Study guide

19.1 Inspecting All Six Sling Families

NCCCO Rigger Level II Exam

Track your progress as you read

Finished sections get a check mark.

1 Certification and Exam Preparation

1.1 Current Exam, Eligibility and Scheduling 1.2 Practical Tasks and Examination-Specific Rules 1.3 Study Method, References and Recertification

2 Identify and Measure the Load

2.1 Load Identity, Dimensions and Units 2.2 Load Weight, Density and Complete Inventories 2.3 Composition, Structural Integrity and Special Handling

3 Center of Gravity and Support Geometry

3.1 Center of Gravity and Suspended Stability 3.2 Attachment Points and Complete Force Paths 3.3 Final Position, Landing Supports and Derigging Access

4 Route and Site Hazards

4.1 Travel Path, Clearance and Work-Zone Control 4.2 Power Lines, Clearance Options and Electrical Response 4.3 Weather, Temperature and Ground Conditions

5 Team Duties and Communications

5.1 Signalperson Duties and Reliable Signals 5.2 Equipment Operator Duties and Capacity Decisions 5.3 Lift Director, Qualified Rigger and Hazard Communication

6 Equipment Requirements and Lift Planning

6.1 Determine Equipment Requirements and Compatibility 6.2 Written Plans, Sequence and Change Control 6.3 Critical-Lift Criteria, Risk and Contingencies

7 Balanced Sling Forces

7.1 Two-Leg Tension and Angle Reference 7.2 Length-to-Height Geometry and Headroom 7.3 Horizontal Forces and Attachment Demand

8 Composite and Unequal Loads

8.1 Composite Center of Gravity by Moments 8.2 Off-Center Reactions and Compatible Sling Geometry 8.3 Three- and Four-Leg Assemblies and Load Sharing

9 Wire Rope, Chain and Metal Mesh Slings

9.1 Select and Use Wire-Rope Slings 9.2 Alloy-Chain Assemblies and Approved Adjustment 9.3 Metal-Mesh Slings: Selection, Contact and Removal

10 Synthetic Rope, Web and Roundslings

10.1 Synthetic-Rope Slings and Approved Splices 10.2 Synthetic-Web Slings and Material Compatibility 10.3 Roundslings, Core Protection and Performance Fibers

11 Hitch Application and Sling Protection

11.1 Vertical and Basket Hitch Capacity 11.2 Choker Hitches, Choke Angle and Bundles 11.3 Softeners, Bend Protection and Cut Protection

12 Shackles, Hooks and Collector Hardware

12.1 Shackle Types, Pin Seating and Side Loading 12.2 Hooks, Latches and Permitted Load Seating 12.3 Master Links, Rings and Swivels

13 Threaded Points and Adjustable Hardware

13.1 Eyebolts, Shoulder Seating and Angular Demand 13.2 Swivel Hoist Rings and Installation Torque 13.3 Turnbuckles and Chain Hardware in Adjustable Systems

14 Compression Hardware and Rigging Blocks

14.1 Wire-Rope Clips and Permitted Terminations 14.2 Wedge Sockets, Rope Alignment and Tail Security 14.3 Rigging Blocks, Resultants and Reeving

15 Manual, Lever and Powered Hoists

15.1 Manual Chain Falls and Vertical Hoisting 15.2 Lever Hoists, Pulling Direction and Controlled Adjustment 15.3 Air and Electric Hoists: Supply, Duty and Controls

16 Jacks, Rollers and Portable Supports

16.1 Jacks, Toe Ratings and Positive Support 16.2 Dollies, Skates, Rollers and Horizontal Control 16.3 A-Frames, Gantries and Trolley Compatibility

17 Structural Lifters and Clamps

17.1 Lifting Beams, Spreaders and Configuration Ratings 17.2 Plate Clamps, Material Limits and Grip Conditions 17.3 Beam Clamps as Attachments and Beam/Girder Lifters

18 Mechanical, Vacuum and Magnetic Devices

18.1 Mechanical and Vacuum Lifting Devices 18.2 Close-Proximity and Remotely Operated Lifting Magnets 18.3 Scrap and Material-Handling Grapples

19 Inspection, Removal and Records

19.1 Inspecting All Six Sling Families 19.2 Hook and Rigging-Hardware Inspection 19.3 Below-the-Hook Device Inspection and Testing

20 Lift Control, Rotation and Completion

20.1 Take-Up, Trial Lift and Load Control 20.2 Controlled Rotation, Upending and Multiple-Crane Lifts 20.3 Secure the Load, Remove Rigging and Stow Equipment

21 Technical Standards and Crane Capacity

21.1 Apply the Correct Standard and Regulatory Scope 21.2 Crane Charts, Suspended Weight and Capacity Deductions 21.3 Personnel Hoisting Under OSHA 1926.1431

19.1 Inspecting All Six Sling Families

Key Takeaways Explain This Topic AI

The 1910.184 wire-rope 10/5 broken-wire rule is measured over one rope lay.

1926.251 states a different construction wire-break criterion over eight rope diameters.

Alloy chain periodic intervals must not exceed 12 months under the named OSHA provisions.

A trial lift does not override a removal criterion.

Last updated: October 2026

Inspection is a decision about continued use

ASME B30.9 addresses slings; OSHA 1910.184 and 1926.251 contain legally applicable sling provisions within their respective scopes. The CCO handbook names periodic inspection, while the online outline also names frequent inspection. Prepare for both: frequent observation detects damage from current use, and periodic inspection thoroughly examines the sling under a documented inspection program.

Under OSHA 1910.184, a competent person designated by the employer inspects each day before use, with additional inspections where service warrants. OSHA 1926.251 requires rigging equipment inspection before each shift and as necessary during use, and its sling subsection also requires a designated competent person's daily examination of slings and attachments. A recent periodic inspection does not replace these checks.

Identify the sling, its legible rating and construction before comparing its condition with the applicable criteria. Inspect the complete length, eyes, splices, fittings, stitching and load-bearing parts. Isolate a defective sling so it cannot be selected again. A tag reading “inspect later” does not make it usable today.

Wire rope: know what is being counted

OSHA 1910.184(f)(5) requires removal for ten randomly distributed broken wires in one rope lay or five in one strand in one lay. A rope lay is the axial distance over which one strand makes a complete turn around the rope. It is not one rope diameter or a fixed six-inch interval.

Other removal conditions include wear or scraping of one-third of the original diameter of outside individual wires, kinking, crushing, birdcaging or other structural distortion, heat damage, damaged end attachments and corrosion of the rope or fittings. Do not confuse an individual-wire wear limit with a percentage of the complete rope diameter.

Construction regulation 1926.251(c)(4)(iv) instead specifies removal where more than 10% of visible wires are broken in any length of eight rope diameters, or where excessive wear, corrosion or other defect exists. These are different stated criteria. Apply the provisions and manufacturer/ASME requirements governing the actual sling; do not label the 10/5 rule as the identical text of both OSHA sections.

Fiber-core wire rope slings exposed above 200°F must be permanently removed under 1910.184. For non-fiber-core slings used above 400°F or below −60°F, that section calls for manufacturer recommendations. Product limitations can be stricter. Uncertain overheating or damaged fittings require assessment before continued use, not an improvised capacity reduction.

Alloy chain: measure each link properly

Look for wear, defective welds, cracks, bent or twisted links, increased length, corrosion and damaged attachments. OSHA requires immediate removal where the specified defects or deterioration are present. There is no general permission to use a visibly stretched chain until elongation reaches 5%.

Measure worn links at their most worn location and compare with the correct chain-size table and manufacturer criteria. OSHA's chain-wear tables give size-specific minimum dimensions; a universal “10% chain wear” shortcut is not a replacement. Inspect coupling links, pins, hooks and shortening devices with their own criteria.

Thorough periodic inspection intervals for alloy steel chain slings depend on use frequency, service severity, lift nature and experience, and may never exceed 12 months under the two OSHA sections. Retain a record of the most recent inspection month for each sling. New, repaired or reconditioned alloy chain slings require the prescribed manufacturer or equivalent-entity proof test and a retained certificate before use.

Metal mesh: fabric and handles both matter

Under OSHA 1910.184(g), removal conditions include a broken weld or braze along the sling edge, a broken wire anywhere in the mesh, lack of flexibility from distortion, and reductions in wire diameter of 25% from abrasion or 15% from corrosion. Distorted handles, cracks and the stated handle-wear criteria also require removal.

The section identifies more than 10% increases in the female handle slot depth or handle eye width, and more than 15% reduction in original handle cross-sectional area around the eye, among its criteria. These are metal-mesh handle conditions, not thresholds for unrelated shackles. A damaged mesh sling is not repaired by wiring the torn mesh together.

New and repaired mesh slings require the specified proof test of at least 1.5 times rated capacity before use; the test precedes required coatings where the provision specifies. Repaired slings have a permanently marked or recorded repair date and repairer's identity, retained as required. Follow the complete applicable repair and testing provisions rather than applying chain documentation rules to every family.

Fiber rope, web and roundslings

Sling Important examination points

Natural/synthetic rope Abnormal wear, powdered fibers, broken/cut fibers, altered strand size or rounding, discoloration/rot and distorted fittings

Synthetic web Acid/caustic burns, melting/charring, cuts, tears, snags, broken/worn load-bearing stitching and fitting distortion

Roundslings Missing identification, cover damage exposing core, core damage, heat/chemical damage, knots and damaged fittings under manufacturer/B30.9 criteria

Roundslings have a protective cover over load-bearing core yarns. Do not judge the core as sound merely because the outer sleeve hides it. Conversely, do not invent a universal permissible cut length in the cover. Use the product's removal instructions and qualified assessment where condition is uncertain.

Chemical and temperature exposure must be considered even when no obvious cut exists. OSHA specifically prohibits nylon web where acids or phenolics are present and polyester or polypropylene web where caustics are present; aluminum fittings cannot be used where caustics are present. Store and handle each material to preserve identification and prevent contamination.

Act on the finding

Stop, isolate, identify and report the condition. Repair is performed only through the authorized manufacturer or equivalent process applicable to that sling, with required testing and identification restored. Inspect the replacement as well. A successful low trial lift cannot validate a sling already meeting a removal criterion, because failure may occur on the next movement.

Sources: OSHA 1910.184 , OSHA 1926.251 , CCO sling references .