Study guide
10.3 Roofing Systems (steep-slope and low-slope) and Underlayment
NASCLA Contractor Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Coverage Map & Exam Overview
Coverage Map & Exam Overview
2 Business Organization, Licensing & Law
1.1 Business Entity Types and Formation 1.2 NASCLA Trade-Exam Waiver and Agency Licensing Boundaries 1.3 Construction Contract Law and Types of Contracts 1.4 Lien Law, Bond Claims, and Dispute Resolution
3 Financial Management, Tax & Labor Law
2.1 Financial Statements, Job Costing, and Cash Flow 2.2 Payroll, Federal/State Tax, and Recordkeeping 2.3 Labor & Employment Law (FLSA, immigration/I-9, EEO) 2.4 Insurance, Surety Bonds, and Risk Management
4 Estimating, Bidding & Plan Reading
3.1 Reading Construction Drawings and Specifications (CSI MasterFormat) 3.2 Quantity Takeoff and Material Estimating 3.3 Bidding, Markup, Overhead, and Profit 3.4 Change Orders, Allowances, and Unit Pricing
5 Project Management & Scheduling
4.1 Project Delivery Methods and the Submittal/RFI Process 4.2 Scheduling (CPM, Bar Charts, Critical Path) 4.3 Quality Control, Inspections, and Closeout 4.4 Permits, Codes, and the Inspection Process
6 Construction Safety & OSHA (29 CFR 1926)
5.1 OSHA Administration, Recordkeeping, and the General Duty Clause 5.2 Fall Protection, Scaffolds, and Ladders 5.3 Excavation/Trenching, Electrical, and Hazard Communication 5.4 PPE, Fire Protection, Cranes, and Confined Spaces
7 General Requirements & Sitework
6.1 Division 01 General Requirements and Temporary Facilities 6.2 Surveying, Site Layout, and Excavation 6.3 Soils, Compaction, and Erosion/Sediment Control 6.4 Foundations, Footings, and Site Drainage
8 Concrete (CSI Division 03)
7.1 Concrete Materials, Mix Design, and Water-Cement Ratio 7.2 Formwork and Reinforcement Placement 7.3 Placing, Finishing, Curing, and Testing (slump, cylinders) 7.4 Concrete Defects, Joints, and Cold-Weather Practices
9 Masonry (CSI Division 04)
8.1 Masonry Units, Mortar Types (M/S/N/O), and Grout 8.2 Brick and CMU Bonds, Reinforcement, and Coursing 8.3 Lintels, Control/Expansion Joints, and Flashing 8.4 Masonry Estimating and Cold/Hot Weather Construction
10 Metals & Wood (CSI Divisions 05 & 06)
9.1 Structural Steel, Connections, and Welding/Bolting 9.2 Light-Gauge Metal Framing 9.3 Wood Framing, Species/Grades, and Fasteners 9.4 Engineered Wood, Trusses, and Load Paths
11 Thermal & Moisture Protection (CSI Division 07)
10.1 Waterproofing, Dampproofing, and Below-Grade Protection 10.2 Insulation, R-Values, and Vapor Barriers 10.3 Roofing Systems (steep-slope and low-slope) and Underlayment 10.4 Flashing, Sealants, and Air Barriers
12 Openings & Finishes (CSI Divisions 08 & 09)
11.1 Doors, Windows, Glazing, and Hardware 11.2 Gypsum Board, Plaster, and Framing 11.3 Flooring, Tile, and Acoustical Ceilings 11.4 Painting, Coatings, and Finish Schedules
13 Mechanical, Plumbing & Electrical Overview
12.1 Plumbing Systems, Fixtures, and DWV/Supply Basics 12.2 HVAC Systems and Load Concepts 12.3 Electrical Systems, Service, and NEC Basics 12.4 Coordination, Rough-In, and Energy Code
10.3 Roofing Systems (steep-slope and low-slope) and Underlayment
Key Takeaways Explain This Topic AI
Steep-slope is >=3:12 (overlapping coverings); low-slope is <3:12 (continuous membranes).
Asphalt shingles need >=2:12 slope, with double underlayment between 2:12 and 4:12 (IBC 1507.2).
Ice barriers extend 24 in. inside the exterior wall line where January average <=25 deg F.
Roofing is measured in squares (100 ft2); multiply footprint by the slope factor, then add waste.
OSHA construction fall protection triggers at 6 ft (1926.501, Subpart M).
Last updated: June 2026
Slope Classification
IBC Chapter 15 governs roofing. Slope is expressed as a ratio of vertical rise to 12 in. of horizontal run. Steep-slope roofs have a slope of 3:12 (25%) or greater and shed water by overlap (shingles, tile, metal). Low-slope roofs are below 3:12 and require a continuous membrane because standing water is likely.
Asphalt shingles require a minimum slope of 2:12 (IBC 1507.2.2). Between 2:12 and 4:12, a double underlayment is required.
Steep-Slope Minimum Slopes (IBC 1507)
- Roof Covering Minimum Slope
- Asphalt shingles 2:12 (double underlayment 2:12-4:12)
- Clay/concrete tile 2.5:12
- Wood shingles 3:12
- Wood shakes 4:12 (3:12 in some editions)
- Metal shingles 3:12
- Mineral-surfaced roll roofing 1:12
Underlayment: ASTM D226 Type I (No. 15) or Type II (No. 30) felt, or ASTM D1970 self-adhered for ice-dam zones.
Ice Barrier & Underlayment Lap
Where the average January temperature is 25 deg F or less , IBC 1507.1.1 requires an ice barrier (two layers of underlayment cemented together, or a self-adhering polymer-modified bitumen sheet) extending from the eave edge to 24 in. inside the exterior wall line .
Underlayment laps: single-layer No. 15 felt is applied with 2 in. side laps and 4 in. end laps at 4:12 and steeper. Below that, double coverage with 19 in. side laps is used.
Low-Slope Membrane Systems
Low-slope (commercial) systems include:
Built-Up Roofing (BUR): alternating plies of felt and hot bitumen, topped with gravel/cap sheet.
Modified Bitumen (Mod-Bit): SBS or APP-modified asphalt rolls, torch- or cold-applied.
Single-ply: EPDM (rubber), TPO , and PVC sheets, mechanically fastened, ballasted, or fully adhered.
IBC 1507.10-1507.13 covers these. Minimum slope for drainage is 1/4 in. per foot (2%) per IBC 1507.10.1 to avoid ponding.
Roofing Takeoff: The Square
Roofing is sold by the square = 100 ft2 . To estimate, you must convert plan (footprint) area to actual roof area using the slope factor.
- Slope Slope Multiplier
- 4:12 1.054
- 6:12 1.118
- 8:12 1.202
- 12:12 1.414
Worked example: A gable roof footprint is 40 ft x 30 ft = 1,200 ft2 at 6:12. Roof area = 1,200 x 1.118 = 1,342 ft2 = 13.42 squares . Add 10% waste = 14.76 → order 15 squares .
OSHA Fall Protection on Roofs
Per OSHA 29 CFR 1926 Subpart M (1926.501) , fall protection is required at 6 ft in construction. On low-slope roofs , work within 6 ft of an edge requires guardrails, safety nets, or personal fall arrest; between 6-15 ft a designated-area + warning-line system may be used. On steep roofs (above 4:12), fall arrest, guardrails, or nets are mandatory. Use the 6-foot threshold here as an editorial reference-navigation check; PSI does not publish its appearance frequency.