Study guide

5.3 Worked Load-Chart Problems

NCCCO Mobile Crane Operator Certification Exam

Track your progress as you read

Finished sections get a check mark.

1 Introduction & NCCCO Mobile Crane Exam Overview

1.1 NCCCO Mobile Crane Certification Facts 1.2 Eligibility & Certification Process 1.3 Written Exam Blueprint & Study Strategy

2 Site

2.1 Site Assessment & Ground Conditions 2.2 Crane Setup & Outriggers 2.3 Power Lines, Clearances & Hazards

3 Operations

3.1 Inspections & Pre-Operational Checks 3.2 Lifting Operations & Load Handling 3.3 Signals, Communication & Shutdown

4 Technical Knowledge

4.1 Crane Types & Major Components 4.2 Wire Rope & Rigging Hardware 4.3 Stability & Crane Mechanics

5 Load Charts

5.1 Reading the Manufacturer Load Chart 5.2 Gross vs Net Capacity & Deductions 5.3 Worked Load-Chart Problems

6 Final Review & Test-Day Strategy

6.1 High-Yield Recap by Domain 6.2 Load-Chart Readiness Drills 6.3 Test-Day Strategy & Common Pitfalls

5.3 Worked Load-Chart Problems

Key Takeaways Explain This Topic AI

Solve every chart problem with the same sequence: confirm the chart and configuration, find gross capacity at the radius and boom length, subtract all deductions, total the actual load, then compare

Percent of capacity = (total load ÷ net capacity) × 100; the safest answer is usually the configuration with the lowest percent of capacity

A structural-strength limit is set by the crane's components and does not change with outrigger spread, while a stability limit can change with counterweight, outriggers, and quadrant

When a load passes through more than one work area or quadrant, rate the lift for the least favorable (lowest-capacity) condition it will encounter

The most common chart-reading errors are using boom angle instead of radius, ignoring footnotes, comparing bare load to gross capacity, and forgetting that radius grows as the load is picked and the boom deflects

Last updated: May 2026

A Repeatable Method for Every Chart Problem

Every NCCCO load-chart question, no matter how it is worded, can be solved with the same six steps. Memorize the sequence and apply it identically every time:

Confirm the chart and configuration. Right crane, counterweight, outrigger state, on-outriggers vs on-rubber, quadrant.

Determine the operating radius and boom length for the planned lift.

Read gross rated capacity at that radius and boom length from the correct chart.

Subtract all applicable deductions (hook block, ball, jib, aux head, excess wire rope) to get net capacity .

Total the actual load : object + slings + shackles + spreader/beam + any below-hook devices.

Compare : if total load ≤ net capacity and all footnotes are satisfied, the lift is within capacity. Otherwise it is not.

Percent of Capacity

Many questions ask for percent of capacity , which is how heavily the crane is loaded relative to what is allowed:

Percent of capacity = (Total load ÷ Net capacity) × 100

Lower is safer. When a question gives several setups and asks which is best, compute percent of capacity for each and choose the lowest percentage. A value over 100% means an overload.

Worked Problem 1: Is This Lift Safe?

(Illustrative values only.)

  • Given Value
  • Object weight 17,400 lb
  • Slings + shackles 600 lb
  • Hook block 500 lb
  • Gross capacity at planned radius/boom 20,000 lb
  • Footnotes All conditions met

Step 3: Gross capacity = 20,000 lb.

Step 4: Net capacity = 20,000 − 500 (hook block) = 19,500 lb.

Step 5: Total load = 17,400 + 600 = 18,000 lb.

Step 6: 18,000 lb ≤ 19,500 lb, and footnotes are satisfied → the lift is within capacity.

Percent of capacity: (18,000 ÷ 19,500) × 100 = 92.3% . This is within limits but heavily loaded; small radius increases or load swing could push it over, so it warrants extra caution and a test lift.

Worked Problem 2: Radius Grows During the Pick

A frequent trap: the planned radius is read on paper, but in reality the radius increases when the load is picked because the boom deflects and the crane settles slightly. Always use the largest radius the load will actually reach , not the smallest.

  • Given Value
  • Object + rigging 12,000 lb
  • Gross capacity at 30 ft radius 13,000 lb
  • Gross capacity at 35 ft radius 11,200 lb
  • Hook block 400 lb

If the load is set down at 35 ft but lifted at 30 ft, you must rate the lift at the larger radius the load passes through (35 ft) :

  • Net capacity at 35 ft = 11,200 − 400 = 10,800 lb
  • Total load = 12,000 lb

12,000 lb > 10,800 lb → overload at 35 ft. The lift is not safe as planned, even though it would have passed at 30 ft.

Structural vs Stability Limits

Load chart ratings are governed by one of two limits, and the exam expects you to tell them apart:

Limit type Set by Changes with

Structural strength Strength of boom, hoist, and crane components Does not change with outrigger spread or counterweight; fixed by the machine

Stability (tipping) The crane's resistance to tipping Changes with counterweight, outrigger extension, quadrant, and ground support

Charts often draw a bold line, asterisk, or shaded area separating the two. Short-radius, high-capacity cells are usually structurally limited (the steel is the limit). Long-radius cells are usually stability limited (tipping is the limit). A note such as "capacities above the line are limited by structural strength" tells you that adding counterweight or widening outriggers will not raise that number, because the component, not tipping, is the constraint.

Worked Problem 3: Which Setup Is Best?

A 21,000 lb total load can be lifted three ways. Which has the lowest percent of capacity?

  • Setup Gross cap. Deductions Net cap. Percent of capacity
  • A: short boom, 18 ft radius 30,000 800 29,200 71.9%
  • B: mid boom, 25 ft radius 26,000 800 25,200 83.3%
  • C: long boom, 25 ft radius 24,000 1,900 22,100 95.0%

Setup A loads the crane to only 71.9% of net capacity, the lowest of the three, so A is the safest configuration . Setup C is technically within capacity but at 95% it leaves almost no margin for load swing, deflection, or radius growth.

Common Chart-Reading Errors

These are the mistakes the exam is built to catch:

Using boom angle instead of operating radius to enter the capacity grid.

Comparing the bare object weight to gross capacity and ignoring deductions and rigging.

Skipping footnotes (minimum boom angle, parts of line, counterweight, quadrant).

Reading the on-outrigger chart when the crane is actually on rubber.

Ignoring radius growth from boom deflection and ground settlement during the pick.

Rating the strongest quadrant when the load swings through a weaker work area.

Forgetting the load chart, not the operator, is the legal authority — "it felt fine" is never the standard.

If you internalize the six-step method and always rate the least favorable condition, almost every Load Charts question becomes a disciplined arithmetic check rather than a guess.