times 1.25 = 17.2 = 13.75 × 1.25 = 17.2 A, so 125% is applied twice to the Isc (156%).

Arc-fault protection (690.11)

PV systems with DC circuits operating at 80 V or greater between any two conductors, on or penetrating a building, must be protected by a listed PV arc-fault circuit interrupter or other component listed to provide equivalent protection, to detect and interrupt arcing faults in the DC circuits.

Rapid shutdown (690.12)

PV system circuits installed on or in buildings must include a rapid shutdown function to reduce shock hazard for firefighters.

Location Limit after rapid shutdown is initiated

Outside the array boundary (more than 1 ft from the array) Controlled conductors 30 V or less within 30 seconds

Inside the array boundary 80 V or less within 30 seconds, or a listed PV hazard control system, or no exposed wiring or conductive parts within 8 ft of exposed grounded parts

Initiation device For one- and two-family dwellings, at a readily accessible location outside the building; the service disconnect, PV system disconnect, or a dedicated switch can serve

Labels Buildings with rapid shutdown must have a permanent label at each service equipment location identifying the rapid shutdown type and the switch location

Disconnecting means (690.13 and 690.15)

PV system disconnecting means (690.13): must disconnect the PV system from all other systems, be installed at a readily accessible location, be permanently marked "PV SYSTEM DISCONNECT" or equivalent, and indicate whether open or closed. Where line and load terminals may both be energized in the open position, it must carry a warning label. The PV system may have up to six disconnecting switches or circuit breakers for each system.

Equipment disconnecting means (690.15): isolating devices or equipment disconnects for inverters, charge controllers, and similar equipment must be within the equipment , or within sight and within 10 ft of it, or have a lockable or remotely operated means as permitted.

Service marking (230.70, 2026): where the PV disconnect is not located at the service disconnect, a plaque or directory at the service disconnect must show its location.

Wiring methods (690.31)

Exposed in the array: single-conductor PV wire or USE-2 cable may be used exposed outdoors within the array, protected from physical damage and supported.

Inside buildings: where DC circuits of a PV system run inside a building and exceed 30 V or 8 A , they must be in metal raceways, Type MC cable with a metal sheath, or metal enclosures , from the point of penetration of the building surface to the first readily accessible disconnecting means.

Markings: raceways, cable trays, and enclosures containing PV DC circuits must be marked "PHOTOVOLTAIC POWER SOURCE" or "SOLAR PV DC CIRCUIT" at intervals not exceeding 10 ft , and on each section separated by walls or barriers.

Identification: PV DC conductors are identified by polarity at all termination, connection, and splice points, and only a solidly grounded conductor may be white or gray.

Grounding (690.41 to 690.47)

Most modern PV arrays are functionally grounded through the inverter rather than solidly grounded.

Equipment grounding (690.43): exposed metal parts, module frames, and racking must be connected to an EGC, using devices listed for bonding module frames where used. EGCs for PV circuits are sized from Table 250.122 using the OCPD rating; where no OCPD is used, an assumed OCPD rated per 690.9(B) is used (690.45).

Grounding electrode (690.47): a building with PV must have a grounding electrode system per Article 250; the 2026 NEC removed the former Article 250 wording about additional array electrodes from 690.47(B).

Interconnection

Connecting the PV inverter output to the premises wiring is covered by Article 705 : supply-side connections and load-side connections, including the 120% busbar rule. Section 20.2 of this guide covers those rules.