Study guide
15.1 Manual Chain Falls and Vertical Hoisting
NCCCO Rigger Level II Exam
Track your progress as you read
Finished sections get a check mark.
1 Certification and Exam Preparation
1.1 Current Exam, Eligibility and Scheduling 1.2 Practical Tasks and Examination-Specific Rules 1.3 Study Method, References and Recertification
2 Identify and Measure the Load
2.1 Load Identity, Dimensions and Units 2.2 Load Weight, Density and Complete Inventories 2.3 Composition, Structural Integrity and Special Handling
3 Center of Gravity and Support Geometry
3.1 Center of Gravity and Suspended Stability 3.2 Attachment Points and Complete Force Paths 3.3 Final Position, Landing Supports and Derigging Access
4 Route and Site Hazards
4.1 Travel Path, Clearance and Work-Zone Control 4.2 Power Lines, Clearance Options and Electrical Response 4.3 Weather, Temperature and Ground Conditions
5 Team Duties and Communications
5.1 Signalperson Duties and Reliable Signals 5.2 Equipment Operator Duties and Capacity Decisions 5.3 Lift Director, Qualified Rigger and Hazard Communication
6 Equipment Requirements and Lift Planning
6.1 Determine Equipment Requirements and Compatibility 6.2 Written Plans, Sequence and Change Control 6.3 Critical-Lift Criteria, Risk and Contingencies
7 Balanced Sling Forces
7.1 Two-Leg Tension and Angle Reference 7.2 Length-to-Height Geometry and Headroom 7.3 Horizontal Forces and Attachment Demand
8 Composite and Unequal Loads
8.1 Composite Center of Gravity by Moments 8.2 Off-Center Reactions and Compatible Sling Geometry 8.3 Three- and Four-Leg Assemblies and Load Sharing
9 Wire Rope, Chain and Metal Mesh Slings
9.1 Select and Use Wire-Rope Slings 9.2 Alloy-Chain Assemblies and Approved Adjustment 9.3 Metal-Mesh Slings: Selection, Contact and Removal
10 Synthetic Rope, Web and Roundslings
10.1 Synthetic-Rope Slings and Approved Splices 10.2 Synthetic-Web Slings and Material Compatibility 10.3 Roundslings, Core Protection and Performance Fibers
11 Hitch Application and Sling Protection
11.1 Vertical and Basket Hitch Capacity 11.2 Choker Hitches, Choke Angle and Bundles 11.3 Softeners, Bend Protection and Cut Protection
12 Shackles, Hooks and Collector Hardware
12.1 Shackle Types, Pin Seating and Side Loading 12.2 Hooks, Latches and Permitted Load Seating 12.3 Master Links, Rings and Swivels
13 Threaded Points and Adjustable Hardware
13.1 Eyebolts, Shoulder Seating and Angular Demand 13.2 Swivel Hoist Rings and Installation Torque 13.3 Turnbuckles and Chain Hardware in Adjustable Systems
14 Compression Hardware and Rigging Blocks
14.1 Wire-Rope Clips and Permitted Terminations 14.2 Wedge Sockets, Rope Alignment and Tail Security 14.3 Rigging Blocks, Resultants and Reeving
15 Manual, Lever and Powered Hoists
15.1 Manual Chain Falls and Vertical Hoisting 15.2 Lever Hoists, Pulling Direction and Controlled Adjustment 15.3 Air and Electric Hoists: Supply, Duty and Controls
16 Jacks, Rollers and Portable Supports
16.1 Jacks, Toe Ratings and Positive Support 16.2 Dollies, Skates, Rollers and Horizontal Control 16.3 A-Frames, Gantries and Trolley Compatibility
17 Structural Lifters and Clamps
17.1 Lifting Beams, Spreaders and Configuration Ratings 17.2 Plate Clamps, Material Limits and Grip Conditions 17.3 Beam Clamps as Attachments and Beam/Girder Lifters
18 Mechanical, Vacuum and Magnetic Devices
18.1 Mechanical and Vacuum Lifting Devices 18.2 Close-Proximity and Remotely Operated Lifting Magnets 18.3 Scrap and Material-Handling Grapples
19 Inspection, Removal and Records
19.1 Inspecting All Six Sling Families 19.2 Hook and Rigging-Hardware Inspection 19.3 Below-the-Hook Device Inspection and Testing
20 Lift Control, Rotation and Completion
20.1 Take-Up, Trial Lift and Load Control 20.2 Controlled Rotation, Upending and Multiple-Crane Lifts 20.3 Secure the Load, Remove Rigging and Stow Equipment
21 Technical Standards and Crane Capacity
21.1 Apply the Correct Standard and Regulatory Scope 21.2 Crane Charts, Suspended Weight and Capacity Deductions 21.3 Personnel Hoisting Under OSHA 1926.1431
15.1 Manual Chain Falls and Vertical Hoisting
Key Takeaways Explain This Topic AI
The hand chain operates the mechanism; the load chain is not a sling.
Verify both raising and controlled-lowering travel.
Independent hoists do not automatically equalize an off-center load.
Last updated: October 2026
Distinguish the operating chain from the load chain
A manual chain fall uses a hand chain to operate gearing that raises or lowers a separate load chain and hook. The hand chain is an operating control, not a sling. The load chain is part of the hoist’s rated mechanism and must not be replaced with ordinary chain or wrapped around the payload as an improvised sling.
Select a hoist with adequate rated load, lift travel, headroom and mounting arrangement. Its top support must carry the complete imposed demand, including applicable hoist weight and operating effects. A rated hoist suspended from an unverified pipe or ceiling member does not establish a rated system.
Manual operation can suit precise, low-speed lifting where power is unavailable, but operator effort is not a load indicator. A mechanism can generate high force through gearing even when the pull feels manageable. If the load does not move as expected, stop and identify the obstruction rather than adding people to the hand chain.
Verify the support and hook seating
Attach the upper hook or suspension through an approved connection that permits alignment. The force must enter the intended bowl rather than the tip or latch. Keep the hoist body clear of obstructions. A side pull can change the load path and damage the suspension or mechanism; follow the manufacturer’s permitted operating direction.
- Selection item Why it matters
- Rated load Limits the force carried by the mechanism
- Lift range Must complete raising and controlled lowering
- Headroom Includes the body and hook arrangement
- Upper support Must be approved for the imposed demand
- Operator access Provides safe hand-chain operation without entering the fall zone
- Load path Avoids side pulling, binding and obstructions
A hoist with enough travel to reach a destination may still have insufficient lowering range for an abort or transfer. Consider the whole sequence, including initial attachment and safe return. Do not arrive at the end of chain travel while the only option is an improvised new suspension.
Inspect before operation
Check identification, chain condition, hooks, latches where required, brake function, suspension and other specified components. The load chain must be correctly reeved and free of twists. A twisted chain can bind or damage the mechanism. Manufacturer instructions define the inspection and functional-check procedure.
Inspect for damaged links, wear, corrosion, deformation and unauthorized repairs. Do not use a hoist with missing required labels or an uncertain rating. A successful previous lift does not prove present condition. The support and lower rigging require their own inspection as well.
Do not lubricate or service components arbitrarily. The chain and brake may have different maintenance requirements, and an inappropriate lubricant can impair function. Authorized maintenance follows the product manual; the rigger’s pre-use inspection identifies defects and removes unsuitable equipment from use.
Operate smoothly and observe control
Take slack slowly, verifying both hooks seat and the load chain aligns. Keep hands and body clear of closing connections. Carry out the planned small lift and check that the load holds as required by the manufacturer and plan. Unexpected drift or brake movement requires stopping use and a controlled response.
Avoid shock loading and pulling the hand chain beyond its intended operating method. Do not attach a motor, power drill or winch to a manual chain hoist unless the manufacturer explicitly provides that system. More input force can overload the mechanism or supporting structure rather than safely increase capacity.
Two-hoist example
Two manual hoists support an off-center machine. A 12,000-lb total does not mean each automatically carries 6,000 lb. Calculate reactions from the actual CG and support geometry, then verify each hoist’s capacity and the movement sequence. Independent changes in height can alter attitude and impose unintended forces.
Ordinary independent hoists are not an automatic equalizing system. Use an approved plan for coordinated movement and transfers. One operator taking extra chain to level the load can change another connection’s demand, so clear communication and hold points are needed.
Land before disconnecting
Set the load on approved supports, install required restraints and verify stability before releasing tension. The lower hook may move suddenly when a tight connection becomes slack. Remove it from a safe position without letting heavy gear drop.
If the load must remain suspended, follow the equipment and site’s permitted holding procedure and maintain required supervision and controls. Do not assume a manual brake allows indefinite unattended suspension or serves as a permanent structural support.
The Level II practical course uses chain-fall hoists with its own task restrictions. The second hoist is prohibited for the level-lift task and permitted for frame rotation. Those exam rules concern the course, while the field hoist still needs its manufacturer’s load, chain, support and operating requirements.
Sources: CCO hoist topic and practical outline , CMCO hoist manuals .