Study guide
1.3 Regulations Under OSHA 1994 That a Site Safety Supervisor Applies
NIOSH Site Safety Supervisor SSS
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: The SSS Role & Malaysian OSH Legislation
1.1 The Site Safety Supervisor: Legal Appointment, DOSH Registration & Core Duties 1.2 OSHA 1994 as Amended by Act A1648: Structure, Duties, Rights & Penalties 1.3 Regulations Under OSHA 1994 That a Site Safety Supervisor Applies 1.4 CDM Regulations 2024: Duty Holders, Notification, Plans and Site Requirements
2 Chapter 2: OSH Management Systems, Human Factors & Risk Management
2.1 OSH Management Systems: Planning, OSH Policy, Site Organisation & Safety Committees 2.2 Human and Behavioural Factors in Construction Safety 2.3 HIRARC and the General Principles of Prevention 2.4 Safe Work Procedures and Permit-to-Work Systems 2.5 Monitoring, Accident Investigation, NADOPOD Reporting, Record Keeping & Audit
3 Chapter 3: Site Planning, General Control, Welfare & Communication
3.1 Site Initial Planning, Hoarding, Access and Vehicle & Plant Movement 3.2 General Control and Welfare: Housekeeping, Storage, Site Security, Welfare Facilities and First Aid 3.3 Safety Communication: Site Induction, Toolbox Meetings, Signs and Safety Promotion
4 Chapter 4: Working at Height & Fall Protection
4.1 Working at Height: Legal Basis, Fall Physics and the Fall-Control Hierarchy 4.2 Collective Fall Protection: Guardrails, Floor Openings, Nets and Catch Platforms 4.3 Personal Fall Protection, Ladders, MEWPs and Rescue from Height
5 Chapter 5: Scaffolding: Components, Design, Erection & Inspection
5.1 Scaffolding Types, Components, Foundations, Bracing and Tower Scaffolds 5.2 Scaffold Design, Loading, Competent Scaffolders and Safe Erection & Dismantling 5.3 Scaffold Inspection, Tagging Systems and Records
6 Chapter 6: Excavation, Shoring & Underground Services
6.1 Excavation Hazards, Soil Behaviour and Pre-Excavation Investigation 6.2 Protecting Excavation Sides: Battering, Benching, Shoring and Trench Support Systems 6.3 Deep Excavations, Retaining Systems, Cofferdams & Caissons, Monitoring and Rescue 6.4 Excavation Access, Edge Protection, Inspection Reports, Underground Services, Water and Air
7 Chapter 7: Piling, Formwork & Falsework, Concrete Work & Demolition
7.1 Piling Operations: Rigs, Working Platforms, Driven and Bored Piles 7.2 Formwork and Falsework: Temporary Works Design, Erection, Inspection and Loading 7.3 Concrete Work: Pre-Pour Checks, Pumping and Placing, Cement Health Hazards and Striking 7.4 Demolition and Dismantling: Surveys, Written Arrangements, Methods, Debris and Asbestos
8 Chapter 8: Lifting Operations, Work Equipment & Mobile Plant
8.1 Cranes and Hoists: Certificates of Fitness, Competent Operators, Ground and Crane Safety 8.2 Lifting Tackle and Rigging: Slings, Shackles, Hooks, Inspection and Discard 8.3 Lift Planning, Load Charts, Sling Angles and Crane Signalling 8.4 Work Equipment and Mobile Plant: Earthmoving Machines, Hand and Power Tools, Compressors and Guarding
9 Chapter 9: Electrical Safety, Fire & Hot Work, and Confined Spaces
9.1 Electrical Safety on Construction Sites: Temporary Supply, RCDs, Competent Persons and Safe Isolation 9.2 Fire Safety, Emergency Arrangements, Hot Work and Welding 9.3 Confined Spaces: The 2010 ICOP, Hazardous Atmospheres, Roles, Permits and Rescue
10 Chapter 10: Occupational Health Hazards & Controls
10.1 Physical Hazards: Noise, Vibration, Heat Stress, Radiation and Lighting 10.2 Musculoskeletal Hazards: Manual Handling and Ergonomics on Construction Sites 10.3 Chemical and Biological Hazards: USECHH, CLASS, Silica, Asbestos, Lead and Site Infections 10.4 Psychological Health: Psychosocial Hazards, Stress, Fatigue, Violence and Substance Misuse 10.5 Personal Protective Equipment and Site Emergency Response
11 Chapter 11: The SSS Examination: Paper 1, Site Assessment & Presentation
11.1 The SSS Examination: Entry Rules, Format, Retakes and Paper 1 Technique 11.2 Paper 2: Site Visit Practice, the Site Assessment and the Online HIRARC Presentation
1.3 Regulations Under OSHA 1994 That a Site Safety Supervisor Applies
Key Takeaways Explain This Topic AI
DOSH currently lists twelve regulations under OSHA 1994, including NADOPOD 2004, USECHH 2000, CLASS 2013, the Noise Exposure Regulations 2019, CDM 2024 and the Plant Requiring Certificate of Fitness Regulations 2024.
The BOWEC Regulations 1986, the FM (Safety, Health and Welfare) Regulations 1970 and the FM (Noise Exposure) Regulations 1989 are on DOSH's list of repealed regulations and cannot be cited as current law.
Under the Noise Exposure Regulations 2019 the exposure limit is a daily noise exposure of 85 dB(A), a maximum sound pressure level of 115 dB(A) or a peak of 140 dB(C).
Under the Plant Requiring Certificate of Fitness Regulations 2024 a certificate of fitness for a steam boiler, pressure vessel or lifting machinery is valid for 15 months from inspection.
Under section 37 of OSHA 1994 the Minister may approve industry codes of practice, such as the confined space ICOP 2010, and under section 38 they can be used as evidence in proceedings.
Last updated: October 2026
Why the regulations matter
NIOSH Part 2(C), Regulations under OSHA , is one of the four legislation topics in the SSS course, with about three hours of teaching. In the exam, structured questions often give a site situation and ask which regulation applies and what it requires. A DOSH officer will also judge a site against these regulations, not against general good intentions.
OSHA 1994 contains the duties. Section 66 lets the Minister make regulations, section 37 lets the Minister approve industry codes of practice (ICOPs) , and section 38 allows ICOPs to be used in proceedings: a failure to follow a relevant code can be used as evidence of a breach. DOSH guidelines have no legal force of their own, but they show what DOSH considers practicable.
The current regulations under OSHA 1994
DOSH's list of regulations under Act 514, checked in October 2026:
Regulation Main point for a construction SSS
Employers' Safety and Health General Policy Statements (Exception) Regulations 1995 The section 16 written policy duty does not apply to an undertaking with not more than five employees
Control of Industrial Major Accident Hazards (CIMAH) Regulations 1996 Major hazard installations; relevant if you build inside an operating plant
Safety and Health Committee Regulations 1996 Committee composition, meetings, inspections and records (Section 2.1)
Safety and Health Officer Regulations 1997 SHO registration and duties; the SHO reports monthly and acts as committee secretary
Use and Standards of Exposure of Chemicals Hazardous to Health (USECHH) Regulations 2000 Chemical register, chemical health risk assessment, exposure limits, monitoring, health surveillance
Notification of Accident, Dangerous Occurrence, Occupational Poisoning and Occupational Disease (NADOPOD) Regulations 2004 What must be reported to DOSH, how fast, and records
Classification, Labelling and Safety Data Sheet of Hazardous Chemicals (CLASS) Regulations 2013 GHS labels and 16-section safety data sheets from suppliers
Noise Exposure Regulations 2019 Noise risk assessment, exposure limits, hearing protection zones, audiometry
Fee for Registration of Competent Person and Registered Training Provider Regulations 2024 RM50 processing and RM200 registration fees for an individual competent person
Construction Work (Design and Management) (CDM) Regulations 2024 Construction duty holders and site rules; regulation 39 requires the SSS (Section 1.4)
Plant Requiring Certificate of Fitness Regulations 2024 Steam boilers, pressure vessels and lifting machinery; 15-month certificates of fitness
Special Scheme of Inspection Regulations 2025 Approved alternative inspection schemes for certified plant
DOSH also lists orders under OSHA, including the Licensed Persons Order 2024 (P.U.(A) 100/2024), which licenses third parties to inspect certified plant, and the Prohibition of Use of Substance Order 1999 . The Safety and Health Officer Order 1997 (made under section 29(1)) is the order that lists which industries must employ an SHO.
Repealed on 1 June 2024
DOSH's page of repealed regulations includes the FM (Building Operations and Works of Engineering Construction) (Safety) Regulations 1986 (BOWEC), FM (Safety, Health and Welfare) Regulations 1970, FM (Guarding of Machinery and Safety) Regulations 1970, FM (Electric Lifts for Passengers and Goods) Regulations 1970, FM (Notification, Certificate of Fitness and Inspection) Regulations 1970, FM (Asbestos Process) Regulations 1986, FM (Mineral Dust) Regulations 1989 and FM (Noise Exposure) Regulations 1989. The Chief Inspector's Special Orders on tower cranes (2017), temporary structures (No. 1 of 2020) and mobile cranes (No. 2 of 2020) were also revoked with the FMA.
Warning
Exam distractors often quote BOWEC regulation numbers or the 1989 noise limits as though they were current. Treat them as historical unless the question specifically asks about the former law.
- The regulations an SSS uses every week
- NADOPOD 2004: reporting accidents and dangerous occurrences
Death, serious bodily injury or dangerous occurrence: the employer must notify the nearest DOSH office immediately by the quickest means available , then send a report in the approved form within 7 days (regulation 5(1)).
Lost-time injury: any accident that keeps a person from normal work for more than four calendar days must be reported within 7 days (regulation 5(2)).
Death within one year of a reportable accident: notify the Director General in writing (regulation 5(3)).
Occupational poisoning or disease in the Third Schedule: the employer reports within 7 days, and so does the doctor (regulation 7).
The scene must not be disturbed after a fatal or serious incident except to save life or relieve suffering, maintain public access to an essential service, or prevent further serious damage (regulation 9).
Register: keep it for at least 5 years and send DOSH an annual extract before 31 January (regulation 10).
Penalty: up to RM10,000 or one year or both (regulation 13).
Construction-relevant dangerous occurrences in Part I of the Second Schedule include:
the collapse of a scaffold more than 5 metres high
the collapse of any part of a building or structure under construction or demolition, or of any temporary support
- the collapse, overturning or failure of a load-bearing part of a crane, hoist, piling frame, excavator or lift
- USECHH 2000: chemicals hazardous to health
Keep a register of chemicals hazardous to health (regulation 5).
Have a chemical health risk assessment carried out by a registered assessor (regulations 9 and 11). Review it after a significant change, after five years , or when DOSH directs (regulation 10).
Act on the assessment report within one month (regulation 14).
Apply controls in this order (regulation 15): elimination, substitution, total enclosure, isolation, process modification, engineering control equipment, safe work systems, and approved PPE last.
Inspect engineering control equipment such as local exhaust ventilation at least monthly , and have a hygiene technician examine and test it at least every 12 months (regulation 17).
Keep personal exposure monitoring records 30 years and health surveillance records 30 years (regulations 26 and 27).
Post warning signs in Bahasa Malaysia and English , dark red on white (regulation 29).
CLASS 2013: labels and safety data sheets
Suppliers must label hazardous chemicals with the product identifier, supplier identification, signal word, hazard statement, pictogram and precautionary statement. Labels must be in the national language and English (regulation 8). Suppliers must also provide a 16-heading safety data sheet , revised at least every five years (regulation 13). On site, the SSS checks that every container in use has a label and that the safety data sheet is available where the chemical is used.
Noise Exposure Regulations 2019
Excessive noise means a daily exposure above 82 dB(A) , a maximum level above 115 dB(A) or a peak above 140 dB(C). It triggers a noise risk assessment by a DOSH-registered assessor.
Exposure limit: 85 dB(A) daily (or a 100% dose), 115 dB(A) maximum and 140 dB(C) peak.
Controls: engineering first, then engineering plus administrative, then administrative alone, then other measures including approved hearing protectors.
Hearing protection zones must be marked, and exposed workers need annual audiometric testing .
Chapter 10 applies this to piling, breaking and cutting.
Plant Requiring Certificate of Fitness Regulations 2024
The regulations cover steam boilers, pressure vessels and lifting machinery , including tower cranes, mobile cranes, passenger and material hoists, and suspended access equipment (gondolas).
A certificate of fitness issued after inspection by a DOSH officer or licensed person is valid for 15 months .
Tower cranes, passenger hoists and suspended access equipment need a comprehensive examination at least every three months by a competent person, or more often if the manufacturer requires.
Tower cranes and mobile cranes may be operated only by a competent crane operator working to a lifting plan based on a risk assessment (regulation 15). Chapter 8 covers this.
Industry codes of practice and guidelines you will meet
Instrument Status Typical exam content
ICOP for Safe Working in a Confined Space 2010 Approved code under section 37 Hazardous atmosphere limits, roles, permit to work
ICOP on Chemicals Classification and Hazard Communication Approved code (supports CLASS) Classification and labelling
Guidelines for HIRARC 2008 DOSH guideline Risk matrix and hierarchy of control
Guidelines for the Prevention of Falls at Workplaces 2007 DOSH guideline Fall protection from 2 m, guardrails, ladders, harnesses
Guidelines for Public Safety and Health at Construction Sites 2007 DOSH guideline Hoarding, gantries, traffic near public roads
Guidelines on First-Aid in the Workplace 2004 DOSH guideline First-aider numbers; first-aid room above 150 workers
- OSHCIM Guidelines 2017 DOSH guideline that CDM 2024 put into law Duty holders in design and construction
- Scenario: choosing the right regulation
A crawler crane's boom collapses onto an empty laydown area on Sunday. Nobody is hurt.
Under NADOPOD Second Schedule Part I item 11 , the failure of a load-bearing part of a crane is a dangerous occurrence .
The employer must notify DOSH immediately and submit the written report within 7 days.
The scene stays undisturbed under regulation 9 unless one of its exceptions applies.
The crane cannot be used again until its condition and its certificate of fitness status under the Plant Requiring Certificate of Fitness Regulations 2024 have been dealt with.