6.3 Deep Excavations, Retaining Systems, Cofferdams & Caissons, Monitoring and Rescue

NIOSH Site Safety Supervisor SSS

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: The SSS Role & Malaysian OSH Legislation

1.1 The Site Safety Supervisor: Legal Appointment, DOSH Registration & Core Duties 1.2 OSHA 1994 as Amended by Act A1648: Structure, Duties, Rights & Penalties 1.3 Regulations Under OSHA 1994 That a Site Safety Supervisor Applies 1.4 CDM Regulations 2024: Duty Holders, Notification, Plans and Site Requirements

2 Chapter 2: OSH Management Systems, Human Factors & Risk Management

2.1 OSH Management Systems: Planning, OSH Policy, Site Organisation & Safety Committees 2.2 Human and Behavioural Factors in Construction Safety 2.3 HIRARC and the General Principles of Prevention 2.4 Safe Work Procedures and Permit-to-Work Systems 2.5 Monitoring, Accident Investigation, NADOPOD Reporting, Record Keeping & Audit

3 Chapter 3: Site Planning, General Control, Welfare & Communication

3.1 Site Initial Planning, Hoarding, Access and Vehicle & Plant Movement 3.2 General Control and Welfare: Housekeeping, Storage, Site Security, Welfare Facilities and First Aid 3.3 Safety Communication: Site Induction, Toolbox Meetings, Signs and Safety Promotion

4 Chapter 4: Working at Height & Fall Protection

4.1 Working at Height: Legal Basis, Fall Physics and the Fall-Control Hierarchy 4.2 Collective Fall Protection: Guardrails, Floor Openings, Nets and Catch Platforms 4.3 Personal Fall Protection, Ladders, MEWPs and Rescue from Height

5 Chapter 5: Scaffolding: Components, Design, Erection & Inspection

5.1 Scaffolding Types, Components, Foundations, Bracing and Tower Scaffolds 5.2 Scaffold Design, Loading, Competent Scaffolders and Safe Erection & Dismantling 5.3 Scaffold Inspection, Tagging Systems and Records

6 Chapter 6: Excavation, Shoring & Underground Services

6.1 Excavation Hazards, Soil Behaviour and Pre-Excavation Investigation 6.2 Protecting Excavation Sides: Battering, Benching, Shoring and Trench Support Systems 6.3 Deep Excavations, Retaining Systems, Cofferdams & Caissons, Monitoring and Rescue 6.4 Excavation Access, Edge Protection, Inspection Reports, Underground Services, Water and Air

7 Chapter 7: Piling, Formwork & Falsework, Concrete Work & Demolition

7.1 Piling Operations: Rigs, Working Platforms, Driven and Bored Piles 7.2 Formwork and Falsework: Temporary Works Design, Erection, Inspection and Loading 7.3 Concrete Work: Pre-Pour Checks, Pumping and Placing, Cement Health Hazards and Striking 7.4 Demolition and Dismantling: Surveys, Written Arrangements, Methods, Debris and Asbestos

8 Chapter 8: Lifting Operations, Work Equipment & Mobile Plant

8.1 Cranes and Hoists: Certificates of Fitness, Competent Operators, Ground and Crane Safety 8.2 Lifting Tackle and Rigging: Slings, Shackles, Hooks, Inspection and Discard 8.3 Lift Planning, Load Charts, Sling Angles and Crane Signalling 8.4 Work Equipment and Mobile Plant: Earthmoving Machines, Hand and Power Tools, Compressors and Guarding

9 Chapter 9: Electrical Safety, Fire & Hot Work, and Confined Spaces

9.1 Electrical Safety on Construction Sites: Temporary Supply, RCDs, Competent Persons and Safe Isolation 9.2 Fire Safety, Emergency Arrangements, Hot Work and Welding 9.3 Confined Spaces: The 2010 ICOP, Hazardous Atmospheres, Roles, Permits and Rescue

10 Chapter 10: Occupational Health Hazards & Controls

10.1 Physical Hazards: Noise, Vibration, Heat Stress, Radiation and Lighting 10.2 Musculoskeletal Hazards: Manual Handling and Ergonomics on Construction Sites 10.3 Chemical and Biological Hazards: USECHH, CLASS, Silica, Asbestos, Lead and Site Infections 10.4 Psychological Health: Psychosocial Hazards, Stress, Fatigue, Violence and Substance Misuse 10.5 Personal Protective Equipment and Site Emergency Response

11 Chapter 11: The SSS Examination: Paper 1, Site Assessment & Presentation

11.1 The SSS Examination: Entry Rules, Format, Retakes and Paper 1 Technique 11.2 Paper 2: Site Visit Practice, the Site Assessment and the Online HIRARC Presentation

6.3 Deep Excavations, Retaining Systems, Cofferdams & Caissons, Monitoring and Rescue

Key Takeaways Explain This Topic AI

DOSH's excavation bulletin, following the former BOWEC regulation 116, says protection for a trench, cofferdam, caisson or tunnel deeper than 4 metres should be built to the design and drawings of a Professional Engineer.

CDM 2024 regulation 25 requires cofferdams and caissons to be of suitable design and construction, equipped so workers can shelter or escape if water or material enters, properly maintained, and inspected by a designated person at the start of every shift and after any event affecting stability.

Work in a caisson with a compressed-air atmosphere, and work in wells, underground earthworks and tunnels, is listed as work involving particular risks in the Fourth Schedule of CDM 2024.

DOSH's excavation bulletin says people working in a trench, cofferdam, caisson or tunnel should never work alone, and another person should be in the immediate vicinity at all times.

After a collapse, rescuers must never enter an unsupported excavation: stop nearby plant and vibration, call emergency services, and rescue only under protection.

Last updated: October 2026

When excavations become engineered structures

Every excavation needs measures that prevent collapse (CDM regulation 24). Above a certain depth, or near structures, those measures must be designed by an engineer:

Depth. DOSH's 2015 excavation bulletin (paragraph 68), restating the former BOWEC regulation 116, says that where a trench, cofferdam, caisson or tunnel exceeds 4 m in depth , its protection shall be built to the design and drawings of a Professional Engineer . BOWEC is repealed, but this remains DOSH's published guidance and is a sound trigger. CDM regulation 21(2) requires all temporary supports to be designed for foreseeable loads.

Adjoining structures. Where the stability of nearby buildings or services is in question, support them by underpinning, sheet piling, shoring or bracing to a Professional Engineer's design (bulletin paragraph 26).

Designers' duties. Under CDM regulations 11 and 12, the designers and principal designer must use the site investigation to eliminate or reduce excavation risks at the design stage, for example by choosing a retaining system that can be installed without people entering unsupported ground.

The Professional Engineer must be registered with the Board of Engineers Malaysia. The design pack (drawings, calculations, installation sequence, monitoring plan and trigger levels) is kept on site, and the excavation must be built to it.

Common earth-retaining systems

System Description Key hazards and controls

Steel sheet piles Interlocking steel sections driven or vibrated into the ground, propped or anchored Noise and vibration; pile pitching and lifting; declutching at the interlocks lets in water and soil

Contiguous bored piles A row of bored piles with small gaps, usually with a capping beam Gaps leak water and fines, so a cut-off is needed; open bores during construction

Secant piles Overlapping bored piles forming a watertight wall Rig stability; open bores; precise sequence

Diaphragm walls Panels excavated under bentonite slurry, then concreted Slurry spills and slips; large rigs; open trench panels

Soldier piles and lagging Steel piles with timber or precast infill placed as digging proceeds Exposed face while lagging is fitted; limited to suitable soils

Ground anchors Tendons grouted into the ground behind the wall Drilling under neighbouring land (permissions); stressing hazards; anchors must not be cut

Internal struts and walers Steel props across the excavation Struck by excavators; never remove or alter a strut without the engineer's approval

Other hazards of deep basements:

  • base heave or boiling when the excavation is below the water table
  • dewatering that causes settlement of neighbouring property
  • falls into the excavation from its edges
  • falls from the strut levels
  • tremie and slurry work
  • poor air in deep, confined corners (Section 6.4)
  • Cofferdams and caissons: CDM 2024 regulation 25

A cofferdam is a temporary enclosure that keeps water or soil out so work can be done inside, for example a bridge pier in a river. A caisson is defined in CDM 2024 as a structure sunk through ground or water to excavate and place work at a set depth, which then becomes part of the permanent works.

Regulation 25 requires every cofferdam or caisson:

  • to be of suitable design and construction
  • to be appropriately equipped so workers can shelter or escape if water or materials enter
  • to be properly maintained

not to be used for construction work unless a designated person has inspected it, and any plant and materials affecting its safety:

  • at the start of every shift
  • after any event likely to affect its strength or stability
  • not to be used unless the designated person is satisfied that the work can be done safely

If the designated person is not satisfied, work does not proceed until the matter is put right. Inspection reports follow regulation 26 (Section 6.4).

The CDM Fourth Schedule lists, as work involving particular risks:

  • work in wells, underground earthworks and tunnels
  • work by divers with an air supply system
  • work in caissons with a compressed-air atmosphere
  • work exposing workers to drowning

The construction phase plan must contain specific measures for each of these.

DOSH's bulletin also advises:

Never work alone in a trench, cofferdam, caisson or tunnel. Another person should be in the immediate vicinity at all times, and remote work needs a phone or two-way radio (paragraph 67).

Treat the confines of deep trenches, cofferdams, caissons and tunnels as possible confined spaces , and apply the confined space ICOP where its definition is met (paragraph 71).

Control dust and gases by ventilation so they do not injure health, obstruct vision or exceed safe levels (paragraph 72).

Monitoring deep excavations

Engineers specify instruments to warn of movement before failure. The SSS should know what they are and what the readings mean:

  • Instrument Measures
  • Inclinometer Lateral movement of the retaining wall or soil with depth
  • Settlement markers Vertical movement of the ground, roads and buildings nearby
  • Tilt meters Rotation of adjacent buildings and walls
  • Piezometers and standpipes Groundwater pressure and level
  • Strain gauges or load cells on struts Forces in props and anchors
  • Crack gauges Opening of existing cracks in neighbouring buildings

Monitoring plans usually set three trigger levels . The names vary, but a common scheme is:

  • Level Typical meaning Typical action
  • Alert Movement approaching expectations Increase monitoring frequency; inform the engineer

Action Movement beyond design expectations Engineer reviews; implement prepared contingency measures; restrict activities

Alarm Movement indicating possible failure Stop work in the affected area; evacuate if necessary; emergency measures

Readings are useful only if they are taken on schedule, reviewed promptly and acted upon. The SSS should check that monitoring is on the inspection checklist and that the contingency actions are in the method statement.

Emergencies and rescue

A trench collapse is a time-critical emergency, and rescuers often become victims. A site's emergency arrangements must cover excavations (CDM regulation 32):

Raise the alarm and call emergency services (999). Give the exact location and say it is a trench collapse.

Stop nearby plant, piling and traffic to reduce vibration and further collapse, and keep vehicles and spoil away from the edges.

Do not enter an unsupported trench. Rescue only from protected positions: trench boxes, hastily installed support, or from the surface.

Locate the casualty. Uncover the head and chest first to allow breathing, using hands and hand tools, not machines.

Prepare for first aid for crush injury and suffocation. Hand over to the Fire and Rescue Department on arrival.

Preserve the scene and notify DOSH. A death or serious injury must be notified immediately under NADOPOD regulation 5. Collapse of a temporary support in a structure under construction is also a listed dangerous occurrence.

Scenario: a three-level basement beside an LRT line

A contractor plans a 12 m deep basement using secant piles and two levels of steel struts, next to an elevated rail line and a row of shops. The SSS's review:

Design: confirm a Professional Engineer's design, approved by the relevant authorities, with the installation and excavation sequence, the strut installation levels and the monitoring plan with trigger values.

Construction phase plan: specific measures for the particular risks (burial, falls from height into the excavation, work near the rail operator's assets).

Daily controls:

a designated person inspects at every shift start and after rain

the excavator is not allowed to dig more than the specified depth below a strut level before the struts are installed

  • strut-impact protection
  • edge protection and access stairs

Monitoring: readings reviewed daily by the engineer, with alarm-level actions briefed to supervisors.

Emergency: a rescue plan and an evacuation route from each basement level, tested in a drill (CDM regulation 32(3)).