Study guide

8.1 Cranes and Hoists: Certificates of Fitness, Competent Operators, Ground and Crane Safety

NIOSH Site Safety Supervisor SSS

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: The SSS Role & Malaysian OSH Legislation

1.1 The Site Safety Supervisor: Legal Appointment, DOSH Registration & Core Duties 1.2 OSHA 1994 as Amended by Act A1648: Structure, Duties, Rights & Penalties 1.3 Regulations Under OSHA 1994 That a Site Safety Supervisor Applies 1.4 CDM Regulations 2024: Duty Holders, Notification, Plans and Site Requirements

2 Chapter 2: OSH Management Systems, Human Factors & Risk Management

2.1 OSH Management Systems: Planning, OSH Policy, Site Organisation & Safety Committees 2.2 Human and Behavioural Factors in Construction Safety 2.3 HIRARC and the General Principles of Prevention 2.4 Safe Work Procedures and Permit-to-Work Systems 2.5 Monitoring, Accident Investigation, NADOPOD Reporting, Record Keeping & Audit

3 Chapter 3: Site Planning, General Control, Welfare & Communication

3.1 Site Initial Planning, Hoarding, Access and Vehicle & Plant Movement 3.2 General Control and Welfare: Housekeeping, Storage, Site Security, Welfare Facilities and First Aid 3.3 Safety Communication: Site Induction, Toolbox Meetings, Signs and Safety Promotion

4 Chapter 4: Working at Height & Fall Protection

4.1 Working at Height: Legal Basis, Fall Physics and the Fall-Control Hierarchy 4.2 Collective Fall Protection: Guardrails, Floor Openings, Nets and Catch Platforms 4.3 Personal Fall Protection, Ladders, MEWPs and Rescue from Height

5 Chapter 5: Scaffolding: Components, Design, Erection & Inspection

5.1 Scaffolding Types, Components, Foundations, Bracing and Tower Scaffolds 5.2 Scaffold Design, Loading, Competent Scaffolders and Safe Erection & Dismantling 5.3 Scaffold Inspection, Tagging Systems and Records

6 Chapter 6: Excavation, Shoring & Underground Services

6.1 Excavation Hazards, Soil Behaviour and Pre-Excavation Investigation 6.2 Protecting Excavation Sides: Battering, Benching, Shoring and Trench Support Systems 6.3 Deep Excavations, Retaining Systems, Cofferdams & Caissons, Monitoring and Rescue 6.4 Excavation Access, Edge Protection, Inspection Reports, Underground Services, Water and Air

7 Chapter 7: Piling, Formwork & Falsework, Concrete Work & Demolition

7.1 Piling Operations: Rigs, Working Platforms, Driven and Bored Piles 7.2 Formwork and Falsework: Temporary Works Design, Erection, Inspection and Loading 7.3 Concrete Work: Pre-Pour Checks, Pumping and Placing, Cement Health Hazards and Striking 7.4 Demolition and Dismantling: Surveys, Written Arrangements, Methods, Debris and Asbestos

8 Chapter 8: Lifting Operations, Work Equipment & Mobile Plant

8.1 Cranes and Hoists: Certificates of Fitness, Competent Operators, Ground and Crane Safety 8.2 Lifting Tackle and Rigging: Slings, Shackles, Hooks, Inspection and Discard 8.3 Lift Planning, Load Charts, Sling Angles and Crane Signalling 8.4 Work Equipment and Mobile Plant: Earthmoving Machines, Hand and Power Tools, Compressors and Guarding

9 Chapter 9: Electrical Safety, Fire & Hot Work, and Confined Spaces

9.1 Electrical Safety on Construction Sites: Temporary Supply, RCDs, Competent Persons and Safe Isolation 9.2 Fire Safety, Emergency Arrangements, Hot Work and Welding 9.3 Confined Spaces: The 2010 ICOP, Hazardous Atmospheres, Roles, Permits and Rescue

10 Chapter 10: Occupational Health Hazards & Controls

10.1 Physical Hazards: Noise, Vibration, Heat Stress, Radiation and Lighting 10.2 Musculoskeletal Hazards: Manual Handling and Ergonomics on Construction Sites 10.3 Chemical and Biological Hazards: USECHH, CLASS, Silica, Asbestos, Lead and Site Infections 10.4 Psychological Health: Psychosocial Hazards, Stress, Fatigue, Violence and Substance Misuse 10.5 Personal Protective Equipment and Site Emergency Response

11 Chapter 11: The SSS Examination: Paper 1, Site Assessment & Presentation

11.1 The SSS Examination: Entry Rules, Format, Retakes and Paper 1 Technique 11.2 Paper 2: Site Visit Practice, the Site Assessment and the Online HIRARC Presentation

8.1 Cranes and Hoists: Certificates of Fitness, Competent Operators, Ground and Crane Safety

Key Takeaways Explain This Topic AI

The Plant Requiring Certificate of Fitness Regulations 2024 cover steam boilers, pressure vessels and lifting machinery, and a certificate of fitness is valid for 15 months from the date of inspection.

Regulation 15 of the 2024 Regulations requires every tower crane and mobile crane to be operated only by a competent person who is a crane operator, and the owner or occupier to establish a lifting plan based on the risk assessment.

Before lifting, the crane operator must test all limit switches and indicator devices without load and record the results in the logbook before each work shift (regulation 15(3)(b)).

Tower cranes, passenger hoists and suspended access equipment need a comprehensive examination by a competent person at least every three months, or more often if the manufacturer specifies (regulation 14).

Under the Third Schedule of the 2024 Regulations, material handling equipment such as forklifts and excavators, and crawler piling and drilling rigs, are excluded from the certificate of fitness requirement.

Last updated: October 2026

The legal framework after the FMA

Cranes and hoists were "certified machinery" under the Factories and Machinery Act 1967 until 1 June 2024 . They are now controlled by:

OSHA 1994 Part VIA (sections 27A to 27G): installation approval, certificates of fitness, periodical inspection, special inspection schemes

The OSH (Plant Requiring Certificate of Fitness) Regulations 2024 (P.U.(A) 99/2024) , which prescribe steam boilers, pressure vessels and lifting machinery as plant requiring a certificate of fitness (regulation 3)

The OSH (Licensed Persons) Order 2024 , which allows licensed persons as well as DOSH officers to carry out inspections

OSHA Part VIIA , which requires crane operators, installers and maintainers to be registered competent persons . Operating, handling or being in charge of any plant is a Fifth Schedule activity.

Key definitions in the 2024 Regulations:

Crane: a powered device that raises and lowers loads on a hook or other device and can move them by movement of the crane, boom, jib or trolley, including its wire ropes and hook.

Mobile crane: a crane on a wheeled or crawler base that raises, lowers and swings loads at various radii from a lattice or telescopic boom.

Tower crane: a crane with a boom or jib mounted on a vertical tower that moves loads by changing radius or slewing.

Hoist: a passenger hoist or material hoist attached to a building.

Suspended access equipment: a gondola or cradle.

Aerial working platform: a platform raised on scissors, a mast or a boom.

The Third Schedule excludes some lifting machinery from the Regulations, including:

material handling equipment (defined to include forklifts, conveyors, excavators, tractors, dumpers and bulldozers)

  • drilling rigs
  • crawler-mounted piling and boring rigs for permanent foundations
  • vehicle-mounted winches
  • small cranes with a lifting height up to 9 m and a working load up to 80 kg

These machines still fall under OSHA's general duties and CDM 2024.

Certificates of fitness and inspections

Requirement 2024 Regulations

Certificate of fitness Issued after inspection by a DOSH officer or licensed person; valid for 15 months from the date of inspection (regs 5(6) and 6(2)(i))

Periodical inspection Under section 27E, on notice by the owner; the plant must be available for inspection, including a load test for lifting machinery (reg 6)

Maintenance Lifts, escalators, tower cranes, suspended access equipment, launching gantries, quay cranes and passenger hoists maintained by a competent person to the Eleventh Schedule procedures (reg 8)

Comprehensive examination Lifts, escalators, walkalators, tower cranes, passenger hoists, suspended access equipment , quay cranes and launching gantries examined by a competent person at least every three months , or more often per the manufacturer's manual. Maximum penalty for the owner: RM100,000 or one year or both (reg 14)

Repairs and alterations Written notice to the officer or licensed person before repair; approval rules for alteration (regs 9 to 11)

Change of ownership or disuse Notify within 30 days

On site, the SSS checks that each crane and hoist has a current certificate of fitness , displayed or available on site, and a current comprehensive examination record where required.

Operators and the lifting plan

Regulation 15 of the 2024 Regulations:

The owner or occupier must ensure each tower crane or mobile crane is operated only by a competent person who is a crane operator (15(1)).

The owner or occupier must establish a lifting plan taking into account the risk assessment report , so the crane can be operated safely (15(2)).

The crane operator must:

follow the employer's or occupier's OSH instructions for safe crane operation (15(3)(a))

test all limit switches and indicator devices without load before any lift , and record the results in the logbook or log sheet before the start of each shift (15(3)(b))

make sure the ground on which a mobile crane will operate is safe for movement and lifting, and report it to the employer if not (15(3)(c))

The maximum penalty is RM100,000 or one year or both for owners and occupiers, and RM5,000 or one year or both for the competent person. Lift planning is covered in Section 8.3.

How cranes fail

Failure Typical cause Control

Overturning Load beyond the duty chart; radius increased while slewing; outriggers not fully set; soft ground; wind Lift plan; rated capacity limiter set correctly; full outrigger set-up on mats; ground assessment; wind limits

Structural failure Overload; fatigue; incorrect assembly or missing pins; corrosion Competent erection; comprehensive examinations; certificate of fitness

Two-blocking Hook block pulled into the boom tip Anti-two-block device tested before each shift

Load drop Failed rigging; poor slinging; hook latch missing Inspected lifting tackle; competent rigger; no one under loads

Contact with power lines Boom or load near overhead lines CDM regulation 27; planning; barriers; the line owner's safe distance

Collision Two cranes slewing into each other; crane hitting a structure Zoning or anti-collision systems; slew limits; communication

NADOPOD 2004 makes the collapse, overturning or failure of any load-bearing part of a crane or hoist a dangerous occurrence , whether or not anyone is hurt.

DOSH publishes safety alerts on tower crane incidents in Malaysia, including failures in strong wind, luffing jib failures and a connecting pin failure. Read them as case studies for toolbox talks.

Mobile and crawler cranes: ground and set-up

Ground assessment. The operator has a legal duty to check the ground (regulation 15(3)(c)), but the lift planner must assess bearing capacity in advance. Watch for backfilled trenches, drains, basements, voids and soft spots.

Outriggers. Extend and set them as the duty chart requires. Use mats or pads sized for the outrigger loads and ground. Keep outriggers away from excavation edges and slopes, outside the zone of influence.

Level. Level the crane within the manufacturer's tolerance, because being out of level reduces capacity.

Exclusion zone. Barricade the counterweight's slew path so nobody can be crushed between the counterweight and a fixed object.

Crawler cranes travelling with loads: only as the manufacturer allows, on prepared, level routes.

Tower cranes

Foundation and tie design by an engineer. Installation and dismantling only by registered competent installers, as DOSH registers "responsible persons" for tower crane installation and maintenance, following the manufacturer's sequence.

Installation approval and certificate of fitness before use. Comprehensive examination at least every three months .

Daily checks by the operator, including limit switch tests recorded in the logbook (regulation 15(3)(b)).

Wind: stop operations at the manufacturer's in-service wind limit, measured by the crane's anemometer . Leave the jib free to weathervane (slew freely) out of service, unless the manufacturer says otherwise.

Multiple cranes: use oversailing and zoning plans, anti-collision systems, and agreed radio channels.

Access: safe ladders with rest platforms and fall protection. Rescue planning for an operator taken ill in the cab.

Passenger and material hoists

They require a certificate of fitness and a comprehensive examination at least every three months.

Check landing gates and interlocks at every level, mast ties, and the base enclosure.

Never ride a material hoist.

Display the rated load and passenger number, and do not exceed them.

Scenario: the mobile crane by the drain

A 50-tonne mobile crane is set up to lift precast beams with one outrigger 1 m from the edge of a newly backfilled drain trench. The operator has not done the limit switch test.

The SSS stops the lift and:

Checks the crane's certificate of fitness and the operator's competent person registration. Both are valid.

Has the lift planner reassess the set-up. The outrigger is moved outside the trench's zone of influence onto engineered mats, and the radius is recalculated from the duty chart.

Has the operator carry out and record the no-load limit switch tests before lifting (regulation 15(3)(b)).

Barricades the counterweight slew area and briefs the rigging crew on the lift plan.