Study guide

5.3 Infiltration, Duct Losses & Total Block Load Synthesis

North Carolina HVAC Contractor License Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: North Carolina HVAC Licensing Framework & Board Jurisprudence

1.1 NC Dual-Board Regulatory Structure & General Statutes 1.2 Heating Classifications, Groups & Scopes 1.3 Examination Prerequisites, Qualifier Responsibilities & Disciplinary Rules 1.4 Examination Logistics, Reference Books & Code Editions

2 Chapter 2: North Carolina Business Organizations, Contracts & Lien Law

2.1 Construction Contracts, Project Management & Bidding 2.2 North Carolina Mechanics' Lien Law & Bond Claims 2.3 Business Organizations, Financial Management & Taxation

3 Chapter 3: Construction Safety, Electrical Safety & EPA 608

3.1 OSHA 1926 Construction Safety & Job Site Protocols 3.2 Electrical Safety, NFPA 70E & Lockout/Tagout (LOTO) 3.3 EPA Section 608 & Refrigerant Transition Regulations

4 Chapter 4: Thermodynamics, Refrigeration Cycle & Psychrometrics

4.1 Fundamentals of Thermodynamics & Heat Transfer 4.2 The Mechanical Refrigeration Cycle & Component Dynamics 4.3 Psychrometric Properties, Air Processes & Chart Navigation

5 Chapter 5: ACCA Manual J & Manual N Load Calculations

5.1 Manual J Design Conditions & Thermal Parameters 5.2 Fenestration, Opaque Envelope & Internal Heat Gains 5.3 Infiltration, Duct Losses & Total Block Load Synthesis 5.4 ACCA Manual N Commercial Load Calculation

6 Chapter 6: ACCA Manual D & Manual Q Duct Design & Air Distribution

6.1 Fan Laws, Airflow Dynamics & Total External Static Pressure 6.2 ACCA Manual D Sizing Protocol & Friction Rate Calculation 6.3 SMACNA Duct Construction, Fittings & Air Balancing 6.4 ACCA Manual Q Commercial Low-Pressure Duct Design

7 Chapter 7: Forced Air Heating, Gas Furnaces & Fuel Piping

7.1 Natural Gas & Propane Combustion Fundamentals 7.2 Gas Furnace Operation, Sequence of Control & Diagnostics 7.3 Fuel Oil Heating Systems & Code-Compliant Fuel Gas Piping

8 Chapter 8: Heat Pumps, Inverters & Commercial System Selection (Manual CS)

8.1 Heat Pump Operating Principles, Reversing Valves & Physics 8.2 Defrost Controls, Supplemental Electric Heat & Balance Points 8.3 Inverter Mini-Splits & Variable Refrigerant Flow (VRF) Systems 8.4 Manual CS: Commercial Applications, Systems & Equipment

9 Chapter 9: Hydronic Heating, Steam Systems & Boilers (H1)

9.1 Hydronic Fundamentals, Boiler Classifications & Steam Systems 9.2 Hydronic Piping Layouts, Circulator Pumps & Head Loss Calculations 9.3 Boiler Trim, Expansion Tanks, Air Elimination & Safety Controls 9.4 The NC Uniform Boiler & Pressure Vessel Act (H1 Reference)

10 Chapter 10: Commercial Refrigeration & NC Board Regulations

10.1 NC State Board of Refrigeration Contractors Statutes & Licensure 10.2 Commercial Refrigeration Systems, Multiplex Racks & Defrost Protocols 10.3 Walk-In Coolers, Freezers, Evaporator Pressure Regulators & Valves

11 Chapter 11: NC Administration, Mechanical, Fuel Gas & Energy Codes

11.1 North Carolina Mechanical Code: Equipment Access, Clearances & Condensate 11.2 Ventilation Rates, Exhaust Systems & Duct Smoke Detection 11.3 NC Fuel Gas Code: Combustion Air, Venting & Gas Appliance Installation 11.4 NC Energy Conservation Code: Duct Testing, Envelope & Efficiency Standards 11.5 NC Administrative Code & Policies: Permits, Inspections & Plan Review

12 Chapter 12: Electrical Fundamentals, Motor Controls & Diagnostics

12.1 HVAC Electrical Fundamentals, Circuit Schematics & Power Distribution 12.2 Electric Motors, Capacitors & Motor Controls 12.3 Systematic HVAC Diagnostics, Superheat/Subcooling & Airflow Troubleshooting 12.4 System Commissioning, Testing, Adjusting & Balancing (TAB)

5.3 Infiltration, Duct Losses & Total Block Load Synthesis

Key Takeaways Explain This Topic AI

Infiltration sensible load is calculated as q_sensible = 1.08 × CFM_inf × ΔT, and latent load is calculated as q_latent = 0.68 × CFM_inf × ΔW, driven by building envelope tightness and outdoor-indoor air pressure differentials.

The North Carolina Energy Conservation Code mandates a maximum envelope air leakage rate of 3.0 Air Changes per Hour at 50 Pascals (ACH_50) verified by calibrated blower door testing.

Continuous whole-house mechanical ventilation is sized in accordance with ASHRAE Standard 62.2 (CFM_vent = 0.03 × A_floor + 7.5 × (N_bedrooms + 1)), introducing outdoor sensible and latent thermal loads.

Duct systems routed through unconditioned attics or vented crawlspaces impose significant thermal gain/loss penalties and leakage losses (often adding 20% to 35% to equipment capacity), whereas ducts placed inside conditioned space impose zero load penalty.

ACCA Manual S uses the synthesized Total Block Load to size heating and cooling equipment within strict allowable limits (typically 95% to 115% for cooling air conditioners and up to 125% for heat pumps), while room-by-room CFM calculations form the design basis for ACCA Manual D duct distribution.

Last updated: August 2026

Infiltration, Duct Losses & Total Block Load Synthesis

System Synthesis Rule: Total building cooling load is the summation of Total Sensible Heat Gain ( q sensible q_{\text{sensible}} q sensible ​ ) and Total Latent Heat Gain ( q latent q_{\text{latent}} q latent ​ ). Equipment capacity must satisfy both the sensible and latent load requirements at design conditions under ACCA Manual S selection criteria.

Infiltration & Envelope Air Leakage

Infiltration is the uncontrolled entry of outdoor air into the conditioned envelope through cracks, gaps around windows and doors, penetrations for plumbing/wiring, sill plates, and recessed lighting fixtures. Infiltration is driven by:

Stack Effect: Warm air rising and escaping through upper ceiling penetrations in winter, pulling cold air in through lower foundation cracks.

Wind Pressure: Direct positive wind pressure pushing air through the windward facade and negative suction drawing conditioned air out the leeward facade.

Mechanical Pressurization / Depressurization: Exhaust fans or leaky return ductwork located in unconditioned spaces pulling outside air into the conditioned space.

Air Leakage Testing & A C H 50 ACH_{50} A C H 50 ​ Conversion

Under the North Carolina Energy Conservation Code (NCECC Section R402.4.1.2) , new residential buildings must demonstrate an air leakage rate not exceeding 3.0 Air Changes per Hour at 50 Pascals 3.0\text{ Air Changes per Hour at 50 Pascals} 3.0 Air Changes per Hour at 50 Pascals ( 3.0 ACH 50 3.0\text{ ACH}_{50} 3.0 ACH 50 ​ ) via a calibrated blower door depressurization test: ACH 50 = CFM 50 × 60 Conditioned Building Volume (cu ft) \text{ACH}_{50} = \frac{\text{CFM}_{50} \times 60}{\text{Conditioned Building Volume (cu ft)}} ACH 50 ​ = Conditioned Building Volume (cu ft) CFM 50 ​ × 60 ​

To determine the natural infiltration rate under normal atmospheric pressures ( ACH nat \text{ACH}_{\text{nat}} ACH nat ​ ), Manual J utilizes the LBL (Lawrence Berkeley Laboratory) N N N -Factor (typically N = 15 − 20 N = 15 - 20 N = 15 − 20 for North Carolina single-story/two-story homes with moderate shielding): ACH nat = ACH 50 N ⟺ CFM inf = Conditioned Volume × ACH nat 60 \text{ACH}_{\text{nat}} = \frac{\text{ACH}_{50}}{N} \quad \Longleftrightarrow \quad \text{CFM}_{\text{inf}} = \frac{\text{Conditioned Volume} \times \text{ACH}_{\text{nat}}}{60} ACH nat ​ = N ACH 50 ​ ​ ⟺ CFM inf ​ = 60 Conditioned Volume × ACH nat ​ ​

Manual J Infiltration Load Formulas

Sensible Infiltration Heat Load ( q sensible, inf q_{\text{sensible, inf}} q sensible, inf ​ ): q sensible, inf = 1.08 × CFM inf × Δ T q_{\text{sensible, inf}} = 1.08 \times \text{CFM}_{\text{inf}} \times \Delta T q sensible, inf ​ = 1.08 × CFM inf ​ × Δ T

Derivation of the constant 1.08 1.08 1.08 : 1.08 = 0.075 lb/cu ft (air density) × 0.24 BTU/(lb ⋅ ∘ F) (specific heat) × 60 min/hr 1.08 = 0.075\text{ lb/cu ft (air density)} \times 0.24\text{ BTU/(lb}\cdot^\circ\text{F) (specific heat)} \times 60\text{ min/hr} 1.08 = 0.075 lb/cu ft (air density) × 0.24 BTU/(lb ⋅ ∘ F) (specific heat) × 60 min/hr

Latent Infiltration Heat Load ( q latent, inf q_{\text{latent, inf}} q latent, inf ​ ): q latent, inf = 0.68 × CFM inf × Δ W q_{\text{latent, inf}} = 0.68 \times \text{CFM}_{\text{inf}} \times \Delta W q latent, inf ​ = 0.68 × CFM inf ​ × Δ W

Derivation of the constant 0.68 0.68 0.68 : 0.68 = 0.075 lb/cu ft × 1,061 BTU/lb (latent heat of water) 7,000 grains/lb × 60 min/hr 0.68 = 0.075\text{ lb/cu ft} \times \frac{1{,}061\text{ BTU/lb (latent heat of water)}}{7{,}000\text{ grains/lb}} \times 60\text{ min/hr} 0.68 = 0.075 lb/cu ft × 7 , 000 grains/lb 1 , 061 BTU/lb (latent heat of water) ​ × 60 min/hr

where Δ W = W outdoor − W indoor \Delta W = W_{\text{outdoor}} - W_{\text{indoor}} Δ W = W outdoor ​ − W indoor ​ in grains of moisture per pound of dry air \text{grains of moisture per pound of dry air} grains of moisture per pound of dry air .

Total Infiltration Heat Load ( q total, inf q_{\text{total, inf}} q total, inf ​ ): q total, inf = 4.5 × CFM inf × Δ h q_{\text{total, inf}} = 4.5 \times \text{CFM}_{\text{inf}} \times \Delta h q total, inf ​ = 4.5 × CFM inf ​ × Δ h

where Δ h = h outdoor − h indoor \Delta h = h_{\text{outdoor}} - h_{\text{indoor}} Δ h = h outdoor ​ − h indoor ​ is the enthalpy difference in BTU per pound of dry air \text{BTU per pound of dry air} BTU per pound of dry air , and 4.5 = 0.075 lb/cu ft × 60 min/hr 4.5 = 0.075\text{ lb/cu ft} \times 60\text{ min/hr} 4.5 = 0.075 lb/cu ft × 60 min/hr .

Mechanical Ventilation (ASHRAE 62.2 / NCRC)

Modern airtight building envelopes require continuous mechanical ventilation to maintain indoor air quality. Under ASHRAE Standard 62.2 and NCRC Section M1505 , continuous whole-house mechanical outdoor air ventilation rate ( CFM vent \text{CFM}_{\text{vent}} CFM vent ​ ) is calculated as: CFM vent = ( 0.03 × A floor ) + 7.5 × ( N bedrooms + 1 ) \text{CFM}_{\text{vent}} = (0.03 \times A_{\text{floor}}) + 7.5 \times (N_{\text{bedrooms}} + 1) CFM vent ​ = ( 0.03 × A floor ​ ) + 7.5 × ( N bedrooms ​ + 1 )

Example for a 2,400 sq ft 2{,}400\text{ sq ft} 2 , 400 sq ft , 3-bedroom home: CFM vent = ( 0.03 × 2,400 ) + 7.5 × ( 3 + 1 ) = 72 + 30 = 102 CFM \text{CFM}_{\text{vent}} = (0.03 \times 2{,}400) + 7.5 \times (3 + 1) = 72 + 30 = 102\text{ CFM} CFM vent ​ = ( 0.03 × 2 , 400 ) + 7.5 × ( 3 + 1 ) = 72 + 30 = 102 CFM

Ventilation Impact on Equipment Sizing

Direct Outdoor Air Intake: Introducing 102 CFM 102\text{ CFM} 102 CFM of raw outdoor air at Raleigh design conditions ( 92 ∘ F DB 92^\circ\text{F}\text{ DB} 9 2 ∘ F DB , 53 grains Δ W 53\text{ grains}\ \Delta W 53 grains Δ W ) adds:

Sensible load: 1.08 × 102 × 17 ∘ F = 1,873 BTU/h 1.08 \times 102 \times 17^\circ\text{F} = 1{,}873\text{ BTU/h} 1.08 × 102 × 1 7 ∘ F = 1 , 873 BTU/h

Latent load: 0.68 × 102 × 53 = 3,676 BTU/h 0.68 \times 102 \times 53 = 3{,}676\text{ BTU/h} 0.68 × 102 × 53 = 3 , 676 BTU/h

Total ventilation load penalty = 5,549 BTU/h 5{,}549\text{ BTU/h} 5 , 549 BTU/h (almost half a ton of cooling capacity!).

Energy Recovery Ventilators (ERV) / Heat Recovery Ventilators (HRV): An ERV transfers both sensible heat and moisture between outgoing exhaust air and incoming fresh air with an effectiveness of 65 % − 75 % 65\% - 75\% 65% − 75% , reducing the ventilation load penalty by over two-thirds.

Duct Heat Gain, Heat Loss & Leakage Multipliers

The location of air distribution ductwork dramatically affects system efficiency and equipment sizing: Duct Placement Thermal Comparison

  • ├── Ducts in Conditioned Space (Dropped ceilings, open-web floor trusses)
  • │ ├── Conduction Loss/Gain: 0 BTU/h (Heat exchange stays inside living envelope)
  • │ ├── Leakage Penalty: 0% capacity adder to outdoors
  • │ └── Result: Smallest equipment size, maximum comfort
  • └── Ducts in Unconditioned Attic (130°F - 140°F Summer Temp)
  • ├── Conduction Heat Gain: Hot attic air heats supply air 3°F - 6°F
  • ├── Duct Leakage: Supply air lost to attic; unconditioned air pulled into return
  • └── Result: 20% - 35% equipment capacity adder required
  • NC Energy Code Duct Mandates

Insulation: Supply and return ducts in unconditioned space and outdoors must be insulated to a minimum of R − 8 R-8 R − 8 under the North Carolina amendment to NCECC Section R403.3.1 — North Carolina does not use the lower R − 6 R-6 R − 6 tier that appears in the unamended IECC.

Duct Tightness Mandate: Under the North Carolina amendment to NCECC Section R403.3.3, the system complies if total duct leakage ≤ 5 CFM 25 \le 5\text{ CFM}_{25} ≤ 5 CFM 25 ​ per 100 sq ft 100\text{ sq ft} 100 sq ft of conditioned floor area served, or duct leakage to the outside ≤ 4 CFM 25 \le 4\text{ CFM}_{25} ≤ 4 CFM 25 ​ per 100 sq ft 100\text{ sq ft} 100 sq ft , tested at 25 Pascals 25\text{ Pascals} 25 Pascals ( 0.10 in. w.g. 0.10\text{ in. w.g.} 0.10 in. w.g. ).

Manual J Duct Multipliers: Duct heat gains and losses are applied using Duct Gain Factors (DGF) and Duct Loss Factors (DLF) based on duct surface area, insulation R R R -value, supply air temperature, and ambient attic/crawlspace temperature.

Total Block Load vs. Room-by-Room Load Synthesis

ACCA Manual J produces two distinct calculations for every building:

1. Total Building Block Load (Manual S Selection)

The Block Load is the instantaneous peak heating and cooling load for the entire building structure treated as a single unified zone.

Solar Diversity: East windows peak at 9:00 AM, while West windows peak at 4:00 PM. The Block Load accounts for this diversity by calculating the building-wide peak (typically occurring between 3:00 PM and 5:00 PM in North Carolina).

Sensible Heat Ratio (SHR): SHR = q sensible, total q sensible, total + q latent, total = q sensible, total q total \text{SHR} = \frac{q_{\text{sensible, total}}}{q_{\text{sensible, total}} + q_{\text{latent, total}}} = \frac{q_{\text{sensible, total}}}{q_{\text{total}}} SHR = q sensible, total ​ + q latent, total ​ q sensible, total ​ ​ = q total ​ q sensible, total ​ ​ Typical residential SHR values in North Carolina range from 0.72 to 0.82 0.72\text{ to } 0.82 0.72 to 0.82 . In humid coastal regions (Wilmington, Morehead City), the latent load is larger, driving SHR down toward 0.70 0.70 0.70 .

ACCA Manual S Equipment Sizing Rules

Air Conditioners & Heat Pumps (Cooling Mode): The total cooling capacity of the selected equipment must be between 95 % 95\% 95% and 115 % 115\% 115% of the calculated total cooling load ( 95 % ≤ Capacity ≤ 115 % 95\% \le \text{Capacity} \le 115\% 95% ≤ Capacity ≤ 115% ) for standard single-speed systems, or up to 125 % 125\% 125% for heat pumps or multi-stage / variable-capacity inverter systems to satisfy heating capacity balance points.

Latent Capacity Matching: The equipment selected must have a sensible capacity ≥ q sensible \ge q_{\text{sensible}} ≥ q sensible ​ and a latent capacity ≥ q latent \ge q_{\text{latent}} ≥ q latent ​ . Selecting a unit based purely on total tonnage without checking latent capacity in humid North Carolina climates will cause indoor humidity control failure.

2. Room-by-Room Peak Loads (Manual D Airflow Distribution)

While the primary heating and cooling unit is sized to the unified Block Load, the individual supply duct branches must be sized to handle the individual peak room loads (which occur at different times of day): CFM room = q sensible, room 1.08 × ( T room − T supply ) \text{CFM}_{\text{room}} = \frac{q_{\text{sensible, room}}}{1.08 \times (T_{\text{room}} - T_{\text{supply}})} CFM room ​ = 1.08 × ( T room ​ − T supply ​ ) q sensible, room ​ ​

Assuming standard cooling supply air temperature of 55 ∘ F 55^\circ\text{F} 5 5 ∘ F and room setpoint of 75 ∘ F 75^\circ\text{F} 7 5 ∘ F ( Δ T supply = 20 ∘ F \Delta T_{\text{supply}} = 20^\circ\text{F} Δ T supply ​ = 2 0 ∘ F ): CFM room = q sensible, room 1.08 × 20 = q sensible, room 21.6 \text{CFM}_{\text{room}} = \frac{q_{\text{sensible, room}}}{1.08 \times 20} = \frac{q_{\text{sensible, room}}}{21.6} CFM room ​ = 1.08 × 20 q sensible, room ​ ​ = 21.6 q sensible, room ​ ​

  • Step-by-Step Synthesis: Total Block Load & Equipment Sizing
  • Problem Data Summary (Raleigh, NC Residence)
  • Opaque Envelope Sensible Gain: 12,400 BTU/h 12{,}400\text{ BTU/h} 12 , 400 BTU/h
  • Fenestration Conduction Gain: 2,800 BTU/h 2{,}800\text{ BTU/h} 2 , 800 BTU/h
  • Fenestration Solar Gain (Diversified Block Peak): 5,600 BTU/h 5{,}600\text{ BTU/h} 5 , 600 BTU/h
  • Internal Sensible Gains (Occupants + Appliances + Lighting): 3,200 BTU/h 3{,}200\text{ BTU/h} 3 , 200 BTU/h

Infiltration Sensible Gain ( 40 CFM inf 40\text{ CFM}_{\text{inf}} 40 CFM inf ​ @ Δ T = 17 ∘ F \Delta T = 17^\circ\text{F} Δ T = 1 7 ∘ F ): 1.08 × 40 × 17 = 734 BTU/h 1.08 \times 40 \times 17 = 734\text{ BTU/h} 1.08 × 40 × 17 = 734 BTU/h

  • Duct Sensible Heat Gain (R-8 in Attic): 3,200 BTU/h 3{,}200\text{ BTU/h} 3 , 200 BTU/h
  • Internal Latent Gains (4 Occupants): 800 BTU/h 800\text{ BTU/h} 800 BTU/h

Infiltration Latent Gain ( 40 CFM inf 40\text{ CFM}_{\text{inf}} 40 CFM inf ​ @ Δ W = 53 gr/lb \Delta W = 53\text{ gr/lb} Δ W = 53 gr/lb ): 0.68 × 40 × 53 = 1,442 BTU/h 0.68 \times 40 \times 53 = 1{,}442\text{ BTU/h} 0.68 × 40 × 53 = 1 , 442 BTU/h

Duct Latent Leakage Gain: 650 BTU/h 650\text{ BTU/h} 650 BTU/h

Step 1: Calculate Total Sensible Cooling Load ( q sensible q_{\text{sensible}} q sensible ​ ) q sensible = 12,400 + 2,800 + 5,600 + 3,200 + 734 + 3,200 = 27,934 BTU/h q_{\text{sensible}} = 12{,}400 + 2{,}800 + 5{,}600 + 3{,}200 + 734 + 3{,}200 = 27{,}934\text{ BTU/h} q sensible ​ = 12 , 400 + 2 , 800 + 5 , 600 + 3 , 200 + 734 + 3 , 200 = 27 , 934 BTU/h

Step 2: Calculate Total Latent Cooling Load ( q latent q_{\text{latent}} q latent ​ ) q latent = 800 + 1,442 + 650 = 2,892 BTU/h q_{\text{latent}} = 800 + 1{,}442 + 650 = 2{,}892\text{ BTU/h} q latent ​ = 800 + 1 , 442 + 650 = 2 , 892 BTU/h

Step 3: Calculate Total Cooling Load ( q total q_{\text{total}} q total ​ ) & Sensible Heat Ratio (SHR) q total = 27,934 + 2,892 = 30,826 BTU/h ( 2.57 Tons ) q_{\text{total}} = 27{,}934 + 2{,}892 = 30{,}826\text{ BTU/h} \quad (2.57\text{ Tons}) q total ​ = 27 , 934 + 2 , 892 = 30 , 826 BTU/h ( 2.57 Tons ) SHR = 27,934 30,826 = 0.906 \text{SHR} = \frac{27{,}934}{30{,}826} = 0.906 SHR = 30 , 826 27 , 934 ​ = 0.906

Step 4: ACCA Manual S Equipment Sizing Range

Lower Limit ( 95 % 95\% 95% of load): 0.95 × 30,826 = 29,285 BTU/h 0.95 \times 30{,}826 = 29{,}285\text{ BTU/h} 0.95 × 30 , 826 = 29 , 285 BTU/h ( 2.44 Tons 2.44\text{ Tons} 2.44 Tons )

Upper Limit ( 115 % 115\% 115% of load): 1.15 × 30,826 = 35,450 BTU/h 1.15 \times 30{,}826 = 35{,}450\text{ BTU/h} 1.15 × 30 , 826 = 35 , 450 BTU/h ( 2.95 Tons 2.95\text{ Tons} 2.95 Tons )

Selected Equipment: A nominal 2.5 -Ton 2.5\text{-Ton} 2.5 -Ton ( 30,000 BTU/h 30{,}000\text{ BTU/h} 30 , 000 BTU/h ) or 3.0 -Ton 3.0\text{-Ton} 3.0 -Ton multi-stage unit satisfies Manual S sizing criteria perfectly.

Step 5: Calculate Total System Cooling Airflow Requirement Total CFM = q sensible 1.08 × Δ T supply = 27,934 1.08 × 20 = 27,934 21.6 = 1,293 CFM \text{Total CFM} = \frac{q_{\text{sensible}}}{1.08 \times \Delta T_{\text{supply}}} = \frac{27{,}934}{1.08 \times 20} = \frac{27{,}934}{21.6} = 1{,}293\text{ CFM} Total CFM = 1.08 × Δ T supply ​ q sensible ​ ​ = 1.08 × 20 27 , 934 ​ = 21.6 27 , 934 ​ = 1 , 293 CFM

(Equates to approximately 431 CFM per ton 431\text{ CFM per ton} 431 CFM per ton of cooling capacity, consistent with the standard 400 CFM/ton rule for humid Southern climates).

Loading diagram... Integrated ACCA Design Suite Workflow (Manual J -> Manual S -> Manual D)