Study guide

11.2 Choker Hitches, Choke Angle and Bundles

NCCCO Rigger Level II Exam

Track your progress as you read

Finished sections get a check mark.

1 Certification and Exam Preparation

1.1 Current Exam, Eligibility and Scheduling 1.2 Practical Tasks and Examination-Specific Rules 1.3 Study Method, References and Recertification

2 Identify and Measure the Load

2.1 Load Identity, Dimensions and Units 2.2 Load Weight, Density and Complete Inventories 2.3 Composition, Structural Integrity and Special Handling

3 Center of Gravity and Support Geometry

3.1 Center of Gravity and Suspended Stability 3.2 Attachment Points and Complete Force Paths 3.3 Final Position, Landing Supports and Derigging Access

4 Route and Site Hazards

4.1 Travel Path, Clearance and Work-Zone Control 4.2 Power Lines, Clearance Options and Electrical Response 4.3 Weather, Temperature and Ground Conditions

5 Team Duties and Communications

5.1 Signalperson Duties and Reliable Signals 5.2 Equipment Operator Duties and Capacity Decisions 5.3 Lift Director, Qualified Rigger and Hazard Communication

6 Equipment Requirements and Lift Planning

6.1 Determine Equipment Requirements and Compatibility 6.2 Written Plans, Sequence and Change Control 6.3 Critical-Lift Criteria, Risk and Contingencies

7 Balanced Sling Forces

7.1 Two-Leg Tension and Angle Reference 7.2 Length-to-Height Geometry and Headroom 7.3 Horizontal Forces and Attachment Demand

8 Composite and Unequal Loads

8.1 Composite Center of Gravity by Moments 8.2 Off-Center Reactions and Compatible Sling Geometry 8.3 Three- and Four-Leg Assemblies and Load Sharing

9 Wire Rope, Chain and Metal Mesh Slings

9.1 Select and Use Wire-Rope Slings 9.2 Alloy-Chain Assemblies and Approved Adjustment 9.3 Metal-Mesh Slings: Selection, Contact and Removal

10 Synthetic Rope, Web and Roundslings

10.1 Synthetic-Rope Slings and Approved Splices 10.2 Synthetic-Web Slings and Material Compatibility 10.3 Roundslings, Core Protection and Performance Fibers

11 Hitch Application and Sling Protection

11.1 Vertical and Basket Hitch Capacity 11.2 Choker Hitches, Choke Angle and Bundles 11.3 Softeners, Bend Protection and Cut Protection

12 Shackles, Hooks and Collector Hardware

12.1 Shackle Types, Pin Seating and Side Loading 12.2 Hooks, Latches and Permitted Load Seating 12.3 Master Links, Rings and Swivels

13 Threaded Points and Adjustable Hardware

13.1 Eyebolts, Shoulder Seating and Angular Demand 13.2 Swivel Hoist Rings and Installation Torque 13.3 Turnbuckles and Chain Hardware in Adjustable Systems

14 Compression Hardware and Rigging Blocks

14.1 Wire-Rope Clips and Permitted Terminations 14.2 Wedge Sockets, Rope Alignment and Tail Security 14.3 Rigging Blocks, Resultants and Reeving

15 Manual, Lever and Powered Hoists

15.1 Manual Chain Falls and Vertical Hoisting 15.2 Lever Hoists, Pulling Direction and Controlled Adjustment 15.3 Air and Electric Hoists: Supply, Duty and Controls

16 Jacks, Rollers and Portable Supports

16.1 Jacks, Toe Ratings and Positive Support 16.2 Dollies, Skates, Rollers and Horizontal Control 16.3 A-Frames, Gantries and Trolley Compatibility

17 Structural Lifters and Clamps

17.1 Lifting Beams, Spreaders and Configuration Ratings 17.2 Plate Clamps, Material Limits and Grip Conditions 17.3 Beam Clamps as Attachments and Beam/Girder Lifters

18 Mechanical, Vacuum and Magnetic Devices

18.1 Mechanical and Vacuum Lifting Devices 18.2 Close-Proximity and Remotely Operated Lifting Magnets 18.3 Scrap and Material-Handling Grapples

19 Inspection, Removal and Records

19.1 Inspecting All Six Sling Families 19.2 Hook and Rigging-Hardware Inspection 19.3 Below-the-Hook Device Inspection and Testing

20 Lift Control, Rotation and Completion

20.1 Take-Up, Trial Lift and Load Control 20.2 Controlled Rotation, Upending and Multiple-Crane Lifts 20.3 Secure the Load, Remove Rigging and Stow Equipment

21 Technical Standards and Crane Capacity

21.1 Apply the Correct Standard and Regulatory Scope 21.2 Crane Charts, Suspended Weight and Capacity Deductions 21.3 Personnel Hoisting Under OSHA 1926.1431

11.2 Choker Hitches, Choke Angle and Bundles

Key Takeaways Explain This Topic AI

Choke angle and horizontal sling angle are different quantities.

Do not transfer one sling family’s reduction table to another.

A double wrap does not double capacity or guarantee every bundle piece is retained.

Last updated: October 2026

Understand where the choke carries force

A choker hitch passes a sling around the load and through its eye or approved fitting so that tension tightens the loop. The choke introduces bending and contact conditions distinct from a vertical hitch. The applicable choker rating may be lower than the vertical rating and can depend on the angle at the choke.

Distinguish the choke angle from the angle of a sling leg relative to horizontal. The choke angle describes the geometry where the sling tightens through its eye or fitting. A horizontal leg-angle factor does not replace a choke-angle adjustment. Some problems require both checks, and the correct table must identify which angle it describes.

Different materials and products have different choker ratings and instructions. A table for wire-rope choke-angle reductions is not automatically a web-sling or chain table. Do not teach one series of percentages as universal across all six sling families. Use the actual manufacturer information or the data explicitly supplied in the examination problem.

Read a supplied adjustment once

Suppose a problem gives an applicable baseline choker rating of 8,000 lb and states that the actual choke condition requires a factor of 0.75 not already included. The adjusted capacity is 6,000 lb . A 6,500-lb demand exceeds it. The factor is training data for that described sling, not a general choke-angle rule.

  • Supplied quantity Use
  • Vertical WLL Applies to the specified vertical condition
  • Baseline choker WLL Already includes the product’s basic choker rating
  • Additional choke factor Apply only when required and not already included
  • Leg angle Evaluate separate tension or assembly capacity effects

A frequent mistake is applying the basic choker reduction twice: once by selecting the choker column, then again by multiplying by a remembered generic factor. Another is applying no additional reduction when the manufacturer’s table requires one for an acute choke. Trace exactly what each value includes.

Seat the hitch as instructed

The sling should tighten at the intended location without placing an eye splice, sleeve or fitting into an unapproved bearing condition. The choke must not be forced to bend a fitting or trap the load-bearing splice against an edge. Check that the body can tighten without twisting, snagging or cutting.

A choke around a smooth or tapered load can move. Position it according to the approved handling method, considering the CG and the complete movement. An initially secure choke may loosen when orientation changes or when a load end contacts a support. Examine intermediate positions as well as lift-off.

Screw-pin shackles require particular caution when used in arrangements where the load can slide across the pin and rotate it. Manufacturer instructions can prohibit that application and recommend bolt-type hardware. Do not solve retention by backing a screw pin off or adding an improvised substitute pin. Choose the permitted connection for the actual sliding behavior.

Bundles need complete retention

A choker can gather a bundle, but not every piece is positively captured merely because the outside pieces are tight. Loose internal parts, short pieces, smooth surfaces and uneven lengths can create escape paths. A double-wrap choker may improve contact in an approved arrangement, but it does not guarantee retention or double the sling’s capacity.

The plan should specify how all pieces are secured and supported, whether lifting bands or restraints are approved, and how the bundle remains stable during travel and landing. Shipping bands may hold packaging together without being rated lifting attachments. Do not attach to them unless the manufacturer approves that use.

Bundle scenario

A long pipe bundle contains several short pieces hidden inside. Two outer chokers grip the long pipes but do not necessarily retain the short pieces. The rigger must identify and resolve that condition through an approved method before lifting. More crane capacity does not prevent an unrestrained piece from falling out.

Monitor tightening and release

As initial tension develops, keep hands out of the closing choke and clear of load contact. Observe from a protected position that the hitch seats and protection stays in place. If the sling migrates or the choke binds against an unintended feature, stop safely and lower for correction.

When landing, ensure the load is stable before slackening. A bundle that was held together partly by the choke may spread as tension releases. Provide the planned supports and restraints so the final resting condition remains safe. Remove the sling without dragging it beneath the load or allowing heavy fittings to fall.

The exam decision is a chain of checks: choose the correct hitch rating, interpret any stated choke-angle factor, evaluate leg geometry if relevant, verify contact and retention, then apply the approved operating sequence. A single remembered “choker is 80%” answer does not resolve all of these conditions.

Source: CCO reference materials and sling capacity information .