Study guide

10.1 Physical Hazards: Noise, Vibration, Heat Stress, Radiation and Lighting

NIOSH Site Safety Supervisor SSS

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: The SSS Role & Malaysian OSH Legislation

1.1 The Site Safety Supervisor: Legal Appointment, DOSH Registration & Core Duties 1.2 OSHA 1994 as Amended by Act A1648: Structure, Duties, Rights & Penalties 1.3 Regulations Under OSHA 1994 That a Site Safety Supervisor Applies 1.4 CDM Regulations 2024: Duty Holders, Notification, Plans and Site Requirements

2 Chapter 2: OSH Management Systems, Human Factors & Risk Management

2.1 OSH Management Systems: Planning, OSH Policy, Site Organisation & Safety Committees 2.2 Human and Behavioural Factors in Construction Safety 2.3 HIRARC and the General Principles of Prevention 2.4 Safe Work Procedures and Permit-to-Work Systems 2.5 Monitoring, Accident Investigation, NADOPOD Reporting, Record Keeping & Audit

3 Chapter 3: Site Planning, General Control, Welfare & Communication

3.1 Site Initial Planning, Hoarding, Access and Vehicle & Plant Movement 3.2 General Control and Welfare: Housekeeping, Storage, Site Security, Welfare Facilities and First Aid 3.3 Safety Communication: Site Induction, Toolbox Meetings, Signs and Safety Promotion

4 Chapter 4: Working at Height & Fall Protection

4.1 Working at Height: Legal Basis, Fall Physics and the Fall-Control Hierarchy 4.2 Collective Fall Protection: Guardrails, Floor Openings, Nets and Catch Platforms 4.3 Personal Fall Protection, Ladders, MEWPs and Rescue from Height

5 Chapter 5: Scaffolding: Components, Design, Erection & Inspection

5.1 Scaffolding Types, Components, Foundations, Bracing and Tower Scaffolds 5.2 Scaffold Design, Loading, Competent Scaffolders and Safe Erection & Dismantling 5.3 Scaffold Inspection, Tagging Systems and Records

6 Chapter 6: Excavation, Shoring & Underground Services

6.1 Excavation Hazards, Soil Behaviour and Pre-Excavation Investigation 6.2 Protecting Excavation Sides: Battering, Benching, Shoring and Trench Support Systems 6.3 Deep Excavations, Retaining Systems, Cofferdams & Caissons, Monitoring and Rescue 6.4 Excavation Access, Edge Protection, Inspection Reports, Underground Services, Water and Air

7 Chapter 7: Piling, Formwork & Falsework, Concrete Work & Demolition

7.1 Piling Operations: Rigs, Working Platforms, Driven and Bored Piles 7.2 Formwork and Falsework: Temporary Works Design, Erection, Inspection and Loading 7.3 Concrete Work: Pre-Pour Checks, Pumping and Placing, Cement Health Hazards and Striking 7.4 Demolition and Dismantling: Surveys, Written Arrangements, Methods, Debris and Asbestos

8 Chapter 8: Lifting Operations, Work Equipment & Mobile Plant

8.1 Cranes and Hoists: Certificates of Fitness, Competent Operators, Ground and Crane Safety 8.2 Lifting Tackle and Rigging: Slings, Shackles, Hooks, Inspection and Discard 8.3 Lift Planning, Load Charts, Sling Angles and Crane Signalling 8.4 Work Equipment and Mobile Plant: Earthmoving Machines, Hand and Power Tools, Compressors and Guarding

9 Chapter 9: Electrical Safety, Fire & Hot Work, and Confined Spaces

9.1 Electrical Safety on Construction Sites: Temporary Supply, RCDs, Competent Persons and Safe Isolation 9.2 Fire Safety, Emergency Arrangements, Hot Work and Welding 9.3 Confined Spaces: The 2010 ICOP, Hazardous Atmospheres, Roles, Permits and Rescue

10 Chapter 10: Occupational Health Hazards & Controls

10.1 Physical Hazards: Noise, Vibration, Heat Stress, Radiation and Lighting 10.2 Musculoskeletal Hazards: Manual Handling and Ergonomics on Construction Sites 10.3 Chemical and Biological Hazards: USECHH, CLASS, Silica, Asbestos, Lead and Site Infections 10.4 Psychological Health: Psychosocial Hazards, Stress, Fatigue, Violence and Substance Misuse 10.5 Personal Protective Equipment and Site Emergency Response

11 Chapter 11: The SSS Examination: Paper 1, Site Assessment & Presentation

11.1 The SSS Examination: Entry Rules, Format, Retakes and Paper 1 Technique 11.2 Paper 2: Site Visit Practice, the Site Assessment and the Online HIRARC Presentation

10.1 Physical Hazards: Noise, Vibration, Heat Stress, Radiation and Lighting

Key Takeaways Explain This Topic AI

Under the Noise Exposure Regulations 2019, excessive noise means a daily noise exposure above 82 dB(A), a maximum sound pressure level above 115 dB(A) or a peak above 140 dB(C), and it triggers a noise risk assessment by a DOSH-registered assessor.

The Noise Exposure Regulations 2019 limit a worker's daily noise exposure to 85 dB(A) (or a 100% daily dose), the maximum sound pressure level to 115 dB(A) and the peak to 140 dB(C).

Under the Noise Exposure Regulations 2019, workers exposed above the limit must have audiometric testing every year, and areas above the limit must be marked "HEARING PROTECTION ZONE".

DOSH's Guidelines on Heat Stress Management at Workplace 2016 calculate outdoor WBGT as 0.7 times the natural wet-bulb temperature plus 0.2 times the globe temperature plus 0.1 times the dry-bulb temperature.

DOSH's heat stress guideline says complete heat acclimatisation generally takes seven to fourteen days, and heat tolerance drops even after a long weekend away from heat.

Last updated: October 2026

Physical hazards on construction sites

Physical hazards are forms of energy that harm the body: sound, vibration, heat, radiation and poor lighting. They are easy to underestimate, because damage such as noise-induced hearing loss or vibration white finger develops slowly and is permanent.

Noise: the OSH (Noise Exposure) Regulations 2019

The 2019 Regulations (P.U.(A) 60/2019) replaced the repealed FM (Noise Exposure) Regulations 1989.

Key definitions and limits

Term Value

Excessive noise (triggers a noise risk assessment) Daily noise exposure above 82 dB(A) , a maximum sound pressure level above 115 dB(A) at any time, or a peak above 140 dB(C)

Exposure limit (regulation 6(1)) Daily noise exposure 85 dB(A) or a daily personal noise dose of 100% ; maximum 115 dB(A) at any time; peak 140 dB(C)

Employer duties

Noise risk assessment (regulation 4):

  • carried out by a noise risk assessor registered with the Director General , using IEC-standard equipment
  • the report is given to the employer within one month
  • exposed employees are told the findings within 14 days
  • recommendations are carried out within 30 days
  • the assessment is reviewed within five years or when directed

Information, instruction and training for exposed workers, at least once a year (regulation 5).

Reduce noise above the limit (regulation 6). First assess what is practicable, then apply controls in this order:

  • engineering control
  • engineering control together with administrative control
  • administrative control alone
  • other effective measures, including personal hearing protectors

Keep engineering controls in good working order.

Personal hearing protectors (regulation 7): suitable, maintained, available, giving enough attenuation, and approved by the Director General .

Hearing protection zones (regulation 8): areas above the limit are marked "HEARING PROTECTION ZONE" , and everyone entering uses hearing protectors.

Audiometric testing (regulations 9 and 10):

annual testing for employees exposed above the limit, at a DOSH-approved centre, interpreted by an occupational health doctor, at no cost to the employee

  • the first test within three months of starting work in the area, after 14 hours without noise above 80 dB(A)
  • a temporary threshold shift is retested within three months
  • noise-induced hearing loss is notified to DOSH within 7 days

Records (regulation 11): noise risk assessment reports kept at least 30 years ; audiometric reports kept for the period of employment plus five years .

The maximum penalty is RM10,000 or one year or both. Noise-induced hearing loss is also a reportable occupational disease under the NADOPOD Third Schedule.

Construction noise controls

Source Engineering and administrative controls

Piling hammers Bored or jack-in piles instead of driven piles; non-metallic dolly; acoustic shroud around the hammer and pile (DOSH public safety guideline 19.7)

Breakers and jackhammers Hydraulic crushers or bursting instead of breaking; silenced or low-noise tools; limited exposure time

  • Generators and compressors Silenced models; acoustic enclosures; sited away from work areas
  • Saws and grinders Sharp blades; damped blades; enclosures; reduced use
  • General Plan noisy work away from crowded areas; rotate tasks; mark hearing protection zones

The decibel scale is logarithmic. Doubling the sound energy adds 3 dB , so two identical 90 dB(A) machines together produce about 93 dB(A) . Because daily noise exposure is an energy average, each 3 dB increase halves the time it takes to reach the same daily dose.

Vibration

Type Sources Health effects

Hand-arm vibration (HAV) Breakers, hammer drills, grinders, compactor plates, poker vibrators Hand-arm vibration syndrome: vibration white finger (blanching), numbness, loss of grip, carpal tunnel syndrome

Whole-body vibration (WBV) Dumpers, rollers, excavators and tractors on rough ground Low back pain and spinal disorders, worse with poor seating and posture

DOSH has published guidelines for work involving vibration (2003). Internationally, the EU Physical Agents (Vibration) Directive 2002/44/EC sets:

  • for hand-arm vibration, a daily exposure action value of 2.5 m/s² A(8) and a limit value of 5 m/s² A(8)
  • for whole-body vibration, an action value of 0.5 m/s² and a limit value of 1.15 m/s²

These are useful benchmarks when planning exposure times.

Controls:

Choose different methods, for example crushing or diamond cutting instead of breaking.

Use low-vibration tools and anti-vibration mounts, and maintain tools with sharp bits.

Limit trigger time and rotate workers.

Keep hands warm and dry.

Fit suspension seats in plant and maintain haul roads.

Report early symptoms and arrange health surveillance where exposure is high.

Disease caused by vibration is in the NADOPOD Third Schedule (item 36).

Heat stress: DOSH Guidelines on Heat Stress Management at Workplace 2016

Malaysia's hot, humid climate, with work on exposed decks and roofs, makes heat stress a daily construction hazard.

  • Heat illnesses (from mild to life-threatening)
  • Heat rash

Heat cramps: replace fluid and salt; the guideline suggests drinking water or electrolyte drinks every 15 to 20 minutes

  • Heat syncope: fainting
  • Heat exhaustion: heavy sweating, weakness, nausea
  • Heat stroke: a medical emergency, with hot dry skin, confusion, convulsions and loss of consciousness
  • The WBGT index

The wet bulb globe temperature (WBGT) combines air temperature, humidity, radiant heat and air movement:

  • Outdoors with sun: WBGT = 0.7 Tnwb + 0.2 Tg + 0.1 Tdb
  • Indoors or without sun: WBGT = 0.7 Tnwb + 0.3 Tg

Here Tnwb is the natural wet-bulb temperature, Tg the globe temperature and Tdb the dry-bulb temperature. A clothing adjustment is added. The adjusted WBGT is compared with ACGIH action limits and threshold limit values for the workload and work-rest regime.

  • Risk decision Recommended action (DOSH 2016, Table 9)
  • Low (below the action limit) Continue work and monitor

Medium (between the action limit and the TLV) General controls : information and training; regular drinks of water ; self-limiting exposure; health screening including pre-placement; reporting symptoms; a cool rest area ; PPE

High (above the TLV) All general controls plus job-specific controls: engineering measures (mechanical aids, shielding from radiant heat, ventilation, a rapid cooling area); administrative measures ( acclimatisation , supervision, working in pairs, first aid and emergency procedures, a work-rest regime , oral rehydration drinks, suitable clothing)

Acclimatisation: complete heat acclimatisation generally takes seven to fourteen days . Heat tolerance falls even after a long weekend , so very hot work on the first day of the week is not advisable. New workers should build up gradually.

First aid for heat stroke:

Call 999.

Move the casualty to shade.

Cool them rapidly with water and fanning.

Monitor until help arrives.

Radiation

Solar ultraviolet: long outdoor exposure causes sunburn, skin cancer and eye damage. Provide shade, schedule heavy work earlier where possible, and supply helmet neck flaps, long sleeves and UV-filtering safety glasses.

Welding arc ultraviolet and infrared: causes arc eye and burns (Section 9.2). Use screens to protect passers-by.

Ionising radiation: from industrial radiography, such as weld testing on pipelines and steelwork, and from some density gauges. Its use is licensed under the Atomic Energy Licensing Act 1984 (Act 304) . Fourth Schedule work in CDM 2024 includes ionising radiation that requires controlled or supervised areas. Keep everyone outside the radiographer's barriers and follow their warning signals.

Lighting

CDM 2024 regulation 37 requires:

  • suitable and sufficient lighting , natural where practicable, on the site, its surroundings and traffic routes
  • artificial lighting that does not change how safety signs look
  • secondary lighting where failure of the main lighting would create risk

Poor lighting causes trips, falls and errors in basements, stairwells and night work.

Scenario: the basement breaking crew

Two workers spend most of each shift breaking concrete with pneumatic breakers in a basement, beside an unsilenced compressor, at 34 °C with poor ventilation. Neither wears hearing protection. The SSS:

Arranges a noise risk assessment by a registered assessor. Exposure is clearly above 85 dB(A), so the area is marked as a hearing protection zone and approved hearing protectors are issued at once as an interim measure.

Has the employer consider engineering controls first: a remote-controlled demolition robot or hydraulic crusher, moving the compressor outside, and an acoustic enclosure.

Rotates the breaker operators to limit vibration exposure, and plans audiometric testing.

Applies heat controls: water at the work face, a cool rest area, ventilation, a work-rest schedule, and buddy checks for heat illness symptoms.