Study guide
7.2 Formwork and Reinforcement Placement
NASCLA Contractor Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Coverage Map & Exam Overview
Coverage Map & Exam Overview
2 Business Organization, Licensing & Law
1.1 Business Entity Types and Formation 1.2 NASCLA Trade-Exam Waiver and Agency Licensing Boundaries 1.3 Construction Contract Law and Types of Contracts 1.4 Lien Law, Bond Claims, and Dispute Resolution
3 Financial Management, Tax & Labor Law
2.1 Financial Statements, Job Costing, and Cash Flow 2.2 Payroll, Federal/State Tax, and Recordkeeping 2.3 Labor & Employment Law (FLSA, immigration/I-9, EEO) 2.4 Insurance, Surety Bonds, and Risk Management
4 Estimating, Bidding & Plan Reading
3.1 Reading Construction Drawings and Specifications (CSI MasterFormat) 3.2 Quantity Takeoff and Material Estimating 3.3 Bidding, Markup, Overhead, and Profit 3.4 Change Orders, Allowances, and Unit Pricing
5 Project Management & Scheduling
4.1 Project Delivery Methods and the Submittal/RFI Process 4.2 Scheduling (CPM, Bar Charts, Critical Path) 4.3 Quality Control, Inspections, and Closeout 4.4 Permits, Codes, and the Inspection Process
6 Construction Safety & OSHA (29 CFR 1926)
5.1 OSHA Administration, Recordkeeping, and the General Duty Clause 5.2 Fall Protection, Scaffolds, and Ladders 5.3 Excavation/Trenching, Electrical, and Hazard Communication 5.4 PPE, Fire Protection, Cranes, and Confined Spaces
7 General Requirements & Sitework
6.1 Division 01 General Requirements and Temporary Facilities 6.2 Surveying, Site Layout, and Excavation 6.3 Soils, Compaction, and Erosion/Sediment Control 6.4 Foundations, Footings, and Site Drainage
8 Concrete (CSI Division 03)
7.1 Concrete Materials, Mix Design, and Water-Cement Ratio 7.2 Formwork and Reinforcement Placement 7.3 Placing, Finishing, Curing, and Testing (slump, cylinders) 7.4 Concrete Defects, Joints, and Cold-Weather Practices
9 Masonry (CSI Division 04)
8.1 Masonry Units, Mortar Types (M/S/N/O), and Grout 8.2 Brick and CMU Bonds, Reinforcement, and Coursing 8.3 Lintels, Control/Expansion Joints, and Flashing 8.4 Masonry Estimating and Cold/Hot Weather Construction
10 Metals & Wood (CSI Divisions 05 & 06)
9.1 Structural Steel, Connections, and Welding/Bolting 9.2 Light-Gauge Metal Framing 9.3 Wood Framing, Species/Grades, and Fasteners 9.4 Engineered Wood, Trusses, and Load Paths
11 Thermal & Moisture Protection (CSI Division 07)
10.1 Waterproofing, Dampproofing, and Below-Grade Protection 10.2 Insulation, R-Values, and Vapor Barriers 10.3 Roofing Systems (steep-slope and low-slope) and Underlayment 10.4 Flashing, Sealants, and Air Barriers
12 Openings & Finishes (CSI Divisions 08 & 09)
11.1 Doors, Windows, Glazing, and Hardware 11.2 Gypsum Board, Plaster, and Framing 11.3 Flooring, Tile, and Acoustical Ceilings 11.4 Painting, Coatings, and Finish Schedules
13 Mechanical, Plumbing & Electrical Overview
12.1 Plumbing Systems, Fixtures, and DWV/Supply Basics 12.2 HVAC Systems and Load Concepts 12.3 Electrical Systems, Service, and NEC Basics 12.4 Coordination, Rough-In, and Energy Code
7.2 Formwork and Reinforcement Placement
Key Takeaways Explain This Topic AI
Formwork must resist dead, live, and lateral loads; fresh concrete acts like a fluid at ~150 lb/ft^3, so fast/tall pours create high blow-out pressure.
OSHA 1926 Subpart Q (1926.703) requires engineered, braced forms with plans onsite; 1926.701(b) requires protruding rebar to be guarded against impalement.
Rebar number equals diameter in eighths of an inch (#4 = 1/2 in, #8 = 1 in).
ACI 318 cover: 3 in against earth, 2 in formed earth/weather, 1-1/2 in weather (small bars), 3/4 in interior slabs/walls.
Support bars on chairs/bolsters and lap splice 40-48 bar diameters per the drawings; never lay rebar on the subgrade.
Last updated: June 2026
Formwork is the temporary mold that holds plastic concrete until it cures and is self-supporting. For editorial cross-reference practice, this section connects ACI 347 (formwork design), the carpentry/concrete reference, and OSHA 29 CFR 1926 Subpart Q (Concrete and Masonry Construction). Formwork must resist dead load, live load, and lateral pressure from fresh concrete.
Lateral pressure rises with rate of placement and falls with temperature (warmer sets faster, less pressure). Plastic concrete behaves like a fluid weighing about 150 lb/ft^3 until it stiffens.
Worked numeric (full-liquid head): A 10-ft-tall wall form, if filled faster than it sets, sees pressure at the base of:
P = 150 lb/ft^3 x 10 ft = 1,500 lb/ft^2 .
That is why high walls are poured in lifts and forms are braced. Trap: pouring too fast can blow out a form rated for a slower rate.
OSHA 1926 Subpart Q key rules for this editorial navigation exercise:
1926.703: Formwork must be designed, fabricated, erected, and braced to carry all loads; drawings/plans kept at the jobsite.
Shoring and reshoring removed only when the concrete has gained adequate strength (per a registered engineer or plan).
1926.701(b): Protruding reinforcing steel onto/into which employees could fall must be guarded to eliminate impalement hazard. Use the impalement rule as a scope-and-citation check.
1926.701(a): No loads on a structure until adequate strength is confirmed.
Reinforcing steel (rebar) resists tension that concrete cannot. Bars are sized in eighths of an inch by bar number.
- Bar Diameter Common use
- #3 3/8 in Ties, stirrups
- #4 1/2 in Slabs, walls
- #5 5/8 in Walls, footings
- #6 3/4 in Beams, columns
- #8 1 in Heavy columns
Trap: #4 bar = 4/8 in = 1/2 inch diameter. The bar number equals diameter in eighths of an inch.
Concrete cover protects rebar from corrosion and fire. ACI 318 minimums (cast-in-place, non-prestressed):
3 in — concrete cast against and permanently exposed to earth (footings).
2 in — formed surfaces exposed to earth/weather (#6 and larger).
1-1/2 in — formed surfaces exposed to weather (#5 and smaller).
3/4 in — slabs/walls not exposed to weather or earth.
Trap: footing bars need 3 in cover when poured directly against soil.
Placement details:
Maintain spacing with chairs, bolsters, and spacers ; never place bars directly on the subgrade.
Lap splices transfer force where bars overlap; a typical tension lap is 40 to 48 bar diameters (verify with the structural drawings). For #5 bar at 48d: 48 x 0.625 in = 30 in lap .
Welded wire reinforcement (WWR) in slabs should sit in the upper third to control shrinkage cracking.
Trap: rebar placed too low or on the ground loses its tension function and corrodes.