8.2 Defrost Controls, Supplemental Electric Heat & Balance Points
North Carolina HVAC Contractor License Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: North Carolina HVAC Licensing Framework & Board Jurisprudence
1.1 NC Dual-Board Regulatory Structure & General Statutes 1.2 Heating Classifications, Groups & Scopes 1.3 Examination Prerequisites, Qualifier Responsibilities & Disciplinary Rules 1.4 Examination Logistics, Reference Books & Code Editions
2 Chapter 2: North Carolina Business Organizations, Contracts & Lien Law
2.1 Construction Contracts, Project Management & Bidding 2.2 North Carolina Mechanics' Lien Law & Bond Claims 2.3 Business Organizations, Financial Management & Taxation
3 Chapter 3: Construction Safety, Electrical Safety & EPA 608
3.1 OSHA 1926 Construction Safety & Job Site Protocols 3.2 Electrical Safety, NFPA 70E & Lockout/Tagout (LOTO) 3.3 EPA Section 608 & Refrigerant Transition Regulations
4 Chapter 4: Thermodynamics, Refrigeration Cycle & Psychrometrics
4.1 Fundamentals of Thermodynamics & Heat Transfer 4.2 The Mechanical Refrigeration Cycle & Component Dynamics 4.3 Psychrometric Properties, Air Processes & Chart Navigation
5 Chapter 5: ACCA Manual J & Manual N Load Calculations
5.1 Manual J Design Conditions & Thermal Parameters 5.2 Fenestration, Opaque Envelope & Internal Heat Gains 5.3 Infiltration, Duct Losses & Total Block Load Synthesis 5.4 ACCA Manual N Commercial Load Calculation
6 Chapter 6: ACCA Manual D & Manual Q Duct Design & Air Distribution
6.1 Fan Laws, Airflow Dynamics & Total External Static Pressure 6.2 ACCA Manual D Sizing Protocol & Friction Rate Calculation 6.3 SMACNA Duct Construction, Fittings & Air Balancing 6.4 ACCA Manual Q Commercial Low-Pressure Duct Design
7 Chapter 7: Forced Air Heating, Gas Furnaces & Fuel Piping
7.1 Natural Gas & Propane Combustion Fundamentals 7.2 Gas Furnace Operation, Sequence of Control & Diagnostics 7.3 Fuel Oil Heating Systems & Code-Compliant Fuel Gas Piping
8 Chapter 8: Heat Pumps, Inverters & Commercial System Selection (Manual CS)
8.1 Heat Pump Operating Principles, Reversing Valves & Physics 8.2 Defrost Controls, Supplemental Electric Heat & Balance Points 8.3 Inverter Mini-Splits & Variable Refrigerant Flow (VRF) Systems 8.4 Manual CS: Commercial Applications, Systems & Equipment
9 Chapter 9: Hydronic Heating, Steam Systems & Boilers (H1)
9.1 Hydronic Fundamentals, Boiler Classifications & Steam Systems 9.2 Hydronic Piping Layouts, Circulator Pumps & Head Loss Calculations 9.3 Boiler Trim, Expansion Tanks, Air Elimination & Safety Controls 9.4 The NC Uniform Boiler & Pressure Vessel Act (H1 Reference)
10 Chapter 10: Commercial Refrigeration & NC Board Regulations
10.1 NC State Board of Refrigeration Contractors Statutes & Licensure 10.2 Commercial Refrigeration Systems, Multiplex Racks & Defrost Protocols 10.3 Walk-In Coolers, Freezers, Evaporator Pressure Regulators & Valves
11 Chapter 11: NC Administration, Mechanical, Fuel Gas & Energy Codes
11.1 North Carolina Mechanical Code: Equipment Access, Clearances & Condensate 11.2 Ventilation Rates, Exhaust Systems & Duct Smoke Detection 11.3 NC Fuel Gas Code: Combustion Air, Venting & Gas Appliance Installation 11.4 NC Energy Conservation Code: Duct Testing, Envelope & Efficiency Standards 11.5 NC Administrative Code & Policies: Permits, Inspections & Plan Review
12 Chapter 12: Electrical Fundamentals, Motor Controls & Diagnostics
12.1 HVAC Electrical Fundamentals, Circuit Schematics & Power Distribution 12.2 Electric Motors, Capacitors & Motor Controls 12.3 Systematic HVAC Diagnostics, Superheat/Subcooling & Airflow Troubleshooting 12.4 System Commissioning, Testing, Adjusting & Balancing (TAB)
8.2 Defrost Controls, Supplemental Electric Heat & Balance Points
Key Takeaways Explain This Topic AI
Frost accumulates on the outdoor coil when the coil surface temperature falls below 32°F (0°C) and below the outdoor air dew point, restricting airflow, insulating coil tubing, and degrading heat transfer.
Demand defrost systems monitor temperature differentials or pressure drops across the outdoor coil to initiate defrost only when ice is physically present, providing higher seasonal efficiency than fixed time-temperature defrost cycles.
During defrost, the reversing valve shifts into cooling mode, the outdoor fan is de-energized to accelerate coil warming, and supplemental electric strip heat is energized to temper cold indoor supply air.
The thermal balance point is the outdoor ambient temperature where building heat loss exactly equals heat pump heating capacity (Q_loss = Q_capacity), below which auxiliary heating must stage on to satisfy the indoor setpoint.
The economic balance point in dual-fuel hybrid systems represents the outdoor temperature where operating the heat pump costs exactly the same per delivered BTU as operating an alternative fossil fuel furnace, calculated using electric and fuel utility rates.
Last updated: August 2026
Defrost Controls, Supplemental Electric Heat & Balance Points
Core Principle: In heating mode, the outdoor coil operates at a saturation temperature 10 ∘ F 10^\circ\text{F} 1 0 ∘ F to 20 ∘ F 20^\circ\text{F} 2 0 ∘ F below the outdoor ambient air temperature . Whenever outdoor ambient drops below approximately 42 ∘ F 42^\circ\text{F} 4 2 ∘ F to 45 ∘ F 45^\circ\text{F} 4 5 ∘ F and relative humidity is moderate to high, the outdoor coil surface falls below 32 ∘ F 32^\circ\text{F} 3 2 ∘ F ( 0 ∘ C 0^\circ\text{C} 0 ∘ C ). Atmospheric moisture condenses and freezes into frost on the aluminum fins and copper tubes, acting as thermal insulation and choking coil airflow.
Frost Accumulation & Defrost Control Architecture Frost Accumulation Mechanism:
- Outdoor Air (35°F Dry Bulb / 32°F Dew Point)
- ├── Passes over Outdoor Coil Boiling at 18°F (-7.8°C)
- ├── Moisture Condenses on Sub-Freezing Fin Surfaces (< 32°F)
- ├── Condensate Freezes into Solid Frost / Ice Layers
- ├── Airflow CFM Drops (Static pressure across coil face spikes)
- ├── Evaporating Temperature & Suction Pressure Collapse
- └── Heat Pump Heating Capacity Drops by 40% - 70% if Not Defrosted
- 1. Time-Temperature Defrost Systems
Time-temperature defrost is an electro-mechanical or simple solid-state control method governed by two independent criteria:
Time Accumulation: An electronic timer on the defrost control board records cumulative compressor run time. Selectable pin jumpers allow field configuration for 30 , 60 , or 90 minutes 30\text{, }60\text{, or }90\text{ minutes} 30 , 60 , or 90 minutes of compressor operation (commonly set to 60 or 90 minutes 60\text{ or }90\text{ minutes} 60 or 90 minutes in North Carolina's Piedmont and Coastal regions, and 30 or 60 minutes 30\text{ or }60\text{ minutes} 30 or 60 minutes in the Western Blue Ridge Mountains where winter humidity and snowfall are elevated).
Coil Temperature Sensor (Defrost Thermostat / Klixon): A bi-metal disc switch or thermistor clamped to the coldest return bend of the outdoor coil (near the bottom liquid distributor). The switch closes on temperature drop at approximately 30 ∘ F − 32 ∘ F 30^\circ\text{F} - 32^\circ\text{F} 3 0 ∘ F − 3 2 ∘ F ( 0 ∘ C 0^\circ\text{C} 0 ∘ C ).
Initiation: Defrost begins only when the accumulated run timer expires AND the defrost thermostat switch is closed.
Termination: The cycle terminates when the coil sensor warms to 55 ∘ F − 70 ∘ F 55^\circ\text{F} - 70^\circ\text{F} 5 5 ∘ F − 7 0 ∘ F ( 13 ∘ C − 21 ∘ C 13^\circ\text{C} - 21^\circ\text{C} 1 3 ∘ C − 2 1 ∘ C ), confirming complete frost melting, or when an internal safety timer overrides the cycle after 10 to 14 minutes 10\text{ to }14\text{ minutes} 10 to 14 minutes .
2. Demand Defrost (Microprocessor Sensor Differential)
Demand defrost eliminates unnecessary defrost cycles by initiating defrost only when frost accumulation physically restricts heat transfer:
Temperature Differential Method ( Δ T \Delta T Δ T Method): The control board monitors two calibrated thermistors: Outdoor Ambient Air Temperature ( T ambient T_{\text{ambient}} T ambient ) and Outdoor Coil Temperature ( T coil T_{\text{coil}} T coil ). As frost accumulates, coil heat transfer degrades and evaporating temperature drops. When the differential ( T ambient − T coil T_{\text{ambient}} - T_{\text{coil}} T ambient − T coil ) exceeds a dynamically calculated threshold curve, defrost is triggered.
Air Pressure Differential Method: An air pressure differential switch measures static pressure drop across the outdoor coil face. As ice blocks fin passages, the static pressure differential rises, closing the switch contacts to initiate defrost.
The Complete Defrost Cycle: Step-by-Step Sequence of Operations
When defrost initiates, the heat pump orchestrates a rapid sequence of electrical and mechanical transitions to melt outdoor ice as quickly as possible (typically in 2 to 7 minutes): +-----------------------------------------------------------------------------------------+
- | THE DEFROST SEQUENCE OF OPERATIONS |
- +-----------------------------------------------------------------------------------------+
- | Step 1: Defrost Initiation Trigger (Timer + Sensor closed OR Demand ΔT threshold met) |
- | Step 2: 4-Way Reversing Valve Energizes/De-energizes (Shifts into COOLING MODE) |
- | Step 3: Outdoor Fan Motor De-energizes (Outdoor fan contactor opens) |
- | Step 4: Auxiliary Electric Strip Heat Energizes (W2/D terminal powered for tempering) |
- | Step 5: High-Pressure Hot Discharge Gas Floods Outdoor Coil (Rapid ice melting) |
- | Step 6: Coil Thermistor Reaches 55°F - 70°F (Or 10-14 min safety override expires) |
- | Step 7: Reversing Valve Shifts back to HEATING MODE |
- | Step 8: Outdoor Fan Motor Re-energizes |
- | Step 9: Auxiliary Electric Heat De-energizes (Thermostat returns to normal staging) |
- +-----------------------------------------------------------------------------------------+
- Critical Operating Details During Defrost
Outdoor Fan Shutdown: Turning off the outdoor fan stops cold outdoor air from blowing across the coil, allowing the hot discharge gas ( 140 ∘ F − 180 ∘ F 140^\circ\text{F} - 180^\circ\text{F} 14 0 ∘ F − 18 0 ∘ F ) to rapidly warm the coil to 60 ∘ F + 60^\circ\text{F}+ 6 0 ∘ F + , melting the frost within minutes.
Indoor Cold Blow Prevention (Tempering Heat): Because the system is operating in cooling mode during defrost, the indoor coil becomes the evaporator, absorbing heat from the indoor air. To prevent discharging chilling 45 ∘ F 45^\circ\text{F} 4 5 ∘ F air into the occupied living space, the defrost control board energizes the "W2" / "D" (Defrost) terminal, staging on indoor electric resistance heat banks to temper the airstream to a comfortable 75 ∘ F − 85 ∘ F 75^\circ\text{F} - 85^\circ\text{F} 7 5 ∘ F − 8 5 ∘ F .
Supplemental vs. Emergency Electric Heat & Electrical Staging
Electric resistance strip heaters installed in the indoor air handler serve two distinct functions: Electric Resistance Heating Operations:
- ├── 1. Supplemental Heat (Staged with Compressor)
- │ ├── Operates concurrently with heat pump when ambient is below Thermal Balance Point
- │ ├── Energized by 2nd-stage thermostat (W2) or outdoor ambient staging thermostats (OT)
- │ └── Sized to satisfy the deficit between building heat loss and heat pump capacity
- └── 2. Emergency Heat (Compressor Locked Out)
- ├── Manually switched at thermostat when compressor mechanically fails or trips on safety
- ├── 100% of building design heating load is carried exclusively by electric strip heaters
- └── Must be sized to handle 100% of ACCA Manual J heating load at 99% design dry bulb
- 1. Strip Heater Sizing & Kilowatt ( k W kW kW ) Calculations
Electric strip heater capacity is rated in kilowatts ( kW \text{kW} kW ): Heat Output (BTU/hr) = kW × 3 , 412.14 \text{Heat Output (BTU/hr)} = \text{kW} \times 3,412.14 Heat Output (BTU/hr) = kW × 3 , 412.14 Current Draw (Amperes) = kW × 1 , 000 Operating Voltage ( V ) \text{Current Draw (Amperes)} = \frac{\text{kW} \times 1,000}{\text{Operating Voltage } (V)} Current Draw (Amperes) = Operating Voltage ( V ) kW × 1 , 000
Electric Heater Kilowatt to BTU/hr Matrix (at 240V, 1-Phase)
Heater Rating (kW) Output (BTU/hr) Operating Current (Amps @ 240V) Minimum Overcurrent Protection (MCA / MOCP)
4.8 kW 4.8\text{ kW} 4.8 kW (5 kW nom) 16 , 378 BTU/hr 16,378\text{ BTU/hr} 16 , 378 BTU/hr 20.0 A 20.0\text{ A} 20.0 A 25 A / 30 A 25\text{ A} / 30\text{ A} 25 A /30 A Circuit Breaker
9.6 kW 9.6\text{ kW} 9.6 kW (10 kW nom) 32 , 757 BTU/hr 32,757\text{ BTU/hr} 32 , 757 BTU/hr 40.0 A 40.0\text{ A} 40.0 A 50 A / 60 A 50\text{ A} / 60\text{ A} 50 A /60 A Circuit Breaker
14.4 kW 14.4\text{ kW} 14.4 kW (15 kW nom) 49 , 135 BTU/hr 49,135\text{ BTU/hr} 49 , 135 BTU/hr 60.0 A 60.0\text{ A} 60.0 A Dual Circuit: 60 A + 30 A 60\text{ A} + 30\text{ A} 60 A + 30 A (or 100 A 100\text{ A} 100 A subpanel)
19.2 kW 19.2\text{ kW} 19.2 kW (20 kW nom) 65 , 513 BTU/hr 65,513\text{ BTU/hr} 65 , 513 BTU/hr 80.0 A 80.0\text{ A} 80.0 A Dual Circuit: 60 A + 60 A 60\text{ A} + 60\text{ A} 60 A + 60 A
Note
Under NEC Article 424 and NC Electrical Code , electric resistance space heating is classified as a continuous load . Branch circuit conductors and overcurrent protective devices must be sized at a minimum of 125 % 125\% 125% of total heater amperage plus blower motor load : MCA = ( I heaters × 1.25 ) + ( I motor × 1.25 ) \text{MCA} = (I_{\text{heaters}} \times 1.25) + (I_{\text{motor}} \times 1.25) MCA = ( I heaters × 1.25 ) + ( I motor × 1.25 )
2. Staging Controls & Outdoor Thermostats (OT)
To prevent massive electrical demand spikes and unnecessary high electric utility bills, supplemental heat banks must be staged in increments of 5 kW 5\text{ kW} 5 kW or 10 kW 10\text{ kW} 10 kW using:
Microprocessor Electronic Thermostat Staging: Uses intelligent proportional-integral (PI) algorithms that delay 2nd-stage (W2) auxiliary heat unless the indoor temperature droop exceeds 1.5 ∘ F − 2.0 ∘ F 1.5^\circ\text{F} - 2.0^\circ\text{F} 1. 5 ∘ F − 2. 0 ∘ F or recovery time exceeds a pre-set threshold.
Outdoor Thermostats (OT-1, OT-2): Adjustable bimetal or thermistor switches mounted in the outdoor unit wired in series with the W2 heat staging relays. An outdoor thermostat locks out strip heat banks until the outdoor ambient temperature drops below the predetermined thermal balance point (e.g., locking out Stage 2 electric heat above 32 ∘ F 32^\circ\text{F} 3 2 ∘ F ).
Thermal Balance Point vs. Economic Balance Point
Proper heat pump application engineering requires analyzing two distinct balance points on a capacity-versus-heat-loss chart. Capacity / Heat Loss (BTU/hr)
- ^
- 60k| / Building Heat Loss Line
- | / (Q_loss = U · A · ΔT)
- 50k| /
- | /
- 40k|----------------------------------X <--- THERMAL BALANCE POINT (~32°F)
- | / \
- 30k| Heat Pump Heating Capacity / \ Supplemental Heat Required
- | Curve (Q_capacity) / \ (Deficit = Q_loss - Q_capacity)
- 20k|==============================/ \
- +-----------------------------+---------+---------+---------> Outdoor Temp (°F)
- 0°F 32°F 47°F 65°F
- 1. The Thermal Balance Point
The Thermal Balance Point is the outdoor ambient temperature at which the building's calculated heat loss rate exactly equals the heat pump's maximum heating output capacity: Q building loss ( T ) = Q heat pump capacity ( T ) Q_{\text{building loss}}(T) = Q_{\text{heat pump capacity}}(T) Q building loss ( T ) = Q heat pump capacity ( T )
Above the Thermal Balance Point ( T > T balance T > T_{\text{balance}} T > T balance ): The heat pump supplies 100 % 100\% 100% of the home's heating requirement cycling on its normal first-stage thermostat (Y1). No auxiliary heat is needed.
Below the Thermal Balance Point ( T < T balance T < T_{\text{balance}} T < T balance ): The heat pump cannot satisfy the total building load alone. The indoor temperature droops, energizing the second-stage auxiliary heat (W2) to run concurrently with the heat pump to make up the thermal deficit: Q supplemental required = Q building loss − Q heat pump capacity Q_{\text{supplemental required}} = Q_{\text{building loss}} - Q_{\text{heat pump capacity}} Q supplemental required = Q building loss − Q heat pump capacity
2. The Economic Balance Point (Dual-Fuel / Hybrid Systems)
In a Dual-Fuel (Hybrid) System , an electric heat pump is paired with a fossil fuel furnace (natural gas, LP propane, or fuel oil) instead of electric strip heat. The Economic Balance Point is the outdoor ambient temperature at which the cost per delivered BTU \text{BTU} BTU of heat pump operation exactly equals the cost per delivered BTU \text{BTU} BTU of fossil fuel furnace operation.
Cost per 100,000 BTU of Delivered Heat Equations
Heat Pump Cost per 100,000 BTU: Cost HP = 100 , 000 BTU 3 , 412.14 BTU/kWh × COP × Electric Rate ($/kWh) \text{Cost}_{\text{HP}} = \frac{100,000\text{ BTU}}{3,412.14\text{ BTU/kWh} \times \text{COP}} \times \text{Electric Rate (\$/kWh)} Cost HP = 3 , 412.14 BTU/kWh × COP 100 , 000 BTU × Electric Rate ($/kWh)
Natural Gas Furnace Cost per 100,000 BTU ( 1 Therm = 100 , 000 BTU 1\text{ Therm} = 100,000\text{ BTU} 1 Therm = 100 , 000 BTU ): Cost Gas = Gas Rate ($/Therm) AFUE Rating \text{Cost}_{\text{Gas}} = \frac{\text{Gas Rate (\$/Therm)}}{\text{AFUE Rating}} Cost Gas = AFUE Rating Gas Rate ($/Therm)
LP Propane Furnace Cost per 100,000 BTU ( 1 Gallon LP = 91 , 500 BTU 1\text{ Gallon LP} = 91,500\text{ BTU} 1 Gallon LP = 91 , 500 BTU ): Cost LP = 100 , 000 BTU 91 , 500 BTU/gal × AFUE × LP Rate ($/Gal) \text{Cost}_{\text{LP}} = \frac{100,000\text{ BTU}}{91,500\text{ BTU/gal} \times \text{AFUE}} \times \text{LP Rate (\$/Gal)} Cost LP = 91 , 500 BTU/gal × AFUE 100 , 000 BTU × LP Rate ($/Gal)
Control Strategy: At outdoor temperatures above the Economic Balance Point, the heat pump runs. At outdoor temperatures below the Economic Balance Point, the heat pump compressor is locked out and the fossil fuel furnace fires exclusively.
- Step-by-Step Worked Technical Examples
- Example 1: Calculating the Thermal Balance Point
Problem: A Raleigh, NC home has a calculated ACCA Manual J design heat loss of 45 , 000 BTU/hr 45,000\text{ BTU/hr} 45 , 000 BTU/hr at a winter design temperature of 20 ∘ F 20^\circ\text{F} 2 0 ∘ F based on a 70 ∘ F 70^\circ\text{F} 7 0 ∘ F indoor setpoint (Design Δ T = 70 − 20 = 50 ∘ F \Delta T = 70 - 20 = 50^\circ\text{F} Δ T = 70 − 20 = 5 0 ∘ F ). The building heat loss factor is: q loss rate = 45 , 000 BTU/hr 50 ∘ F = 900 BTU/hr per ∘ F q_{\text{loss rate}} = \frac{45,000\text{ BTU/hr}}{50^\circ\text{F}} = 900\text{ BTU/hr per }^\circ\text{F} q loss rate = 5 0 ∘ F 45 , 000 BTU/hr = 900 BTU/hr per ∘ F
The installed 3-ton heat pump has the following manufacturer certified heating capacities:
- At 47 ∘ F 47^\circ\text{F} 4 7 ∘ F outdoor ambient: 36 , 000 BTU/hr 36,000\text{ BTU/hr} 36 , 000 BTU/hr
- At 17 ∘ F 17^\circ\text{F} 1 7 ∘ F outdoor ambient: 21 , 000 BTU/hr 21,000\text{ BTU/hr} 21 , 000 BTU/hr
Determine: (1) the mathematical equation for the heat pump capacity curve, (2) the exact Thermal Balance Point temperature ( T balance T_{\text{balance}} T balance ), and (3) the supplemental strip heat required at 20 ∘ F 20^\circ\text{F} 2 0 ∘ F design outdoor temperature.
Solution:
Linear Heat Pump Capacity Equation ( Q HP = m ⋅ T + b Q_{\text{HP}} = m \cdot T + b Q HP = m ⋅ T + b ): Slope ( m ) = 36 , 000 − 21 , 000 47 − 17 = 15 , 000 30 = 500 BTU/hr per ∘ F \text{Slope } (m) = \frac{36,000 - 21,000}{47 - 17} = \frac{15,000}{30} = 500\text{ BTU/hr per }^\circ\text{F} Slope ( m ) = 47 − 17 36 , 000 − 21 , 000 = 30 15 , 000 = 500 BTU/hr per ∘ F Q HP ( T ) = 21 , 000 + 500 × ( T − 17 ) = 500 ⋅ T + 12 , 500 Q_{\text{HP}}(T) = 21,000 + 500 \times (T - 17) = 500 \cdot T + 12,500 Q HP ( T ) = 21 , 000 + 500 × ( T − 17 ) = 500 ⋅ T + 12 , 500
Building Heat Loss Equation: Q loss ( T ) = 900 × ( 70 − T ) = 63 , 000 − 900 ⋅ T Q_{\text{loss}}(T) = 900 \times (70 - T) = 63,000 - 900 \cdot T Q loss ( T ) = 900 × ( 70 − T ) = 63 , 000 − 900 ⋅ T
Set Equations Equal to Solve for T balance T_{\text{balance}} T balance : 500 ⋅ T + 12 , 500 = 63 , 000 − 900 ⋅ T 500 \cdot T + 12,500 = 63,000 - 900 \cdot T 500 ⋅ T + 12 , 500 = 63 , 000 − 900 ⋅ T 1 , 400 ⋅ T = 50 , 500 1,400 \cdot T = 50,500 1 , 400 ⋅ T = 50 , 500 T balance = 50 , 500 1 , 400 = 36.07 ∘ F ≈ 36 ∘ F T_{\text{balance}} = \frac{50,500}{1,400} = \mathbf{36.07^\circ\text{F}} \approx 36^\circ\text{F} T balance = 1 , 400 50 , 500 = 36.0 7 ∘ F ≈ 3 6 ∘ F
Supplemental Heat Required at 20 ∘ F 20^\circ\text{F} 2 0 ∘ F Design Temperature: Q loss ( 20 ∘ F ) = 900 × ( 70 − 20 ) = 45 , 000 BTU/hr Q_{\text{loss}}(20^\circ\text{F}) = 900 \times (70 - 20) = 45,000\text{ BTU/hr} Q loss ( 2 0 ∘ F ) = 900 × ( 70 − 20 ) = 45 , 000 BTU/hr Q HP ( 20 ∘ F ) = 500 × ( 20 ) + 12 , 500 = 22 , 500 BTU/hr Q_{\text{HP}}(20^\circ\text{F}) = 500 \times (20) + 12,500 = 22,500\text{ BTU/hr} Q HP ( 2 0 ∘ F ) = 500 × ( 20 ) + 12 , 500 = 22 , 500 BTU/hr Q supplemental = 45 , 000 − 22 , 500 = 22 , 500 BTU/hr Q_{\text{supplemental}} = 45,000 - 22,500 = \mathbf{22,500\text{ BTU/hr}} Q supplemental = 45 , 000 − 22 , 500 = 22 , 500 BTU/hr Heater kW Required = 22 , 500 BTU/hr 3 , 412.14 BTU/kWh = 6.59 kW → Install 10 kW Heater Bank \text{Heater kW Required} = \frac{22,500\text{ BTU/hr}}{3,412.14\text{ BTU/kWh}} = \mathbf{6.59\text{ kW}} \rightarrow \text{Install } 10\text{ kW Heater Bank} Heater kW Required = 3 , 412.14 BTU/kWh 22 , 500 BTU/hr = 6.59 kW → Install 10 kW Heater Bank
Example 2: Calculating the Economic Balance Point for a Dual-Fuel System
Problem: A dual-fuel heat pump system in Greensboro, NC is paired with a 96% AFUE natural gas furnace. Natural gas costs $1.40 per therm , and electricity costs $0.12 per kWh . Calculate the minimum heat pump C O P COP COP required for the heat pump to be more economical to run than the gas furnace, and determine the Economic Balance Point from manufacturer data.
Solution:
Calculate Cost per 100,000 BTU for the 96% Gas Furnace: Cost Gas = 1.40 0.96 = 1.458 per 100,000 BTU \text{Cost}_{\text{Gas}} = \frac{1.40}{0.96} = \mathbf{1.458\text{ per 100,000 BTU}} Cost Gas = 0.96 1.40 = 1.458 per 100,000 BTU
Set Heat Pump Cost Equal to Gas Cost to Find Parity COP ( C O P parity COP_{\text{parity}} CO P parity ): Cost HP = 100 , 000 3 , 412.14 × C O P × 0.12 = 3.5168 C O P = 1.458 \text{Cost}_{\text{HP}} = \frac{100,000}{3,412.14 \times COP} \times 0.12 = \frac{3.5168}{COP} = 1.458 Cost HP = 3 , 412.14 × COP 100 , 000 × 0.12 = COP 3.5168 = 1.458 C O P parity = 3.5168 1.458 = 2.41 COP_{\text{parity}} = \frac{3.5168}{1.458} = \mathbf{2.41} CO P parity = 1.458 3.5168 = 2.41
Economic Rule: Whenever the heat pump's operating C O P COP COP is greater than 2.41 2.41 2.41 (which typically occurs at outdoor ambient temperatures above 30 ∘ F 30^\circ\text{F} 3 0 ∘ F for modern units), the heat pump is cheaper to operate. Below 30 ∘ F 30^\circ\text{F} 3 0 ∘ F where C O P < 2.41 COP < 2.41 COP < 2.41 , the control system switches off the heat pump and fires the 96% natural gas furnace exclusively.
Example 3: Electric Auxiliary Heater Ampacity & Circuit Sizing
Problem: An air handler is installed with a 15 kW 15\text{ kW} 15 kW ( 14.4 kW 14.4\text{ kW} 14.4 kW actual at 240 V 240\text{V} 240 V ) electric supplemental heater package and a blower motor rated at 3.5 Full Load Amps (FLA) 3.5\text{ Full Load Amps (FLA)} 3.5 Full Load Amps (FLA) on a 240 V 240\text{V} 240 V , single-phase line. Calculate: (1) total heater element amperage, (2) the Minimum Circuit Ampacity (MCA), and (3) the Maximum Overcurrent Protection (MOCP) / circuit breaker size.
Solution:
Heater Element Full Load Amperage: I heaters = 14 , 400 Watts 240 Volts = 60.0 A I_{\text{heaters}} = \frac{14,400\text{ Watts}}{240\text{ Volts}} = \mathbf{60.0\text{ A}} I heaters = 240 Volts 14 , 400 Watts = 60.0 A
Minimum Circuit Ampacity (MCA) per NEC Article 424 (125% continuous load): MCA = ( I heaters × 1.25 ) + ( I motor × 1.25 ) \text{MCA} = (I_{\text{heaters}} \times 1.25) + (I_{\text{motor}} \times 1.25) MCA = ( I heaters × 1.25 ) + ( I motor × 1.25 ) MCA = ( 60.0 A × 1.25 ) + ( 3.5 A × 1.25 ) = 75.0 A + 4.38 A = 79.38 A \text{MCA} = (60.0\text{ A} \times 1.25) + (3.5\text{ A} \times 1.25) = 75.0\text{ A} + 4.38\text{ A} = \mathbf{79.38\text{ A}} MCA = ( 60.0 A × 1.25 ) + ( 3.5 A × 1.25 ) = 75.0 A + 4.38 A = 79.38 A
Circuit Breaker / MOCP Sizing:
Most 15 kW 15\text{ kW} 15 kW heater kits are internally divided into two sub-circuits:
Circuit 1 (10 kW heater + motor): ( 40.0 × 1.25 ) + ( 3.5 × 1.25 ) = 54.38 A MCA → 60 Amp Breaker (40.0 \times 1.25) + (3.5 \times 1.25) = 54.38\text{ A MCA} \rightarrow \mathbf{60\text{ Amp Breaker}} ( 40.0 × 1.25 ) + ( 3.5 × 1.25 ) = 54.38 A MCA → 60 Amp Breaker
Circuit 2 (5 kW heater only): 20.0 × 1.25 = 25.0 A MCA → 30 Amp Breaker 20.0 \times 1.25 = 25.0\text{ A MCA} \rightarrow \mathbf{30\text{ Amp Breaker}} 20.0 × 1.25 = 25.0 A MCA → 30 Amp Breaker
If supplied by a single feeder: Next standard fuse/breaker size above 79.38 A 79.38\text{ A} 79.38 A not exceeding manufacturer rating is 90 A 90\text{ A} 90 A or 100 A 100\text{ A} 100 A with minimum #3 AWG Copper (or #1 AWG Aluminum) conductors rated for 75 ∘ C 75^\circ\text{C} 7 5 ∘ C .