Study guide

2.4 Sanitary Sewer Overflows: Reporting, Press Releases & Public Notice

North Carolina Water/Wastewater Operator Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: North Carolina Regulatory Framework, Certification & Classification

1.1 Dual Regulatory Structure: WTFOCB, WPCSOCC & NC DEQ 1.2 Drinking Water Certification Grades, Eligibility & the Apprentice Pathway 1.3 Examinations, Fees, Renewal, Continuing Education & Discipline 1.4 Classifying Drinking Water Facilities: Rating Values, Classes & Required Operators 1.5 Classifying Water Pollution Control Systems Under 15A NCAC 08G .0300 1.6 Wastewater Certification Types, Experience Ladders, OIT & Reciprocity

2 Chapter 2: Operator in Responsible Charge, Oversight & Regulatory Reporting

2.1 Designating the ORC and Back-up ORC: Forms, Deadlines & Legal Duties 2.2 Mandatory Visitation Frequencies & Facility Oversight 2.3 Operational Logs, Records Retention & Compliance Reporting 2.4 Sanitary Sewer Overflows: Reporting, Press Releases & Public Notice 2.5 The Federal Drinking Water Rule Framework Operators Are Tested On

3 Chapter 3: Drinking Water Treatment: Source Water Through Filtration

3.1 Source Water Quality, Raw Water Intake & Rapid Mixing 3.2 Coagulation Chemistry, Flocculation & Sedimentation Basins 3.3 Granular Media Filtration, Head Loss & Backwash Protocols 3.4 Taste and Odor Control, Powdered Activated Carbon & Algae Management

4 Chapter 4: Disinfection, Chemical Conditioning & Advanced Water Treatment

4.1 Chlorination Chemistry, Breakpoint Chlorination & CT Disinfection Inactivation 4.2 Disinfection Byproducts (TTHM & HAA5), Stage 1/2 DBPR & Enhanced Coagulation 4.3 Corrosion Control, Lead & Copper Rule Revisions, Fluoridation & Groundwater Treatment 4.4 Iron and Manganese Control: Oxidation, Greensand & Sequestration 4.5 Softening, Ion Exchange & Membrane Treatment 4.6 Water Plant Residuals, Backwash Recovery & Waste Disposal

5 Chapter 5: Groundwater Sources, Wells & Small Water Systems

5.1 Well Hydrology, Aquifers & North Carolina Well Construction Standards 5.2 Well Pumps, Wellhead Equipment & Source Protection 5.3 Small Water System Operations, Administration & Plant Recordkeeping

6 Chapter 6: Water Distribution Systems, Storage & Cross-Connection Control

6.1 Water Distribution Hydraulics, Storage Facilities & Water Quality Maintenance 6.2 Water Use, Demand Patterns & Distribution System Design 6.3 Pipe Materials, Main Installation, Service Connections & Meters 6.4 Fire Hydrants, Valve Operation & Distribution Operational Practices 6.5 Pump Hydraulics, Valve Operation & Cross-Connection Control / Backflow Prevention 6.6 System Mapping, Records & Information Management 6.7 Utility Security, Emergency Response & Boil Water Advisories

7 Chapter 7: Instrumentation, Electrical Fundamentals, Maintenance & Microbiological Monitoring

7.1 Instrumentation, Electrical Fundamentals & SCADA 7.2 Preventive Maintenance, Pumps, Motors & Mechanical Equipment 7.3 Bacteriology, Sample Siting Plans & RTCR Compliance Sampling

8 Chapter 8: Biological Wastewater Treatment & Secondary Processes

8.1 Wastewater Characterization, Preliminary Screening & Primary Clarification 8.2 Wastewater Lagoons, Stabilization Ponds & Operational Control 8.3 Constructed Wetlands & Natural Treatment Systems 8.4 Septic Tanks, Media Filters, Aerobic Treatment Units & Grease Interceptors 8.5 Attached Growth Systems: Trickling Filters, RBCs & Fixed-Film Processes 8.6 Activated Sludge Microbiology, Aeration Basins & Secondary Clarifiers 8.7 Operational Process Control: F/M Ratio, MCRT / Sludge Age & SVI

9 Chapter 9: Nutrient Removal, Solids Handling & Effluent Management

9.1 Biological Nutrient Removal (BNR) in NC Nutrient-Sensitive Waters (NSW) 9.2 Sludge Stabilization, Aerobic/Anaerobic Digestion & Biosolids Management 9.3 Digester Gas Systems, Heating, Mixing & Explosion Safety 9.4 Composting, Thermal Drying & Alternative Solids Disposal 9.5 Odor Sources, Measurement & Control Technologies 9.6 Tertiary Filtration, Reclaimed Water & Reuse Under 15A NCAC 02U 9.7 Effluent Disinfection, Dechlorination & NPDES Permit Compliance

10 Chapter 10: Wastewater Collection Systems, Lift Stations & Field Operations

10.1 Wastewater Collection System Design, Lift Stations & Inflow and Infiltration (I/I) 10.2 Manholes, Service Taps, Laterals & Sewer Construction Practice 10.3 Sewer Cleaning, Root Control & Preventive Maintenance Programs 10.4 Collection System Inspection & Acceptance Testing 10.5 Job-Site Pre-Planning, Traffic Control & Field Work Safety

11 Chapter 11: Industrial Pretreatment & Physical/Chemical Treatment

11.1 Industrial Pretreatment Programs & Protecting the POTW 11.2 Physical/Chemical Treatment Processes for Industrial Wastewater 11.3 Groundwater Remediation Systems, Flow Equalization & Flow Measurement

12 Chapter 12: Laboratory, Safety, Utility Management & Applied Mathematics

12.1 Laboratory Analytical Methods, Sampling Procedures & QA/QC 12.2 Chemical Safety, Gaseous Chlorine Handling & Hazard Communication 12.3 Permit-Required Confined Space Entry & Excavation / Trenching Safety 12.4 Electrical Safety, Lockout/Tagout & Machine Guarding 12.5 Biological Hazards, PPE, Heat Stress & Personal Hygiene 12.6 Applied Water & Wastewater Mathematics & Process Calculations 12.7 Process Control Mathematics: Loading, Efficiency, Removal & Solids 12.8 Hydraulics, Pressure & Unit Conversion Mathematics 12.9 Utility Management: Personnel, Budgeting, Public Relations & Plant Security

2.4 Sanitary Sewer Overflows: Reporting, Press Releases & Public Notice

Key Takeaways Explain This Topic AI

G.S. 143-215.1C(a1) requires the owner or operator of any permitted wastewater collection or treatment works to report a discharge of 1,000 gallons or more of untreated wastewater to surface waters to the Department as soon as practicable but no later than 24 hours after determining the discharge reached surface waters.

For municipal or domestic systems, a discharge of 1,000 gallons or more to surface waters requires a press release to all print and electronic news media providing general coverage in the county, issued within 24 hours of determining the discharge reached surface waters.

A discharge of 15,000 gallons or more to surface waters additionally requires a newspaper notice captioned NOTICE OF DISCHARGE OF UNTREATED SEWAGE, published within 10 days after the Secretary determines the affected counties and approves the notice, with proof of publication filed within 30 days.

The press release and the list of media it was sent to must be retained for at least one year and provided to any person on request.

The ORC must separately notify the system owner within 24 hours and in writing within five days of first knowledge of any overflow, bypass, or permit limit violation under 15A NCAC 08G .0204(6).

Last updated: September 2026

2.4 Sanitary Sewer Overflows: Reporting, Press Releases & Public Notice

A sanitary sewer overflow (SSO) is any discharge of untreated wastewater from a collection system or treatment works to the ground, to a storm drain, or to surface waters. North Carolina's notification law is G.S. 143-215.1C , and the single most common exam error is mixing up its three thresholds.

  • The three duties and three clocks T = 0 Discharge discovered, contained, and volume estimated
  • |
  • v
  • <= 24 h REPORT TO THE DEPARTMENT (G.S. 143-215.1C(a1))

1,000 gallons or more of untreated wastewater reaching surface waters:

report as soon as practicable, no later than 24 hours after determining

the discharge reached surface waters.

  • |
  • v
  • <= 24 h PRESS RELEASE (G.S. 143-215.1C(b)(1))
  • 1,000 gallons or more reaching surface waters: issue a press release to
  • ALL print and electronic news media providing general coverage in the
  • county where the discharge occurred, within 24 hours of determining the
  • discharge reached surface waters. Keep the release and the media list

for at least one year.

  • |
  • v
  • <= 10 d NEWSPAPER NOTICE (G.S. 143-215.1C(b)(2))
  • 15,000 gallons or more reaching surface waters: publish a notice captioned
  • "NOTICE OF DISCHARGE OF UNTREATED SEWAGE" in a newspaper of general
  • circulation in the county of discharge and in each significantly affected
  • downstream county. Publish within 10 days AFTER the Secretary determines

the affected counties and approves the form, content, and newspapers.

File a copy and proof of publication with the Department within 30 days.

Who the subsection applies to. Subsection (b) governs works "the operation of which is primarily to collect or treat municipal or domestic wastewater ." Subsection (c) imposes the same 1,000-gallon press release and 15,000-gallon newspaper notice duties on other permitted works — industrial systems — for discharges of untreated waste , with the notice captioned "NOTICE OF DISCHARGE OF UNTREATED WASTE."

Warning

Do not invert the thresholds. The press release threshold is 1,000 gallons , not 15,000. The 15,000-gallon threshold adds the newspaper notice , and that notice is due within 10 days after the Secretary acts , not within 24 or 48 hours. There is no "substantial adverse impact" qualifier in the statute, and there is no separate one-million-gallon tier.

The ORC's parallel duty to the owner

15A NCAC 08G .0204(6) requires the ORC to notify the owner within 24 hours , and in writing within five days of first knowledge, of any:

  • overflow from the system or any treatment process unit;
  • bypass of the system or any treatment process unit; or

violation of any limits or conditions of the permit.

Under .0204(2)(d) the collection system ORC must also visit the system within 24 hours of knowledge of a bypass, spill, or overflow unless a collection system Back-up ORC makes the visit.

The permit-side reporting duty

NPDES and system-wide collection system permits carry their own standard conditions, mirrored from 40 CFR 122.41(l)(6) : any noncompliance that may endanger health or the environment must be reported orally within 24 hours of becoming aware of the circumstances, followed by a written submission within five days that describes the noncompliance and its cause; the period of noncompliance, including exact dates and times and, if it has not been corrected, the anticipated time it is expected to continue; and the steps taken or planned to reduce, eliminate, and prevent recurrence. Bypasses and upsets have their own notice provisions in 122.41(m) and (n).

What goes into the initial report

When calling the DEQ regional office or filing through the Division's electronic reporting system, be ready with:

Permittee name and permit number (collection system or NPDES).

Location — address, nearest intersection, or coordinates — and the manhole, line segment, or pump station involved.

Time the discharge started and stopped (or that it is ongoing) and how the start time was determined.

Estimated volume and the method used to estimate it — pump run-time differential, duration multiplied by an estimated flow rate, or measured depth over a weir.

The receiving stream and its classification, and whether the discharge reached surface waters.

Cause: grease blockage, roots, structural failure, power loss, pump failure, or inflow and infiltration during a storm.

Containment and cleanup actions: vacuum trucks, bypass pumping, berms, lime application, and downstream sampling.

Preventing the next one

The corrective-action portion of the five-day report is where a utility demonstrates that the failure mode has been addressed: a FOG ordinance and grease interceptor inspections for grease blockages; root control and scheduled jetting for root intrusion; CIPP lining or pipe bursting for structural defects; standby generators, quick-connect receptacles, and telemetry for power-related failures; and an I/I reduction program built on flow monitoring, smoke testing, and manhole rehabilitation for wet-weather overflows.

Note

Annual performance report. Separately from spill reporting, G.S. 143-215.1C(a) requires the owner or operator of any permitted municipal or domestic collection system or treatment works with an average annual flow greater than 200,000 gallons per day to provide users and the Department an annual report summarizing system performance and any violations, prepared on a calendar or fiscal year basis and delivered no later than 60 days after the end of that year .