12.4 System Commissioning, Testing, Adjusting & Balancing (TAB)

North Carolina HVAC Contractor License Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: North Carolina HVAC Licensing Framework & Board Jurisprudence

1.1 NC Dual-Board Regulatory Structure & General Statutes 1.2 Heating Classifications, Groups & Scopes 1.3 Examination Prerequisites, Qualifier Responsibilities & Disciplinary Rules 1.4 Examination Logistics, Reference Books & Code Editions

2 Chapter 2: North Carolina Business Organizations, Contracts & Lien Law

2.1 Construction Contracts, Project Management & Bidding 2.2 North Carolina Mechanics' Lien Law & Bond Claims 2.3 Business Organizations, Financial Management & Taxation

3 Chapter 3: Construction Safety, Electrical Safety & EPA 608

3.1 OSHA 1926 Construction Safety & Job Site Protocols 3.2 Electrical Safety, NFPA 70E & Lockout/Tagout (LOTO) 3.3 EPA Section 608 & Refrigerant Transition Regulations

4 Chapter 4: Thermodynamics, Refrigeration Cycle & Psychrometrics

4.1 Fundamentals of Thermodynamics & Heat Transfer 4.2 The Mechanical Refrigeration Cycle & Component Dynamics 4.3 Psychrometric Properties, Air Processes & Chart Navigation

5 Chapter 5: ACCA Manual J & Manual N Load Calculations

5.1 Manual J Design Conditions & Thermal Parameters 5.2 Fenestration, Opaque Envelope & Internal Heat Gains 5.3 Infiltration, Duct Losses & Total Block Load Synthesis 5.4 ACCA Manual N Commercial Load Calculation

6 Chapter 6: ACCA Manual D & Manual Q Duct Design & Air Distribution

6.1 Fan Laws, Airflow Dynamics & Total External Static Pressure 6.2 ACCA Manual D Sizing Protocol & Friction Rate Calculation 6.3 SMACNA Duct Construction, Fittings & Air Balancing 6.4 ACCA Manual Q Commercial Low-Pressure Duct Design

7 Chapter 7: Forced Air Heating, Gas Furnaces & Fuel Piping

7.1 Natural Gas & Propane Combustion Fundamentals 7.2 Gas Furnace Operation, Sequence of Control & Diagnostics 7.3 Fuel Oil Heating Systems & Code-Compliant Fuel Gas Piping

8 Chapter 8: Heat Pumps, Inverters & Commercial System Selection (Manual CS)

8.1 Heat Pump Operating Principles, Reversing Valves & Physics 8.2 Defrost Controls, Supplemental Electric Heat & Balance Points 8.3 Inverter Mini-Splits & Variable Refrigerant Flow (VRF) Systems 8.4 Manual CS: Commercial Applications, Systems & Equipment

9 Chapter 9: Hydronic Heating, Steam Systems & Boilers (H1)

9.1 Hydronic Fundamentals, Boiler Classifications & Steam Systems 9.2 Hydronic Piping Layouts, Circulator Pumps & Head Loss Calculations 9.3 Boiler Trim, Expansion Tanks, Air Elimination & Safety Controls 9.4 The NC Uniform Boiler & Pressure Vessel Act (H1 Reference)

10 Chapter 10: Commercial Refrigeration & NC Board Regulations

10.1 NC State Board of Refrigeration Contractors Statutes & Licensure 10.2 Commercial Refrigeration Systems, Multiplex Racks & Defrost Protocols 10.3 Walk-In Coolers, Freezers, Evaporator Pressure Regulators & Valves

11 Chapter 11: NC Administration, Mechanical, Fuel Gas & Energy Codes

11.1 North Carolina Mechanical Code: Equipment Access, Clearances & Condensate 11.2 Ventilation Rates, Exhaust Systems & Duct Smoke Detection 11.3 NC Fuel Gas Code: Combustion Air, Venting & Gas Appliance Installation 11.4 NC Energy Conservation Code: Duct Testing, Envelope & Efficiency Standards 11.5 NC Administrative Code & Policies: Permits, Inspections & Plan Review

12 Chapter 12: Electrical Fundamentals, Motor Controls & Diagnostics

12.1 HVAC Electrical Fundamentals, Circuit Schematics & Power Distribution 12.2 Electric Motors, Capacitors & Motor Controls 12.3 Systematic HVAC Diagnostics, Superheat/Subcooling & Airflow Troubleshooting 12.4 System Commissioning, Testing, Adjusting & Balancing (TAB)

12.4 System Commissioning, Testing, Adjusting & Balancing (TAB)

Key Takeaways Explain This Topic AI

System commissioning and TAB follow ASHRAE Standard 111 and ACCA Quality Installation (ANSI/ACCA 5 QI) standards to verify design airflow, static pressures, electrical operating limits, and proper refrigerant charge.

Total External Static Pressure (TESP) is measured across the air handler/furnace (Supply Plenum SP minus Return Plenum SP) and compared to manufacturer blower performance tables to determine actual operating system CFM.

The Fan Laws define the mathematical relationships of air distribution: Airflow (CFM) varies directly with RPM, Static Pressure varies with the square of RPM, and Fan Power (Brake Horsepower) varies with the cube of RPM.

Duct velocity and airflow volume are measured using pitot tube duct traverses based on the velocity pressure formula: V = 4,005 · √(Pv), with CFM = Duct Area (sq ft) · Average Velocity (FPM).

The North Carolina Energy Conservation Code and NC Mechanical Code mandate verified duct leakage limits (tested via duct pressurization at 25 Pascals to meet CFM25 / 100 sq ft CFA thresholds) and functional testing of economizers and ventilation systems.

Last updated: August 2026

System Commissioning, Testing, Adjusting & Balancing (TAB)

Core TAB Principle: Design engineering on paper is only as good as physical field execution. Testing, Adjusting, and Balancing (TAB) and structured System Commissioning (Cx) per ASHRAE Standard 111 , ACCA Standard 5 (ANSI/ACCA QI) , and the North Carolina Energy Conservation Code ensure that air and hydronic distribution systems deliver exact design airflow, design thermal capacity, proper indoor air quality (IAQ), and maximum energy efficiency.

Total External Static Pressure (TESP) & Airflow Determination

Total External Static Pressure (TESP) is the total resistance that the air distribution duct system (supply ducts, return ducts, filters, coils, registers) imposes on the indoor blower fan. [ Return Duct ]

  • |
  • v
  • (P_return) [ Static Probe 1 ] (Entering Air Handler / Before Blower)
  • |
  • [ Air Filter ]
  • |
  • [ Blower Motor ]
  • |
  • [ Heating Elements / Heat Exchanger ]
  • |
  • (P_supply) [ Static Probe 2 ] (Leaving Air Handler / Before A-Coil)
  • |
  • [ Evaporator Coil ]
  • |
  • v
  • [ Supply Plenum ]

1. The TESP Calculation Formula TESP = ∣ P supply ∣ + ∣ P return ∣ \text{TESP} = |P_{\text{supply}}| + |P_{\text{return}}| TESP = ∣ P supply ​ ∣ + ∣ P return ​ ∣

Measurement Protocol: Using a calibrated dual-port digital manometer and static pressure tips pointing directly into the airstream:

P return P_{\text{return}} P return ​ is measured in the return plenum between the air filter and the blower inlet (typically a negative pressure, e.g., − 0.25 in. w.c. -0.25\text{ in. w.c.} − 0.25 in. w.c. ). Drop the negative sign and take the absolute value.

P supply P_{\text{supply}} P supply ​ is measured in the supply plenum downstream of the furnace/air handler (typically a positive pressure, e.g., + 0.25 in. w.c. +0.25\text{ in. w.c.} + 0.25 in. w.c. ). In electric air handlers with internal coils, measure after the coil; in gas furnaces with cased uncased add-on coils, measure between furnace and coil to isolate furnace TESP from coil pressure drop. TESP = ∣ − 0.25 in. w.c. ∣ + ∣ + 0.25 in. w.c. ∣ = 0.50 in. w.c. \text{TESP} = |-0.25\text{ in. w.c.}| + |+0.25\text{ in. w.c.}| = 0.50\text{ in. w.c.} TESP = ∣ − 0.25 in. w.c. ∣ + ∣ + 0.25 in. w.c. ∣ = 0.50 in. w.c.

2. Interpreting Manufacturer Blower Performance Tables

Once TESP is measured, the technician references the manufacturer's engineering blower performance chart for the specific motor speed tap or ECM profile to determine delivered CFM:

Sample Blower Performance Table (CFM vs. TESP in inches w.c.)

Motor Speed Tap 0.10 in. w.c. 0.10\text{ in. w.c.} 0.10 in. w.c. 0.20 in. w.c. 0.20\text{ in. w.c.} 0.20 in. w.c. 0.30 in. w.c. 0.30\text{ in. w.c.} 0.30 in. w.c. 0.40 in. w.c. 0.40\text{ in. w.c.} 0.40 in. w.c. 0.50 in. w.c. 0.50\text{ in. w.c.} 0.50 in. w.c. 0.60 in. w.c. 0.60\text{ in. w.c.} 0.60 in. w.c. 0.70 in. w.c. 0.70\text{ in. w.c.} 0.70 in. w.c. 0.80 in. w.c. 0.80\text{ in. w.c.} 0.80 in. w.c.

Low (Red) 850 850 850 820 820 820 780 780 780 740 740 740 690 690 690 630 630 630 560 560 560 480 480 480

Med-Low (Yellow) 1 , 120 1,120 1 , 120 1 , 080 1,080 1 , 080 1 , 040 1,040 1 , 040 990 990 990 930 930 930 860 860 860 780 780 780 690 690 690

Med-High (Blue) 1 , 380 1,380 1 , 380 1 , 340 1,340 1 , 340 1 , 290 1,290 1 , 290 1 , 230 1,230 1 , 230 1 , 170 1,170 1 , 170 1 , 090 1,090 1 , 090 1 , 000 1,000 1 , 000 890 890 890

High (Black) 1 , 620 1,620 1 , 620 1 , 570 1,570 1 , 570 1 , 510 1,510 1 , 510 1 , 440 1,440 1 , 440 1 , 360 1,360 1 , 360 1 , 270 1,270 1 , 270 1 , 160 1,160 1 , 160 1 , 030 1,030 1 , 030

Standard Rule: Residential cooling systems require 350 to 450 CFM per ton 350\text{ to }450\text{ CFM per ton} 350 to 450 CFM per ton ( 400 CFM/ton 400\text{ CFM/ton} 400 CFM/ton nominal in North Carolina's humid climate to balance sensible cooling and latent dehumidification).

Quantitative Airflow Measurement Methods

When blower tables are unavailable or duct geometry requires physical verification, three primary engineering methods are used:

1. Electric Resistance Heat Temperature Rise Method

Because electric resistance strip heaters convert electrical energy into heat at 100 % 100\% 100% efficiency ( 1 kW = 3 , 412.14 BTU/hr 1\text{ kW} = 3,412.14\text{ BTU/hr} 1 kW = 3 , 412.14 BTU/hr ), measured temperature rise and electric power provide an exact calculation of system CFM: Q sensible = Volts × Amps × 3.41214 = kW × 3 , 412.14 Q_{\text{sensible}} = \text{Volts} \times \text{Amps} \times 3.41214 = \text{kW} \times 3,412.14 Q sensible ​ = Volts × Amps × 3.41214 = kW × 3 , 412.14 Q sensible = 1.08 × CFM × Δ T Q_{\text{sensible}} = 1.08 \times \text{CFM} \times \Delta T Q sensible ​ = 1.08 × CFM × Δ T CFM = Volts × Amps × 3.41214 1.08 × Δ T = kW × 3 , 412.14 1.08 × ( T supply − T return ) \text{CFM} = \frac{\text{Volts} \times \text{Amps} \times 3.41214}{1.08 \times \Delta T} = \frac{\text{kW} \times 3,412.14}{1.08 \times (T_{\text{supply}} - T_{\text{return}})} CFM = 1.08 × Δ T Volts × Amps × 3.41214 ​ = 1.08 × ( T supply ​ − T return ​ ) kW × 3 , 412.14 ​

Where 1.08 1.08 1.08 is the sensible heat constant for standard air density ( 0.075 lb/ft 3 × 0.24 BTU/(lb ⋅ ∘ F) × 60 min/hr 0.075\text{ lb/ft}^3 \times 0.24\text{ BTU/(lb}\cdot^\circ\text{F)} \times 60\text{ min/hr} 0.075 lb/ft 3 × 0.24 BTU/(lb ⋅ ∘ F) × 60 min/hr ). (For high-altitude adjustments, use c p ⋅ ρ ⋅ 60 c_p \cdot \rho \cdot 60 c p ​ ⋅ ρ ⋅ 60 ).

2. Pitot Tube Duct Traverse & Velocity Pressure ( P v P_v P v ​ )

A Pitot tube connected to a digital manometer senses Total Pressure ( P t P_t P t ​ ) through its open impact tip and Static Pressure ( P s P_s P s ​ ) through its side radial ports. The manometer calculates Velocity Pressure ( P v P_v P v ​ ) : P v = P t − P s P_v = P_t - P_s P v ​ = P t ​ − P s ​ Air Velocity ( V in FPM ) = 4 , 005 × P v \text{Air Velocity } (V\text{ in FPM}) = 4,005 \times \sqrt{P_v} Air Velocity ( V in FPM ) = 4 , 005 × P v ​ ​ Airflow Volume ( CFM ) = Duct Cross-Sectional Area ( sq ft ) × V average \text{Airflow Volume } (\text{CFM}) = \text{Duct Cross-Sectional Area } (\text{sq ft}) \times V_{\text{average}} Airflow Volume ( CFM ) = Duct Cross-Sectional Area ( sq ft ) × V average ​ ASHRAE 111 Duct Traverse Grid Methods:

├── Round Ducts: Log-Tchebycheff Rule or Equal Area Method (Min 12 to 20 traverse points across 2 perpendicular diameters)

└── Rectangular Ducts: Minimum 16 to 64 traverse grid points centered in equal rectangular areas.

The Governing Fan Laws & Sheave Sizing

The Fan Laws govern all aerodynamic performance changes in commercial and residential centrifugal and axial fans when motor speed, pulley diameter, or duct static pressures are altered. +-----------------------------------------------------------------------------------------+

  • | THE GOVERNING FAN LAWS |
  • +-----------------------------------------------------------------------------------------+
  • | Fan Law 1 (Airflow vs Speed): CFM_2 / CFM_1 = RPM_2 / RPM_1 |
  • | Fan Law 2 (Static Press vs Speed): SP_2 / SP_1 = (RPM_2 / RPM_1)² = (CFM_2 / CFM_1)² |
  • | Fan Law 3 (Power vs Speed): BHP_2 / BHP_1 = (RPM_2 / RPM_1)³ = (CFM_2 / CFM_1)³ |
  • +-----------------------------------------------------------------------------------------+
  • The Critical Cubic Power Relationship (Fan Law 3)

Warning

Fan Law 3 Mandate: Blower fan Brake Horsepower ( BHP ) increases with the CUBE of the speed ratio ( ( RPM 2 / RPM 1 ) 3 (\text{RPM}_2 / \text{RPM}_1)^3 ( RPM 2 ​ / RPM 1 ​ ) 3 ). A modest 20 % 20\% 20% increase in airflow ( 1.20 × CFM 1.20\times\text{CFM} 1.20 × CFM ) requires an 72.8 % 72.8\% 72.8% increase in motor horsepower ( 1.20 3 = 1.728 1.20^3 = 1.728 1.2 0 3 = 1.728 ). Attempting to solve airflow deficits by simply speeding up a belt-driven blower will rapidly overload the motor, causing nuisance overcurrent trips or winding burnout unless motor horsepower is upgraded.

Pulley (Sheave) Sizing Formula

For belt-driven commercial fans: D fan × RPM fan = D motor × RPM motor D_{\text{fan}} \times \text{RPM}_{\text{fan}} = D_{\text{motor}} \times \text{RPM}_{\text{motor}} D fan ​ × RPM fan ​ = D motor ​ × RPM motor ​ D motor = D fan × RPM fan RPM motor ⟺ RPM fan = RPM motor × ( D motor D fan ) D_{\text{motor}} = \frac{D_{\text{fan}} \times \text{RPM}_{\text{fan}}}{\text{RPM}_{\text{motor}}} \quad \iff \quad \text{RPM}_{\text{fan}} = \text{RPM}_{\text{motor}} \times \left(\frac{D_{\text{motor}}}{D_{\text{fan}}}\right) D motor ​ = RPM motor ​ D fan ​ × RPM fan ​ ​ ⟺ RPM fan ​ = RPM motor ​ × ( D fan ​ D motor ​ ​ )

Where D fan D_{\text{fan}} D fan ​ is pitch diameter of fan pulley and D motor D_{\text{motor}} D motor ​ is pitch diameter of motor pulley.

North Carolina Energy Code & Mechanical Code Commissioning Mandates

Under the North Carolina Energy Conservation Code (NCECC) and NC Mechanical Code (NCMC Chapter 4 & 6) , contractors must execute verified commissioning: NC Building Code Commissioning Checkpoints:

├── 1. Duct Leakage Pressurization Testing (Total Leakage ≤ 5 CFM25 per 100 sq ft CFA

│ or Leakage to Outdoors ≤ 4 CFM25 per 100 sq ft CFA when tested at 25 Pascals).

├── 2. Ventilation Verification (ASHRAE 62.2 / NCMC Chapter 4 mechanical outdoor air rates).

├── 3. Economizer Functional Testing (Air-side economizers must modulate dampers to 100%

│ outdoor air when ambient conditions permit free cooling, with verified sensor calibration).

└── 4. Refrigerant Charge Verification (Subcooling verified within ± 3°F of nameplate on TXV

systems; Superheat within ± 5°F of manufacturer target chart on fixed orifice systems).

  • Step-by-Step Worked Technical Examples
  • Example 1: Electric Heat Temperature Rise Airflow Calculation

Problem: A technician commissions a 3.5-ton split-system heat pump with an electric resistance strip heater. With only the electric heat operating, the technician measures:

  • Operating Line Voltage: 240.0 V 240.0\text{ V} 240.0 V
  • Total Heater Element Current: 40.5 A 40.5\text{ A} 40.5 A
  • Return Air Temperature entering air handler: 68.0 ∘ F 68.0^\circ\text{F} 68. 0 ∘ F
  • Supply Air Temperature leaving air handler: 92.5 ∘ F 92.5^\circ\text{F} 92. 5 ∘ F

Calculate: (1) Total electric heat output in Watts \text{Watts} Watts and BTU/hr \text{BTU/hr} BTU/hr , (2) Air temperature rise ( Δ T \Delta T Δ T ), and (3) Actual delivered system airflow in CFM \text{CFM} CFM .

Solution:

Calculate Heat Output in Watts and BTU/hr: P = V × I = 240.0 V × 40.5 A = 9 , 720.0 Watts = 9.72 kW P = V \times I = 240.0\text{ V} \times 40.5\text{ A} = 9,720.0\text{ Watts} = 9.72\text{ kW} P = V × I = 240.0 V × 40.5 A = 9 , 720.0 Watts = 9.72 kW Q sensible = 9 , 720 W × 3.41214 BTU/Wh = 33 , 166.0 BTU/hr Q_{\text{sensible}} = 9,720\text{ W} \times 3.41214\text{ BTU/Wh} = 33,166.0\text{ BTU/hr} Q sensible ​ = 9 , 720 W × 3.41214 BTU/Wh = 33 , 166.0 BTU/hr

Calculate Air Temperature Rise ( Δ T \Delta T Δ T ): Δ T = T supply − T return = 92.5 ∘ F − 68.0 ∘ F = 24.5 ∘ F \Delta T = T_{\text{supply}} - T_{\text{return}} = 92.5^\circ\text{F} - 68.0^\circ\text{F} = 24.5^\circ\text{F} Δ T = T supply ​ − T return ​ = 92. 5 ∘ F − 68. 0 ∘ F = 24. 5 ∘ F

Calculate System Delivered Airflow (CFM): CFM = Q sensible 1.08 × Δ T = 33 , 166.0 BTU/hr 1.08 × 24.5 ∘ F = 33 , 166.0 26.46 = 1 , 253.4 CFM \text{CFM} = \frac{Q_{\text{sensible}}}{1.08 \times \Delta T} = \frac{33,166.0\text{ BTU/hr}}{1.08 \times 24.5^\circ\text{F}} = \frac{33,166.0}{26.46} = 1,253.4\text{ CFM} CFM = 1.08 × Δ T Q sensible ​ ​ = 1.08 × 24. 5 ∘ F 33 , 166.0 BTU/hr ​ = 26.46 33 , 166.0 ​ = 1 , 253.4 CFM

Normalized per ton: 1 , 253.4 CFM / 3.5 tons = 358.1 CFM/ton 1,253.4\text{ CFM} / 3.5\text{ tons} = 358.1\text{ CFM/ton} 1 , 253.4 CFM /3.5 tons = 358.1 CFM/ton (acceptable for dehumidification in NC).

Example 2: Fan Laws and Sheave Sizing for Commercial Air Handler

Problem: A commercial belt-drive air handler in Greensboro, NC currently delivers 3 , 200 CFM 3,200\text{ CFM} 3 , 200 CFM at a measured fan speed of 650 RPM 650\text{ RPM} 650 RPM , with a measured static pressure of 0.80 in. w.c. 0.80\text{ in. w.c.} 0.80 in. w.c. and motor brake horsepower of 1.80 BHP 1.80\text{ BHP} 1.80 BHP . The design specification requires increasing airflow to 3 , 800 CFM 3,800\text{ CFM} 3 , 800 CFM .

Calculate: (1) New fan RPM required, (2) New system static pressure, (3) New brake horsepower required, and (4) The required motor pulley diameter if the motor spins at 1 , 725 RPM 1,725\text{ RPM} 1 , 725 RPM and the fan pulley diameter is 9.0 inches 9.0\text{ inches} 9.0 inches .

Solution:

Calculate New Fan RPM (Fan Law 1): RPM 2 = RPM 1 × ( CFM 2 CFM 1 ) = 650 RPM × ( 3 , 800 3 , 200 ) = 650 × 1.1875 = 771.9 RPM \text{RPM}_2 = \text{RPM}_1 \times \left(\frac{\text{CFM}_2}{\text{CFM}_1}\right) = 650\text{ RPM} \times \left(\frac{3,800}{3,200}\right) = 650 \times 1.1875 = 771.9\text{ RPM} RPM 2 ​ = RPM 1 ​ × ( CFM 1 ​ CFM 2 ​ ​ ) = 650 RPM × ( 3 , 200 3 , 800 ​ ) = 650 × 1.1875 = 771.9 RPM

Calculate New Static Pressure (Fan Law 2): SP 2 = SP 1 × ( CFM 2 CFM 1 ) 2 = 0.80 × ( 1.1875 ) 2 = 0.80 × 1.4102 = 1.128 in. w.c. \text{SP}_2 = \text{SP}_1 \times \left(\frac{\text{CFM}_2}{\text{CFM}_1}\right)^2 = 0.80 \times (1.1875)^2 = 0.80 \times 1.4102 = 1.128\text{ in. w.c.} SP 2 ​ = SP 1 ​ × ( CFM 1 ​ CFM 2 ​ ​ ) 2 = 0.80 × ( 1.1875 ) 2 = 0.80 × 1.4102 = 1.128 in. w.c.

Calculate New Brake Horsepower (Fan Law 3): BHP 2 = BHP 1 × ( CFM 2 CFM 1 ) 3 = 1.80 BHP × ( 1.1875 ) 3 = 1.80 × 1.6746 = 3.01 BHP \text{BHP}_2 = \text{BHP}_1 \times \left(\frac{\text{CFM}_2}{\text{CFM}_1}\right)^3 = 1.80\text{ BHP} \times (1.1875)^3 = 1.80 \times 1.6746 = 3.01\text{ BHP} BHP 2 ​ = BHP 1 ​ × ( CFM 1 ​ CFM 2 ​ ​ ) 3 = 1.80 BHP × ( 1.1875 ) 3 = 1.80 × 1.6746 = 3.01 BHP

(Note: The existing 2.0 HP 2.0\text{ HP} 2.0 HP motor must be upgraded to a 3.0 HP 3.0\text{ HP} 3.0 HP or 5.0 HP 5.0\text{ HP} 5.0 HP motor to prevent overload burnout!)

Calculate Required Motor Pulley Diameter ( D motor D_{\text{motor}} D motor ​ ): D motor = D fan × RPM fan RPM motor = 9.0 in. × 771.9 RPM 1 , 725 RPM = 6 , 947.1 1 , 725 = 4.03 inches D_{\text{motor}} = \frac{D_{\text{fan}} \times \text{RPM}_{\text{fan}}}{\text{RPM}_{\text{motor}}} = \frac{9.0\text{ in.} \times 771.9\text{ RPM}}{1,725\text{ RPM}} = \frac{6,947.1}{1,725} = 4.03\text{ inches} D motor ​ = RPM motor ​ D fan ​ × RPM fan ​ ​ = 1 , 725 RPM 9.0 in. × 771.9 RPM ​ = 1 , 725 6 , 947.1 ​ = 4.03 inches

Install an adjustable 3.8 " − 4.4 " 3.8" - 4.4" 3.8" − 4.4" pitch diameter motor sheave adjusted to 4.03 " 4.03" 4.03" .

Example 3: Pitot Tube Duct Traverse Air Velocity & Volume

Problem: A technician traverses a 24 " × 16 " 24" \times 16" 24" × 16" rectangular supply trunk duct with a Pitot tube. The average of 16 velocity pressure readings is P v , avg = 0.09 in. w.c. P_{v,\text{avg}} = 0.09\text{ in. w.c.} P v , avg ​ = 0.09 in. w.c.

Calculate: (1) Average duct air velocity in Feet Per Minute (FPM), (2) Duct cross-sectional area in square feet, and (3) Total volumetric airflow in CFM.

Solution:

Calculate Average Air Velocity: V = 4 , 005 × P v = 4 , 005 × 0.09 = 4 , 005 × 0.30 = 1 , 201.5 FPM V = 4,005 \times \sqrt{P_v} = 4,005 \times \sqrt{0.09} = 4,005 \times 0.30 = 1,201.5\text{ FPM} V = 4 , 005 × P v ​ ​ = 4 , 005 × 0.09 ​ = 4 , 005 × 0.30 = 1 , 201.5 FPM

Calculate Duct Cross-Sectional Area: Area = 24 in. × 16 in. 144 sq in./sq ft = 384 144 = 2.667 sq ft \text{Area} = \frac{24\text{ in.} \times 16\text{ in.}}{144\text{ sq in./sq ft}} = \frac{384}{144} = 2.667\text{ sq ft} Area = 144 sq in./sq ft 24 in. × 16 in. ​ = 144 384 ​ = 2.667 sq ft

Calculate Total Volumetric Airflow (CFM): CFM = Area × V = 2.667 sq ft × 1 , 201.5 FPM = 3 , 204.0 CFM \text{CFM} = \text{Area} \times V = 2.667\text{ sq ft} \times 1,201.5\text{ FPM} = 3,204.0\text{ CFM} CFM = Area × V = 2.667 sq ft × 1 , 201.5 FPM = 3 , 204.0 CFM

Loading diagram... Airflow Measurement & Static Pressure Testing Points