Study guide

Using the 2017 NEC on Exam Day

NABCEP PV Installation Professional PVIP

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Exam Overview

About the NABCEP PVIP Exam Using the 2017 NEC on Exam Day

2 Chapter 1: Solar Resource & Site Assessment

1.1 Sun Position, Irradiance, and Insolation 1.2 Site Survey and Roof Condition Assessment 1.3 Shading Analysis and Solar Access 1.4 Array Layout and Fire Code Setbacks

3 Chapter 2: Photovoltaic Modules & Cell Technology

2.1 PV Cell Technologies and Manufacturing 2.2 Electrical Performance Characteristics & I-V Curves 2.3 Module Degradation, Testing Standards, and Warranties

4 Chapter 3: Inverters & System Architectures

3.1 Inverter Types and Topologies 3.2 Inverter Efficiency, Features, and Grid Interaction 3.3 System Configurations: Grid-Direct vs Stand-Alone 3.4 Hybrid and AC-Coupled vs DC-Coupled Architectures

5 Chapter 4: Mechanical Mounting & Roofing Systems

4.1 Sloped Roof Mounting and Flashing Methods 4.2 Low-Slope Ballasted and Penetrating Systems 4.3 Ground Mounts and Tracking Systems

6 Chapter 5: Structural Loading & Mechanical Assembly

5.1 Structural Load Calculations and Engineering 5.2 Mechanical Assembly and Hardware Specifications 5.3 Wire Management and Array Mechanical Protection

7 Chapter 6: Electrical Calculations & Sizing

6.1 Maximum System Voltage and Temperature Calculations 6.2 Maximum Circuit Current and Overcurrent Protection 6.3 Conductor Sizing and Ampacity Derating 6.4 Voltage Drop Analysis and Sizing in PV Systems

8 Chapter 7: Electrical Equipment & Safety Disconnects

7.1 PV Disconnecting Means and Isolation 7.2 Wiring Methods, Raceways, and Connectors 7.3 Combiner Boxes and DC Balance of System 7.4 Monitoring, Controls, and Communications

9 Chapter 8: Grounding, Bonding & Fire Safety

8.1 Equipment Grounding and System Bonding 8.2 Ground-Fault Protection and Arc-Fault Interrupters 8.3 Rapid Shutdown Systems

10 Chapter 9: Utility Interconnection & Grid Integration

9.1 Utility Interconnection Standards & Permitting 9.2 Load-Side Interconnection and the 120% Rule 9.3 Supply-Side Interconnection and Alternative Connections

11 Chapter 10: Energy Storage Systems (ESS)

10.1 Battery Chemistries, Characteristics, and Ratings 10.2 Energy Storage System Sizing and Autonomy 10.3 NEC Article 706 and Electrical Storage Rules 10.4 ESS Safety Standards, NFPA 855, and Fire Codes

12 Chapter 11: System Commissioning & Acceptance Testing

11.1 Visual Inspection and Pre-Power Verification 11.2 Voltage and Current Commissioning Tests 11.3 Insulation Resistance Testing and Megohmmeter Procedures 11.4 I-V Curve Tracing and Performance Analysis

13 Chapter 12: Operations, Maintenance & Troubleshooting

12.1 Preventive Maintenance and Monitoring 12.2 Thermal Imaging and Infrared Inspection 12.3 Electrical Fault Troubleshooting and Diagnostics 12.4 Corrective Maintenance and Component Replacement

14 Chapter 13: Workplace Safety, OSHA & NFPA 70E

13.1 OSHA Regulations and Personal Protective Equipment 13.2 Fall Protection Systems and Ladder Safety 13.3 Electrical Safety, Arc Flash, and NFPA 70E 13.4 Lockout/Tagout (LOTO) and Hazardous Energy Control

15 Chapter 14: Project Management, Codes & Documentation

14.1 AHJ Permitting, Building Codes, and Plan Sets 14.2 System Labeling and Signage Requirements 14.3 Project Closeout, Commissioning Reports, and PTO 14.4 Customer Expectations, Value Engineering, and Design Adaptation

Using the 2017 NEC on Exam Day

Key Takeaways Explain This Topic AI

NABCEP provides the 2017 NEC at the PVIP exam, so answers follow 2017 section numbers even though most jurisdictions now enforce the 2020 or 2023 edition.

Key 2017 locations: the 120% rule is 705.12(B)(2)(3)(b), supply-side connections are 705.12(A) with OCPD within 10 feet under 705.31, and dc circuits inside buildings are 690.31(G).

The 2017 ampacity tables are numbered 310.15(B)(16), 310.15(B)(2)(a), and 310.15(B)(3)(a); the rooftop adder is 310.15(B)(3)(c).

Common traps from other editions include the 2014 rapid shutdown limits (240 VA within 10 seconds), the 2014 manual-restart AFCI rule, and the 2020 6 AWG supply-side minimum.

Last updated: October 2026

Using the 2017 NEC on Exam Day

NABCEP provides the 2017 National Electrical Code during the PVIP exam, but most jurisdictions now enforce the 2020, 2023, or 2026 edition. Section numbers moved between editions, and several PV rules changed in substance. Answers on the exam follow the 2017 code book in front of you, so this guide cites 2017 section numbers first and notes the later numbers where they differ. Use this section as a map before you start the technical chapters.

1. How Article 690 Is Organized (2017 NEC)

  • Part Topic Key Sections
  • I. General Scope, definitions, equipment listing, ac modules 690.1, 690.2, 690.4, 690.6

II. Circuit Requirements Maximum voltage, circuit sizing, overcurrent, stand-alone systems, arc-fault protection, rapid shutdown 690.7, 690.8, 690.9, 690.10, 690.11, 690.12

III. Disconnecting Means PV system disconnect; equipment isolation 690.13, 690.15

IV. Wiring Methods Methods permitted, component interconnections, connectors, access to boxes 690.31, 690.32, 690.33, 690.34

V. Grounding and Bonding System grounding and ground-fault protection, equipment grounding, EGC size, grounding electrode system 690.41, 690.42, 690.43, 690.45, 690.46, 690.47

VI. Marking Module marking, dc power source label, interconnection marking, ESS polarity, identification of power sources 690.51–690.56

  • VII. Connection to Other Sources Refers to Article 705 690.59
  • VIII. Energy Storage Systems Refers to Article 706; self-regulated charge control 690.71, 690.72
  • IX. Systems Over 1000 Volts Additional requirements for high-voltage systems 690.80, 690.85