Study guide
8.4 LIS/GIS Surveys, Classifications & the Board GIS Guidelines (21 NCAC 56 .1608)
North Carolina Land Surveyor NC PLS
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: North Carolina Statutory Authority & Board Administration (G.S. 89C & 21 NCAC 56)
1.1 The North Carolina State-Specific Exam: Format, Blueprint & Approved References 1.2 Statutory Framework & Board Organization (G.S. 89C & 21 NCAC 56) 1.3 Licensure Qualifications, Education & Experience Pathways (G.S. 89C-13(b)) 1.4 Professional Entity Organization, Firm Licensure & Business Rules 1.5 Continuing Professional Competency (CPC) & License Renewal
2 Chapter 2: Professional Conduct, Standard of Care & Board Enforcement
2.1 Rules of Professional Conduct (21 NCAC 56 .0701) & Advertising (.0702) 2.2 Responsible Charge, Direct Supervisory Control & Sealing (21 NCAC 56 .0701(d), .1101-.1103) 2.3 Qualifications-Based Selection (QBS) & Public Contracting (G.S. 143-64.31) 2.4 Disciplinary Procedures, Board Enforcement Powers & Penalties (G.S. 89C-21 & 89C-22)
3 Chapter 3: NC Standards of Practice for Land Surveying (21 NCAC 56.1600)
3.1 Surveying Procedures & the Record Examination Duty (21 NCAC 56 .1602(a)-(c)) 3.2 Classification of Boundary Surveys, Closure & Positional Accuracy (21 NCAC 56 .1603) 3.3 Monumentation, Tie Lines & Mapping Requirements (21 NCAC 56 .1602(d)-(h) & .1604) 3.4 Vertical Control, Topographic & Planimetric Mapping (21 NCAC 56 .1605 & .1606)
4 Chapter 4: North Carolina Plat Recording Laws & Review Officer Procedures (G.S. 47-30)
4.1 Plat Size, Reproducible Form, Title Contents & Required Plat Information (G.S. 47-30(a)-(f)) 4.2 The Surveyor Certificate, the Five (f)(11) Statements & Recording Exceptions 4.3 Review Officer Statutory Role, Powers & Certification Process (G.S. 47-30.2) 4.4 Geodetic Ties, Grid Coordinates & NC SPCS Connection (G.S. 47-30(f)(9) & 21 NCAC 56 .1602(g))
5 Chapter 5: North Carolina Boundary Law, Priority of Calls & Title History
5.1 The North Carolina Priority of Calls Hierarchy (Cherry v. Slade) 5.2 North Carolina Real Property History, Colonial Grants & the Granville District 5.3 Metes & Bounds Descriptions, Ambiguities & Deed Construction Rules 5.4 Processioning Proceedings & Boundary Dispute Resolution (G.S. Chapter 38)
6 Chapter 6: Adverse Possession, Easements, Rights-of-Way & Title Doctrines in NC
6.1 Adverse Possession & Color of Title under North Carolina Law (G.S. 1-38 & 1-40) 6.2 Real Property Claims Against the State & Public Prescriptive Immunity (G.S. 1-35) 6.3 Easements: Prescription, Implication, Necessity & Statutory Cartways (G.S. 136-68) 6.4 Public Road Dedication, Maintenance & Statutory Abandonment (G.S. 136-96)
7 Chapter 7: Riparian Rights, Water Boundaries & Coastal Surveying in North Carolina
7.1 Navigability, The Public Trust Doctrine & Riparian Rights (G.S. Chapter 146) 7.2 Non-Navigable Waters, Thread of the Stream (Filum Aquae) & Submerged Lands 7.3 Coastal Boundaries, Mean High Water Mark & Coastal Area Management Act (CAMA) 7.4 Water Boundary Movement: Accretion, Reliction, Erosion & Avulsion
8 Chapter 8: Geodetic Surveying, the NC Coordinate System & LIS/GIS Standards
8.1 The North Carolina State Plane Coordinate System (G.S. Chapter 102) & Grid Reductions 8.2 NCGS Real-Time Network & GNSS Survey Standards (21 NCAC 56 .1607) 8.3 Datums, Geoid Models & NSRS Modernization (NATRF2022 / NAPGD2022) 8.4 LIS/GIS Surveys, Classifications & the Board GIS Guidelines (21 NCAC 56 .1608)
9 Chapter 9: Incidental Streets, Drainage, Erosion Control & Stormwater (16% of the Exam)
9.1 Scope of Incidental Street & Storm Sewer Design (G.S. 89C-3(7) & the Board Guidelines) 9.2 Hydrology for Incidental Drainage: The Rational Method 9.3 Hydraulics: Sizing Swales, Ditches & Storm Conduits 9.4 Erosion & Sediment Control: The Sedimentation Pollution Control Act & 15A NCAC 04 9.5 Post-Construction Stormwater, SCMs & the NCDEQ Stormwater Design Manual 9.6 NCDOT Subdivision Roads Minimum Construction Standards
8.4 LIS/GIS Surveys, Classifications & the Board GIS Guidelines (21 NCAC 56 .1608)
Key Takeaways Explain This Topic AI
21 NCAC 56 .1608 is titled "Classification/Land Information System/Geographic Information System Surveys" and has nothing to do with drainage; LIS/GIS surveys are the measurement of existing surface and subsurface features to determine their accurate geospatial location for inclusion in an LIS/GIS database.
LIS/GIS work relating to property lines, rights-of-way, easements, subdivisions, survey monument or reference point positions, the configuration or contour of the earth's surface, and geodetic surveying must be performed by a Board licensee unless exempt by G.S. 89C-25.
The five horizontal LIS/GIS classes are AA at 0.033 meter (0.10 feet), A at 0.5 meter (1.64 feet), B at 1.0 meter (3.28 feet), C at 2 meters (6.56 feet), and D at 5 meters (16.40 feet); in the absence of a specified standard the survey defaults to Class B.
The LIS/GIS certificate must state the class of survey and the method used to evaluate accuracy, the method of measurement, the dates of the survey, and the datum used, and reports horizontal accuracy as the radius of a circle of uncertainty containing the true location 95 percent of the time.
G.S. 89C-3(7)a.7. brings creating, preparing, or modifying electronic or computerized data, including land information systems and geographic information systems, within the practice of land surveying where it relates to the performance of that practice.
Last updated: August 2026
8.4 LIS/GIS Surveys, Classifications & the Board GIS Guidelines (21 NCAC 56 .1608)
21 NCAC 56 .1608 is titled "Classification/Land Information System/Geographic Information System Surveys." Learn that title, because .1608 is the single most frequently misidentified rule number in North Carolina surveying prep material — it is routinely and wrongly described as an "incidental drainage" rule. It is not. Incidental drainage authority comes from G.S. 89C-3(7)a.3. and the exception in G.S. 89C-3(7)b.(vi) , covered in Chapter 9. Rule .1608 is about geospatial data.
The topic also sits squarely inside the exam blueprint: the Board's published state-specific exam reference list expressly names the GIS Inclusions/Exclusions Guidelines among the Board Policies and Guidelines a candidate is expected to have read.
1. The Statutory Hook — G.S. 89C-3(7)a.7.
The practice of land surveying expressly includes " Creating, preparing, or modifying electronic or computerized data, including land information systems and geographic information systems, relative to the performance of the practice of land surveying. "
The qualifier "relative to the performance of the practice of land surveying" is doing real work. Building a parcel viewer is not automatically surveying; determining where a parcel line is and encoding that determination is.
2. What an LIS/GIS Survey Is — .1608(a)
"Land Information System/Geographic Information System (LIS/GIS) surveys are defined as the measurement of existing surface and subsurface features for the purpose of determining their accurate geospatial location for inclusion in an LIS/GIS database ."
The rule then draws the licensure line:
"All LIS/GIS surveys as they relate to property lines, rights-of-way, easements, subdivisions of land, the position for any survey monument or reference point, the determination of the configuration or contour of the earth's surface or the position of fixed objects thereon, and geodetic surveying ... shall be performed by a Land Surveyor who is a licensee of this Board unless exempt by G.S. 89C-25 ."
Two exam-relevant consequences follow. First, subsurface utility location for a GIS database is inside the rule — it says "surface and subsurface features." Second, the escape valve is the general exemption statute, G.S. 89C-25 , whose most relevant subdivisions here are (4) work as an employee or assistant under the responsible charge of a licensee and (6) government employees practicing solely for the government on government-owned works and projects.
3. The Accuracy Classes — .1608(a)(1) and (a)(2)
Five general classifications are established, "any of which may be specified by the client. In the absence of a specified standard, the surveyor shall conform the survey to the requirements for a Class B survey. "
Horizontal — relative accuracy
- Class Relative accuracy
- AA equal to or no less than 0.033 meter (0.10 feet)
- A equal to or less than 0.5 meter (1.64 feet)
- B equal to or less than 1.0 meter (3.28 feet) — the default
- C equal to or less than 2 meters (6.56 feet)
- D equal to or less than 5 meters (16.40 feet)
These are the same five values .1606 uses for topographic and planimetric mapping, which is a useful memory hook: 0.10 / 1.64 / 3.28 / 6.56 / 16.40 feet covers both rules.
Vertical — three classifications
Class Applies to Maximum vertical error
A Urban and suburban vertical control surveys — lands within or adjoining a town or city 0.10 times the square root of the miles run
B Other vertical control surveys — all lands not covered by Class A 0.20 times the square root of the miles run
C Trigonometric vertical control surveys, used for vertical control for aerial and topographic mapping 0.30 times the square root of the miles run; GNSS vertical error shall not exceed five centimeters relative to the referenced benchmarks at the 95 percent confidence level (2 sigma) under FGDC standards
.1608(b) then preserves everything else: "Nothing in this Rule negates or replaces the relative accuracy standards found in Rules .1601 through .1607 of this Section." A GIS-driven project that also retraces a boundary is still a boundary survey governed by .1602, .1603, and .1604.
4. The LIS/GIS Certificate — .1608(c) and (d)
The PLS in responsible charge of the LIS/GIS boundary or geodetic control survey shall certify, in written or digital form, all of the following:
Class of LIS/GIS survey , and the method of measurement used to evaluate the accuracy, described as statistical testing or least squares adjustment results, comparison with values of higher accuracy, and repeat measurements . The rule then defines the reporting standard: "the reporting standard in the horizontal component is the radius of a circle of uncertainty , such that the true or theoretical location of the point falls within that circle 95 percent of the time ."
Method of measurement — i.e., global navigation satellite systems, electronic scanners, theodolite and electronic distance meter, transit and tape.
Date(s) of the survey.
- Datum used for the survey. "I, ______________________, certify that this project was completed under my
- direct and responsible charge from an actual survey made under my supervision;
- that this survey was performed to meet the requirements for an LIS/GIS survey
- [21 NCAC 56.1608] to the accuracy of Class ____ and vertical accuracy; when
- applicable to the Class ___ standard method used to evaluate the accuracy was
- _______________; method of measurement ______________; date(s) of survey
- ___________; datum used for survey __________; and all coordinates are based on
- ______________ ['NAD 83' and realization (date of adjustment of coordinate
- system) or 'NAD 27'] and all elevations are based on ________________
- (NGVD 29, NAVD 88, or other)."
Note the difference in how horizontal uncertainty is reported across the three rules a modern surveyor touches: .1603 offers a ratio of precision or an error-ellipse semi-axis at 95 percent; .1606 points to FGDC Part 1 reporting; .1608 uses a radius of a circle of uncertainty at 95 percent. They are not interchangeable phrasings, and a certificate should use the language of the rule it invokes.
5. The Board's GIS Inclusions/Exclusions Guidelines
The Board publishes a short policy distinguishing GIS activity that constitutes the practice of land surveying from activity that does not. The organizing question is not the software; it is whether the work determines or represents the location of a boundary, monument, or feature as a matter of position, and whether the public will rely on it as such . +-----------------------------------------------------------------------------+
- | THE ORGANIZING QUESTION FOR GIS WORK IN NORTH CAROLINA |
- | |
- | Does the activity DETERMINE or REPRESENT the geospatial position of a |
- | boundary, right-of-way, easement, monument, or physical feature in a way |
- | the public or a client will rely on as a positional statement? |
- | |
- | YES --> the practice of land surveying; a Board licensee must be in |
- | responsible charge, unless exempt by G.S. 89C-25 |
- | |
- | NO --> cartographic display, thematic mapping, database |
- | administration, analysis of data positioned by others |
- +-----------------------------------------------------------------------------+
Typical inclusions — work requiring a licensee:
Field measurement of features (surface or subsurface) to establish their coordinates for a GIS layer.
Determining or depicting the position of property lines, rights-of-way, easements, or subdivision boundaries.
Setting, resetting, or determining the position of any survey monument or reference point.
Determining the configuration or contour of the earth's surface, or the position of fixed objects on it.
Geodetic control work supporting a GIS.
Typical exclusions — work not requiring a licensee:
Compiling, converting, or displaying data whose positions were established by others, where no new positional determination is made.
Thematic and analytical mapping — zoning, demographics, land use, environmental overlays — that does not purport to locate boundaries.
Database design, administration, and maintenance.
Tax parcel mapping maintained for ad valorem assessment, which by long-settled practice is not a boundary determination.
Caution
The exclusion for parcel-base GIS is an exclusion from licensure , not a license to mislead. A parcel layer distributed without a disclaimer invites reliance it cannot support. The professional answer is the one .1604(b) and G.S. 47-30(d) already model for plats: say what the lines are, and say where they came from. A surveyor who exports a boundary from a tax parcel layer into a survey product without independent record research has violated 21 NCAC 56 .1602(c) regardless of what the GIS metadata says.