Study guide
2.1 Load Identity, Dimensions and Units
NCCCO Rigger Level II Exam
Track your progress as you read
Finished sections get a check mark.
1 Certification and Exam Preparation
1.1 Current Exam, Eligibility and Scheduling 1.2 Practical Tasks and Examination-Specific Rules 1.3 Study Method, References and Recertification
2 Identify and Measure the Load
2.1 Load Identity, Dimensions and Units 2.2 Load Weight, Density and Complete Inventories 2.3 Composition, Structural Integrity and Special Handling
3 Center of Gravity and Support Geometry
3.1 Center of Gravity and Suspended Stability 3.2 Attachment Points and Complete Force Paths 3.3 Final Position, Landing Supports and Derigging Access
4 Route and Site Hazards
4.1 Travel Path, Clearance and Work-Zone Control 4.2 Power Lines, Clearance Options and Electrical Response 4.3 Weather, Temperature and Ground Conditions
5 Team Duties and Communications
5.1 Signalperson Duties and Reliable Signals 5.2 Equipment Operator Duties and Capacity Decisions 5.3 Lift Director, Qualified Rigger and Hazard Communication
6 Equipment Requirements and Lift Planning
6.1 Determine Equipment Requirements and Compatibility 6.2 Written Plans, Sequence and Change Control 6.3 Critical-Lift Criteria, Risk and Contingencies
7 Balanced Sling Forces
7.1 Two-Leg Tension and Angle Reference 7.2 Length-to-Height Geometry and Headroom 7.3 Horizontal Forces and Attachment Demand
8 Composite and Unequal Loads
8.1 Composite Center of Gravity by Moments 8.2 Off-Center Reactions and Compatible Sling Geometry 8.3 Three- and Four-Leg Assemblies and Load Sharing
9 Wire Rope, Chain and Metal Mesh Slings
9.1 Select and Use Wire-Rope Slings 9.2 Alloy-Chain Assemblies and Approved Adjustment 9.3 Metal-Mesh Slings: Selection, Contact and Removal
10 Synthetic Rope, Web and Roundslings
10.1 Synthetic-Rope Slings and Approved Splices 10.2 Synthetic-Web Slings and Material Compatibility 10.3 Roundslings, Core Protection and Performance Fibers
11 Hitch Application and Sling Protection
11.1 Vertical and Basket Hitch Capacity 11.2 Choker Hitches, Choke Angle and Bundles 11.3 Softeners, Bend Protection and Cut Protection
12 Shackles, Hooks and Collector Hardware
12.1 Shackle Types, Pin Seating and Side Loading 12.2 Hooks, Latches and Permitted Load Seating 12.3 Master Links, Rings and Swivels
13 Threaded Points and Adjustable Hardware
13.1 Eyebolts, Shoulder Seating and Angular Demand 13.2 Swivel Hoist Rings and Installation Torque 13.3 Turnbuckles and Chain Hardware in Adjustable Systems
14 Compression Hardware and Rigging Blocks
14.1 Wire-Rope Clips and Permitted Terminations 14.2 Wedge Sockets, Rope Alignment and Tail Security 14.3 Rigging Blocks, Resultants and Reeving
15 Manual, Lever and Powered Hoists
15.1 Manual Chain Falls and Vertical Hoisting 15.2 Lever Hoists, Pulling Direction and Controlled Adjustment 15.3 Air and Electric Hoists: Supply, Duty and Controls
16 Jacks, Rollers and Portable Supports
16.1 Jacks, Toe Ratings and Positive Support 16.2 Dollies, Skates, Rollers and Horizontal Control 16.3 A-Frames, Gantries and Trolley Compatibility
17 Structural Lifters and Clamps
17.1 Lifting Beams, Spreaders and Configuration Ratings 17.2 Plate Clamps, Material Limits and Grip Conditions 17.3 Beam Clamps as Attachments and Beam/Girder Lifters
18 Mechanical, Vacuum and Magnetic Devices
18.1 Mechanical and Vacuum Lifting Devices 18.2 Close-Proximity and Remotely Operated Lifting Magnets 18.3 Scrap and Material-Handling Grapples
19 Inspection, Removal and Records
19.1 Inspecting All Six Sling Families 19.2 Hook and Rigging-Hardware Inspection 19.3 Below-the-Hook Device Inspection and Testing
20 Lift Control, Rotation and Completion
20.1 Take-Up, Trial Lift and Load Control 20.2 Controlled Rotation, Upending and Multiple-Crane Lifts 20.3 Secure the Load, Remove Rigging and Stow Equipment
21 Technical Standards and Crane Capacity
21.1 Apply the Correct Standard and Regulatory Scope 21.2 Crane Charts, Suspended Weight and Capacity Deductions 21.3 Personnel Hoisting Under OSHA 1926.1431
2.1 Load Identity, Dimensions and Units
Key Takeaways Explain This Topic AI
Include projecting parts and retained components in the load envelope.
Use actual pick-point spacing rather than overall length for support reactions.
Convert inches to feet before using a density in pounds per cubic foot.
Last updated: October 2026
Establish what will actually move
Load identification means matching the physical object to the information used to plan its movement. A drawing for a bare pump does not describe the same load as that pump mounted on a skid with a motor, piping and retained liquid. Before calculating capacity, establish the load’s boundaries: which components will travel together, which will be removed, and which temporary attachments remain installed.
Begin with a manufacturer drawing, shipping record, equipment identifier or other reliable record. Compare its model, revision and configuration with the object. A familiar-looking assembly can differ from a previous lift because a motor was replaced, a jacket was added, or transport bracing remains attached. Treat discrepancies as information to resolve, rather than assuming a convenient record must be correct.
A load envelope is the space occupied by the object and its projecting parts. Measure length, width and height, but also identify branches, brackets, instrument tubing and lifting hardware. A vessel’s body may pass through a doorway while its nozzle cannot. For a tilted move, the apparent width or height changes; the envelope is a function of orientation, not just the dimensions on the packing slip.
Use one measurement system at a time
Rigging calculations become unreliable when measurements are entered in incompatible units. Convert dimensions before calculating volume or moments, and identify whether a capacity uses pounds, kilograms, short tons or metric tonnes. A U.S. short ton is 2,000 lb. A metric tonne is 1,000 kg, approximately 2,205 lb. The two are not interchangeable merely because both capacity labels use the word “ton.”
- Quantity Example unit Meaning in a rigging calculation
- Length ft or m Span, height, clearance or sling geometry
- Area square feet Bearing or projected area
- Volume cubic feet Material volume for a weight estimate
- Weight lb or kg as specified Load inventory and component demand
- Moment lb-ft Weight multiplied by its datum distance
A steel plate measuring 96 by 48 by 1 inch is 8 by 4 by 1/12 ft. Its volume is therefore 8 × 4 × 1/12 = 2.6667 cubic feet. Multiplying 96 × 48 × 1 by a density stated in pounds per cubic foot would overstate the weight by a factor of 1,728, the number of cubic inches in a cubic foot. The mistake is dimensional, not a calculator malfunction.
Measure the attachment geometry
Distinguish overall dimensions from the dimensions needed to calculate forces. A skid may be 20 ft long, with pick points only 16 ft apart. Its center of gravity must be located relative to those actual picks when calculating reactions. Using the overall length as the support span changes the denominator and produces incorrect load shares.
Sling length is measured along the load-carrying leg between the effective bearing points. Vertical hook height is measured perpendicular to the pick-point plane. An eyebolt’s mounting surface, a shackle’s pin center and a hook saddle are different reference locations. Decide which geometry model the question uses and apply its dimensions consistently.
Measurement scenario
A cabinet has a 5-ft body width and two brackets that project 4 inches on each side. The occupied width is 5 ft 8 inches, or approximately 5.667 ft. A 5-ft 6-inch opening cannot admit it in that orientation, even though the catalog describes a “5-ft cabinet.” Removing the brackets may be an option only if their function and the revised handling method are confirmed. Forcing a suspended load through the opening is not a measurement correction.
For a rectangular load turned about a vertical axis, its projected width involves both original length and width. A long narrow piece may require more aisle space partway through a turn than at the start or finish. A route survey should therefore include the maneuver’s swept envelope. Model or measure the controlling orientation rather than checking only the end positions.
Verify composition before treating a shape as uniform
Uniform dimensions do not establish uniform mass. A closed housing may contain a heavy rotor at one end; a tank may retain liquid; a concrete component may contain embedded steel. Those internal features affect weight and center of gravity even if the external outline is symmetrical. Use component information and actual condition to identify the appropriate model.
Document uncertainty explicitly. If the label is unreadable, an identifier does not match, or a hidden component has unknown contents, the plan needs additional evidence. The rigger can identify the missing information and request manufacturer data, controlled weighing or other reliable determination. Guessing based on the largest available crane does not establish that the attachment points or destination supports are adequate.
A useful final inventory records identity, configuration, overall envelope, pick-point coordinates and the units for each. Keep photographs or sketches tied to the same identifier so the team knows which object the plan describes. When the load changes, update the inventory before reusing its calculations. This closes the gap between an accurate drawing calculation and a different object on the floor.
Source: CCO Level II examination outline .