Study guide

8.2 Lifting Tackle and Rigging: Slings, Shackles, Hooks, Inspection and Discard

NIOSH Site Safety Supervisor SSS

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: The SSS Role & Malaysian OSH Legislation

1.1 The Site Safety Supervisor: Legal Appointment, DOSH Registration & Core Duties 1.2 OSHA 1994 as Amended by Act A1648: Structure, Duties, Rights & Penalties 1.3 Regulations Under OSHA 1994 That a Site Safety Supervisor Applies 1.4 CDM Regulations 2024: Duty Holders, Notification, Plans and Site Requirements

2 Chapter 2: OSH Management Systems, Human Factors & Risk Management

2.1 OSH Management Systems: Planning, OSH Policy, Site Organisation & Safety Committees 2.2 Human and Behavioural Factors in Construction Safety 2.3 HIRARC and the General Principles of Prevention 2.4 Safe Work Procedures and Permit-to-Work Systems 2.5 Monitoring, Accident Investigation, NADOPOD Reporting, Record Keeping & Audit

3 Chapter 3: Site Planning, General Control, Welfare & Communication

3.1 Site Initial Planning, Hoarding, Access and Vehicle & Plant Movement 3.2 General Control and Welfare: Housekeeping, Storage, Site Security, Welfare Facilities and First Aid 3.3 Safety Communication: Site Induction, Toolbox Meetings, Signs and Safety Promotion

4 Chapter 4: Working at Height & Fall Protection

4.1 Working at Height: Legal Basis, Fall Physics and the Fall-Control Hierarchy 4.2 Collective Fall Protection: Guardrails, Floor Openings, Nets and Catch Platforms 4.3 Personal Fall Protection, Ladders, MEWPs and Rescue from Height

5 Chapter 5: Scaffolding: Components, Design, Erection & Inspection

5.1 Scaffolding Types, Components, Foundations, Bracing and Tower Scaffolds 5.2 Scaffold Design, Loading, Competent Scaffolders and Safe Erection & Dismantling 5.3 Scaffold Inspection, Tagging Systems and Records

6 Chapter 6: Excavation, Shoring & Underground Services

6.1 Excavation Hazards, Soil Behaviour and Pre-Excavation Investigation 6.2 Protecting Excavation Sides: Battering, Benching, Shoring and Trench Support Systems 6.3 Deep Excavations, Retaining Systems, Cofferdams & Caissons, Monitoring and Rescue 6.4 Excavation Access, Edge Protection, Inspection Reports, Underground Services, Water and Air

7 Chapter 7: Piling, Formwork & Falsework, Concrete Work & Demolition

7.1 Piling Operations: Rigs, Working Platforms, Driven and Bored Piles 7.2 Formwork and Falsework: Temporary Works Design, Erection, Inspection and Loading 7.3 Concrete Work: Pre-Pour Checks, Pumping and Placing, Cement Health Hazards and Striking 7.4 Demolition and Dismantling: Surveys, Written Arrangements, Methods, Debris and Asbestos

8 Chapter 8: Lifting Operations, Work Equipment & Mobile Plant

8.1 Cranes and Hoists: Certificates of Fitness, Competent Operators, Ground and Crane Safety 8.2 Lifting Tackle and Rigging: Slings, Shackles, Hooks, Inspection and Discard 8.3 Lift Planning, Load Charts, Sling Angles and Crane Signalling 8.4 Work Equipment and Mobile Plant: Earthmoving Machines, Hand and Power Tools, Compressors and Guarding

9 Chapter 9: Electrical Safety, Fire & Hot Work, and Confined Spaces

9.1 Electrical Safety on Construction Sites: Temporary Supply, RCDs, Competent Persons and Safe Isolation 9.2 Fire Safety, Emergency Arrangements, Hot Work and Welding 9.3 Confined Spaces: The 2010 ICOP, Hazardous Atmospheres, Roles, Permits and Rescue

10 Chapter 10: Occupational Health Hazards & Controls

10.1 Physical Hazards: Noise, Vibration, Heat Stress, Radiation and Lighting 10.2 Musculoskeletal Hazards: Manual Handling and Ergonomics on Construction Sites 10.3 Chemical and Biological Hazards: USECHH, CLASS, Silica, Asbestos, Lead and Site Infections 10.4 Psychological Health: Psychosocial Hazards, Stress, Fatigue, Violence and Substance Misuse 10.5 Personal Protective Equipment and Site Emergency Response

11 Chapter 11: The SSS Examination: Paper 1, Site Assessment & Presentation

11.1 The SSS Examination: Entry Rules, Format, Retakes and Paper 1 Technique 11.2 Paper 2: Site Visit Practice, the Site Assessment and the Online HIRARC Presentation

8.2 Lifting Tackle and Rigging: Slings, Shackles, Hooks, Inspection and Discard

Key Takeaways Explain This Topic AI

Regulation 16 of the Plant Requiring Certificate of Fitness Regulations 2024 says no lifting tackle may be used unless its design and construction comply with a recognised standard, and the owner or occupier must ensure it is in good condition before use.

The 2024 Regulations list recognised standards including Malaysian Standards (MS), ISO, British Standards (BS), ANSI, DIN and Australian Standards.

Under EN 1492, synthetic flat and round slings are colour coded by working load limit: violet 1 t, green 2 t, yellow 3 t, grey 4 t, red 5 t, brown 6 t, blue 8 t and orange 10 t or more.

ASME B30.9 removes a single-part wire rope sling from service at 10 randomly distributed broken wires in one rope lay or 5 broken wires in one strand within one lay.

Every item of lifting tackle should be marked with its safe working load or working load limit and an identification number, and checked before each use.

Last updated: October 2026

The legal duty

The Plant Requiring Certificate of Fitness Regulations 2024 separate lifting machinery (the crane or hoist) from lifting tackle : the slings, shackles, hooks, eyebolts, spreader beams and other gear between the machine and the load, not permanently attached to the load.

Regulation 16:

No person may use any lifting tackle on lifting machinery unless its design and construction comply with a recognised standard .

The owner or occupier must, so far as practicable, ensure the lifting tackle is in good condition before use .

The Fourth Schedule of the Regulations lists the recognised standards, including:

  • Malaysian Standards (MS)
  • ISO
  • British Standards (BS)
  • ANSI
  • DIN
  • Australian Standards (AS)
  • IEC
  • CENELEC

In practice this means buying tackle made and tested to a recognised product standard, with a manufacturer's certificate, and checking it before every use.

OSHA 1994 section 15(2)(a) (safe plant) and section 18B (risk assessment) also apply. The Malaysian regulations do not set a fixed interval for periodic thorough examination of tackle. A widely used benchmark is the UK Lifting Operations and Lifting Equipment Regulations (LOLER) requirement for a thorough examination of lifting accessories at least every six months by a competent person, alongside pre-use checks, with the results recorded. Specify the interval in the construction phase plan or lifting procedure.

Types of lifting tackle

Item Typical use Key points

Wire rope slings Steel sections, precast, general lifting Ferrule-secured or spliced eyes made to standard; never form eyes with wire rope grips (bulldog clips); protect from sharp edges

Chain slings (alloy, grade 80 or 100) Rough, hot or abrasive loads; adjustable legs Grade marked on the links; identification tag shows the working load limit for each leg angle; never use mild steel chain for lifting

Flat webbing and round slings (polyester) Finished, fragile or polished loads Colour-coded by working load limit; label must be legible; vulnerable to cuts, heat and chemicals; use edge protection

Shackles (bow and D) Connecting slings to lifting points Working load limit and grade marked; use the correct pin and never replace it with a bolt; bolt-type shackles with nut and split pin for long-term or rotating use

Hooks Crane hook and sling hooks Safety catch fitted and working; no opening, twisting or cracks

Eyebolts and lifting points Cast-in or screwed lifting points Correct type and rating for the angle of pull; fully engaged threads; collar seated

Spreader and lifting beams Long loads, cages, multi-point lifts Designed and marked with their safe working load and self-weight; certificate kept

Marking and records

Every item should carry:

  • a unique identification number
  • the safe working load or working load limit , for multi-leg slings at the leg angles stated
  • the grade or standard , where applicable
  • the manufacturer and date or batch

Keep a lifting tackle register showing each item's certificate, inspection dates and results, and the date it was withdrawn. Many sites add a colour tag that changes each inspection period, so that out-of-date items are easy to spot. The colour scheme should be explained in the site rules.

Pre-use inspection and discard

The person using the tackle, normally a competent rigger, checks it before every lift . Remove items with any defect from use at once, label them "DO NOT USE", and quarantine or destroy them.

Wire rope slings

Discard criteria in ASME B30.9 (slings) for a single-part sling:

  • 10 randomly distributed broken wires in one rope lay , or 5 broken wires in one strand in one rope lay
  • kinking, crushing, birdcaging or other distortion of the rope structure
  • severe corrosion , or heat damage (discoloured or charred)
  • damaged or cracked fittings or ferrules ; a slipped ferrule
  • missing or illegible identification

Remember that wire ropes on the crane itself (hoist and luffing ropes) are judged against the crane manufacturer's criteria and ISO 4309 by the crane's competent examiner.

Chain slings

Links stretched, bent, twisted, cracked, gouged or worn . EN 818-6 practice discards chain worn to 90% of its nominal diameter, or stretched more than 5%.

Hooks opened or with damaged catches; damaged master links or connectors.

Exposure to excessive heat, or welding spatter on links.

Synthetic slings

EN 1492 colour codes for flat webbing and round slings (working load limit in a straight vertical lift):

  • Colour Working load limit
  • Violet 1 tonne
  • Green 2 tonnes
  • Yellow 3 tonnes
  • Grey 4 tonnes
  • Red 5 tonnes
  • Brown 6 tonnes
  • Blue 8 tonnes
  • Orange 10 tonnes or more

Discard a synthetic sling if it has:

  • cuts, tears or abrasion
  • broken or worn stitching
  • burns, melting or heat glazing
  • chemical damage
  • knots
  • for round slings, damage exposing the core yarns
  • a missing or illegible label , because without it the rating cannot be confirmed
  • Shackles and hooks

Shackles: discard if bent, deformed or cracked, if the pin is not the original matching pin, or if the threads are damaged.

Hooks: ASME B30.10 removes a hook from service if its throat opening has increased by more than 5% , if it is twisted more than 10° from its plane, or if it is cracked or worn beyond the manufacturer's limits. The safety catch must close fully.

Safe rigging practice

Know the weight. Use delivery documents, the drawing or calculation. Never guess.

Choose the sling configuration and angle from the load and the sling's rated capacity (Section 8.3). Wider angles increase leg tension.

Protect slings from sharp edges with packers or edge protectors, especially synthetic slings on steel or concrete edges.

Seat loads correctly in hooks. Never load the hook tip. Connect shackles so the pin is not loaded by a rotating sling.

Never use damaged, unmarked or homemade tackle , including slings made with wire rope grips or reinforcement bar hooks.

Do not shorten slings with knots. Do not wrap a sling round the hook in a way that crushes it.

Use taglines to control loads. Never stand under a suspended load or put hands between the load and the sling as it tightens.

Lift slightly first and check the balance, sling seating and brakes before the full lift.

Store tackle off the ground , dry and away from chemicals, heat and sunlight, with synthetic slings out of UV.

Scenario: the rebar bundle lift

A rigger prepares to lift a 2.5-tonne rebar bundle with a yellow (3 t) webbing sling in a two-leg basket, running over the cut ends of the bars. The SSS notices:

  • the label is missing on the second sling
  • the shackle pin has been replaced with a bolt

The SSS stops the lift because:

  • an unlabelled sling has no confirmed rating and must be withdrawn
  • the bolt is not a rated shackle pin
  • cut rebar ends will slice webbing slings

Corrective action: use a rated chain sling, which suits rough steel, with the correct leg angle checked against its tag, or webbing with proper edge protection. Use a shackle with its matching pin and taglines. The defective items are quarantined and logged in the tackle register.