13.1 Securing, Disconnecting, and Stowing Gear
NCCCO Rigger Level I Exam
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 About the NCCCO Rigger Level I Exam 1.2 Level I vs Level II Scope 1.3 Eligibility, Fees, and Recertification
2 Scope: Load Path and Characteristics
2.1 Identifying the Load Travel Path 2.2 Load Weight and Center of Gravity 2.3 Attachment Points and Lift Points
3 Scope: Hazards and Unsafe Practices
3.1 Special Handling Requirements 3.2 Pinch Points and Softeners 3.3 Load Stability, Shock Load, and Side Loading 3.4 Electrical Hazards, Body Positioning, and Hazard Communication
4 Technical Knowledge: ASME Standards
4.1 ASME B30.9 Slings and B30.10 Hooks 4.2 ASME B30.26 Hardware and B30.20 Below-the-Hook
5 Technical Knowledge: OSHA Regulations
5.1 OSHA 1910.184 and 1926.251 5.2 OSHA 1926.1401 Qualified Rigger 5.3 OSHA 1926.1431 Hoisting Personnel
6 Inspection: Foundations, Wire Rope, and Chain
6.1 Frequent vs Periodic Inspection 6.2 Wire Rope Sling Inspection and Removal Criteria 6.3 Chain Sling Inspection and Removal Criteria
7 Inspection: Synthetic and Specialty Slings
7.1 Synthetic Web Sling Inspection 7.2 Synthetic Round Sling Inspection 7.3 Metal Mesh and Synthetic Rope Sling Inspection
8 Inspection: Hooks, Hardware, and Below-the-Hook Devices
8.1 Hook Inspection (ASME B30.10) 8.2 Shackles, Eyebolts, and Hardware Inspection 8.3 Below-the-Hook Device Inspection
9 Execution: Sling Types and Identification
9.1 Chain and Wire Rope Sling Use 9.2 Synthetic Web and Round Sling Use 9.3 Sling Identification Tags and WLL
10 Execution: Hitches, Angles, and Capacity
10.1 Vertical, Choker, and Basket Hitches 10.2 Sling Angle Factors 10.3 Hitch Capacity Calculations 10.4 Edge Protection and D/d Ratio
11 Execution: Rigging Hardware in Use
11.1 Shackles and Hooks in Use 11.2 Eyebolts and Swivel Hoist Rings 11.3 Wire Rope Clips and Compression Hardware 11.4 Blocks, Beam Clamps, Softeners, and Related Gear
12 Execution: Below-the-Hook Devices, Tag Lines, and Knots
12.1 Below-the-Hook Lifting Devices 12.2 Tag Line Use and Load Control 12.3 Basic Knots for Riggers
13 Execution: Post-Lift Activities and Communication
13.1 Securing, Disconnecting, and Stowing Gear 13.3 Stop Authority and Lift Communication
14 Practical Exam Prep and Study Strategy
14.1 Level I Practical Exam Tasks 14.2 Study Strategy and Exam Day
13.1 Securing, Disconnecting, and Stowing Gear
Key Takeaways Explain This Topic AI
Secure and stabilize the load on the landing surface before any disconnection so residual sling tension cannot jerk hardware free or drop the load.
Disconnect in a controlled sequence: land, set, verify stability, ease residual tension, then remove hardware—never yank under load or cut corners.
Stow gear clean and dry with identification tags readable; protect synthetics from sharp edges, chemicals, UV, and crushing; hang or stage wire rope and chain properly.
Complete site housekeeping after every lift: clear landing zone debris, stage gear for the next lift, and report damaged or untagged equipment before it re-enters service.
Last updated: July 2026
13.1 Securing, Disconnecting, and Stowing Gear
Quick Answer: Land and secure the load first , then ease residual tension and disconnect in a controlled sequence . Never release hardware under hidden tension. Stow gear so tags stay readable , synthetics stay dry/protected , and wire rope/chain are hung or staged without kinks or crushing. Finish with housekeeping so the landing zone and next setup are clear.
Execution of Rigging Activity is about 42% of the NCCCO Rigger Level I written exam. Earlier execution chapters cover hitch selection, angles, hardware, below-the-hook devices, tag lines, and knots. This section closes the physical lift cycle: what you do after the load has been moved so people stay safe, gear stays serviceable, and the next lift does not inherit hazards from a sloppy teardown.
Level I work assumes load weight, center of gravity, and configuration are known or provided . That does not end when the hook starts to lower. A poorly landed load, a sudden disconnect under residual tension, or gear tossed into a mud pile can turn a successful set into an injury, a rework lift, or a failed inspection on the next job.
Why Post-Lift Discipline Is Exam Content
Written items often test sequence and judgment , not only hardware names. Typical failure modes include:
- Disconnecting a choker or shackle while the sling still carries side load or residual hoist tension
- Walking away from a load that is unstable on dunnage , rollers, or a sloping surface
- Dragging synthetic slings across sharp steel after the set
- Storing wet synthetics in a closed bag or under equipment that crushes them
- Leaving identification tags unreadable , painted over, or torn so the next rigger cannot verify WLL
Think of post-lift work as part of the same execution system as attachment: control energy (tension and gravity), protect people, protect gear, and leave a clear path for the next motion.
Secure the Load Before You Disconnect
Rule: The load must be stable on its landing surface before you remove slings, shackles, or below-the-hook devices that were providing restraint or balance during the lift.
What “secured” means in practice
Landing condition Secure actions before disconnect Why it matters
Solid level deck / pad Confirm full bearing on intended supports; stop hoist drift; verify no rock A rocking load can tip when a choke is released
Dunnage / cribbing Place blocking under designed contact points; keep load off soft soil where possible Soft ground sinks and reintroduces tension or tip
Sloped or uneven surface Use chocks, wedges, or temporary bracing per plan; do not rely on sling friction alone Gravity still acts after the hook is free
Vessel, truck, or trailer Confirm vehicle brakes/chocks; use load securement as required before free-hanging gear is removed Vehicle motion can re-energize the load
Temporary set near structure Keep clear of pinch points; ensure set does not lean into personnel paths Partial sets often shift when hardware is freed
Do not treat “the crane stopped moving” as “the load is secure.” Check bearing, level (or planned attitude), and freedom from unexpected roll . If the load must remain temporarily suspended while you adjust blocking, keep people out from under , use planned blocking methods, and do not disconnect primary support until the temporary support is known to be adequate.
Order of operations (landing → secure → disconnect)
Guide the set with tag lines or hands-off guidance as planned; stay clear of crush zones.
Land onto prepared supports (pads, dunnage, structure).
Ease hoist only enough to confirm the load is supported by the landing surface—not still hanging primarily on the hook.
Verify stability (no rock, no lean that will tip when a leg is freed, no soft-ground sink).
Communicate to the signalperson/operator that you are preparing to disconnect (so the crane is not accidentally re-hoisted mid-disconnect).
Relieve residual tension deliberately (see next section).
Disconnect hardware in a planned sequence.
Clear gear from the load path and stow it.
If step 4 fails, re-hoist slightly , correct supports, and re-land. Disconnecting a unstable load to “save time” is the wrong answer on the exam and on the job.
Controlled Disconnection — No Sudden Release Under Residual Tension
Residual tension is force still in the sling legs, shackles, or hitch after the load appears to be down. Sources include:
- Hook still taking part of the weight because the load is on high spots
- A choker that has bitten tight and stores elastic energy
- Multi-leg assemblies where one leg is still tight while another is slack
- Bound hardware (shackle pin hard to turn) that suddenly frees when yanked
- Bound plate clamps or beam clamps that still grip after set
- Safe disconnection principles
Principle Correct practice Incorrect practice
Support first Landing surface carries the load before primary disconnect Free the main hitch while the load still hangs
Ease, don’t yank Lower/hoist micro-adjustments and hand pressure to free; use proper tools Hammering shackles under load; kicking chokers free
Sequence Free secondary restraint after primary support is proven; or follow plan for multi-leg release Random release of whichever pin is easiest
Body position Stand clear of line-of-fire if hardware springs free Hands/face over the path of a flying shackle or recoiling sling
Communication Operator holds position; no unplanned hoist during disconnect Crane moves while fingers are on pins
Chokers: After set, a choke may remain tight. Do not stand in the snap-back path. Ease tension with the crane or carefully work the choke free once the load is fully supported. If the choke will not release safely, re-engage planned support and reassess—do not cut synthetic slings as a “fast fix” unless an authorized emergency procedure and cut plan exist (and even then, that is not Level I routine practice).
Shackles and pins: Seat the load, relieve tension so the pin can turn by hand or with the designed tool, remove cotter/keep as required, and open the bow only when it is no longer load-bearing. Never leave a partially engaged pin as “good enough for the next guy.”
Hooks and latches: After disconnect, ensure the empty hook is not left swinging through the work area. Signal a controlled raise/park of the block once people and gear are clear.
Sudden release hazards: A sling under residual tension can strike personnel, pull the load off cribbing, or damage load corners. Exam answers that celebrate “just pull hard and it pops free” are wrong.
Stow Gear Properly — Protect Slings and Keep Tags Readable
After disconnection, gear is either staged for the next lift or returned to storage . Both require discipline.
Synthetic web and round slings
Keep clean and dry when practical; remove grit that will abrade fibers on the next hitch.
Hang or loosely coil per site practice; do not permanently store under pallets, steel plate, or vehicle tires.
Avoid UV and chemicals for long-term storage; do not leave soaked in solvents or battery acid splash zones.
Protect from sharp edges while carrying—do not drag across rebar, decking burrs, or hot surfaces.
Tags and labels must remain legible (WLL, material, manufacturer identification as required). If a tag is destroyed during the job, remove the sling from service until properly identified—do not invent capacity from memory.
Wire rope slings
Avoid kinks and reverse bends when coiling.
Do not drop coils from height onto hard surfaces.
Keep away from welding spatter , acid, and conditions that accelerate corrosion when storage is long-term.
Stage so loops are not crushed under equipment.
Chain slings
Hang by the master link when possible so legs do not tangle into twisted knots.
Do not throw chains into piles that hide stretch, nicks, or gouges for the next pre-use check.
Keep identification and rating marks available for the next inspection.
Hardware (shackles, eyebolts, hoist rings, clamps)
Reassemble pins and nuts so parts do not scatter and get replaced with the wrong size later.
- Do not mix unmarked hardware into a “miscellaneous bolt bucket.”
- Report bent, spread, cracked, or unlatched items immediately—do not stash them for “light duty.”
Gear type Preferred stow habit Tag / ID rule
Synthetic web/round Hang dry; protect from UV, chemicals, crushing Tag readable; unreadable tag → remove from service
- Wire rope sling Coil without kinks; protect from corrosion/spatter Keep manufacturer identification available
- Chain sling Hang by master link; legs free of twists Rating/ID legible for next use
Shackles / hardware Pins with bodies; clean and sorted by size/type No unmarked mystery hardware in lift service
- BTH devices Store per manufacturer; protect locks and pads Capacity and orientation markings must remain clear
- Site Housekeeping After the Lift
Housekeeping is not “extra”—it is how you prevent the next incident.
Clear the landing zone of unused dunnage, cut banding, loose pins, and trash that create trip and puncture hazards. Recover tag lines so they are not left as snags for forklifts or personnel. Park the hook or boom per site rules once the area is clear. Segregate damaged gear from serviceable gear so nobody grabs a cut web sling for the afternoon pour.
A good post-lift walk-through answers:
Is the load stable and done moving without our gear?
Is all tension released and hardware accounted for?
Are slings and hardware staged or stored without damage pathways?
Are tags readable and reject items tagged out?
Is the travel path clear for people and equipment after we leave?
Common Exam Traps
Trap: “The load is down, so disconnect immediately.” Correct: Secure, verify support, ease tension, then disconnect.
Trap: “A wet synthetic can dry in a sealed bag overnight.” Correct: Prefer drying/hanging practices that avoid mold, hidden damage, and crushing; follow manufacturer guidance.
Trap: “Missing tag is fine if WLL was known last month.” Correct: Unidentified sling = not for lift service until properly identified.
Trap: “Yanking a stuck choker is normal skill.” Correct: Controlled tension relief and clear body position; reassess if it will not free safely.
Trap: “Housekeeping is only the laborer’s job.” Correct: Riggers own gear condition and landing-zone safety as part of execution.
Integration With the Rest of Execution
Post-lift work links back to inspection (you may discover damage only at teardown), hitch knowledge (chokers bind differently than baskets), and communication (operator must not re-hoist while your hands are on pins). Chapter sections on hand signals and stop authority build on this: the disconnect phase is a high-risk window where a single unplanned hoist or swing can injure the person under the hook path.
Level I Bottom Line
Finish every lift the way you started it— under control . Secure before disconnect. Ease residual tension. Protect gear and tags. Leave the site ready for the next safe lift. That sequence is core Execution content for NCCCO Rigger Level I.