Study guide

21.1 Apply the Correct Standard and Regulatory Scope

NCCCO Rigger Level II Exam

Track your progress as you read

Finished sections get a check mark.

1 Certification and Exam Preparation

1.1 Current Exam, Eligibility and Scheduling 1.2 Practical Tasks and Examination-Specific Rules 1.3 Study Method, References and Recertification

2 Identify and Measure the Load

2.1 Load Identity, Dimensions and Units 2.2 Load Weight, Density and Complete Inventories 2.3 Composition, Structural Integrity and Special Handling

3 Center of Gravity and Support Geometry

3.1 Center of Gravity and Suspended Stability 3.2 Attachment Points and Complete Force Paths 3.3 Final Position, Landing Supports and Derigging Access

4 Route and Site Hazards

4.1 Travel Path, Clearance and Work-Zone Control 4.2 Power Lines, Clearance Options and Electrical Response 4.3 Weather, Temperature and Ground Conditions

5 Team Duties and Communications

5.1 Signalperson Duties and Reliable Signals 5.2 Equipment Operator Duties and Capacity Decisions 5.3 Lift Director, Qualified Rigger and Hazard Communication

6 Equipment Requirements and Lift Planning

6.1 Determine Equipment Requirements and Compatibility 6.2 Written Plans, Sequence and Change Control 6.3 Critical-Lift Criteria, Risk and Contingencies

7 Balanced Sling Forces

7.1 Two-Leg Tension and Angle Reference 7.2 Length-to-Height Geometry and Headroom 7.3 Horizontal Forces and Attachment Demand

8 Composite and Unequal Loads

8.1 Composite Center of Gravity by Moments 8.2 Off-Center Reactions and Compatible Sling Geometry 8.3 Three- and Four-Leg Assemblies and Load Sharing

9 Wire Rope, Chain and Metal Mesh Slings

9.1 Select and Use Wire-Rope Slings 9.2 Alloy-Chain Assemblies and Approved Adjustment 9.3 Metal-Mesh Slings: Selection, Contact and Removal

10 Synthetic Rope, Web and Roundslings

10.1 Synthetic-Rope Slings and Approved Splices 10.2 Synthetic-Web Slings and Material Compatibility 10.3 Roundslings, Core Protection and Performance Fibers

11 Hitch Application and Sling Protection

11.1 Vertical and Basket Hitch Capacity 11.2 Choker Hitches, Choke Angle and Bundles 11.3 Softeners, Bend Protection and Cut Protection

12 Shackles, Hooks and Collector Hardware

12.1 Shackle Types, Pin Seating and Side Loading 12.2 Hooks, Latches and Permitted Load Seating 12.3 Master Links, Rings and Swivels

13 Threaded Points and Adjustable Hardware

13.1 Eyebolts, Shoulder Seating and Angular Demand 13.2 Swivel Hoist Rings and Installation Torque 13.3 Turnbuckles and Chain Hardware in Adjustable Systems

14 Compression Hardware and Rigging Blocks

14.1 Wire-Rope Clips and Permitted Terminations 14.2 Wedge Sockets, Rope Alignment and Tail Security 14.3 Rigging Blocks, Resultants and Reeving

15 Manual, Lever and Powered Hoists

15.1 Manual Chain Falls and Vertical Hoisting 15.2 Lever Hoists, Pulling Direction and Controlled Adjustment 15.3 Air and Electric Hoists: Supply, Duty and Controls

16 Jacks, Rollers and Portable Supports

16.1 Jacks, Toe Ratings and Positive Support 16.2 Dollies, Skates, Rollers and Horizontal Control 16.3 A-Frames, Gantries and Trolley Compatibility

17 Structural Lifters and Clamps

17.1 Lifting Beams, Spreaders and Configuration Ratings 17.2 Plate Clamps, Material Limits and Grip Conditions 17.3 Beam Clamps as Attachments and Beam/Girder Lifters

18 Mechanical, Vacuum and Magnetic Devices

18.1 Mechanical and Vacuum Lifting Devices 18.2 Close-Proximity and Remotely Operated Lifting Magnets 18.3 Scrap and Material-Handling Grapples

19 Inspection, Removal and Records

19.1 Inspecting All Six Sling Families 19.2 Hook and Rigging-Hardware Inspection 19.3 Below-the-Hook Device Inspection and Testing

20 Lift Control, Rotation and Completion

20.1 Take-Up, Trial Lift and Load Control 20.2 Controlled Rotation, Upending and Multiple-Crane Lifts 20.3 Secure the Load, Remove Rigging and Stow Equipment

21 Technical Standards and Crane Capacity

21.1 Apply the Correct Standard and Regulatory Scope 21.2 Crane Charts, Suspended Weight and Capacity Deductions 21.3 Personnel Hoisting Under OSHA 1926.1431

21.1 Apply the Correct Standard and Regulatory Scope

Key Takeaways Explain This Topic AI

The listed CCO study-reference edition is distinct from the governing workplace edition.

B30.9, B30.10, B30.20 and B30.26 address different components in one load path.

1926.1432 governs multiple-crane planning; 1926.1404 addresses assembly/disassembly duties.

Last updated: October 2026

Start with the activity and equipment

The Level II Technical Knowledge domain names five ASME volumes and three OSHA regulations. A question may ask which source applies, but useful preparation also requires applying the source's operating provisions to a real lift. Identifying a standard number without checking the component, activity and jurisdiction is insufficient.

OSHA regulations impose legal duties within their applicable employment and activity scopes. ASME standards provide consensus requirements for equipment and operations; they can become binding through adoption, contracts or other applicable requirements. Manufacturer instructions provide product-specific ratings, geometry and operating limits. An employer's lift plan can impose additional limits, but cannot authorize violation of applicable legal requirements or manufacturer restrictions.

Do not simplify this into “the newest document always overrides everything.” Determine the applicable regulation, adopted standard edition, employer requirement and product instructions. A future edition's publication does not automatically change an exam's stated study references or an adopted workplace requirement.

The named ASME volumes

  • Volume Principal Level II application
  • B30.5 Mobile and locomotive crane operations and assigned responsibilities
  • B30.9 Sling selection, hitch/configuration rating and use
  • B30.10 Hook selection, engagement, use and condition
  • B30.20 Below-the-hook device selection, operation and inspection
  • B30.26 Rigging hardware selection, installation, use and inspection

The current CCO study-material page identifies B30.9-2021 and B30.26-2015. Its Rigger Reference Manual contains excerpts identified as B30.5-2018, B30.10-2014 and B30.20-2018. These are exam-source editions, not claims that every workplace uses those editions today. Study the listed references and verify the actual governing requirements before applying them in the field.

B30.5's role provisions distinguish the site supervisor's worksite coordination from the lift director's direct oversight. The rigger obtains load weight and approximate CG, selects and configures sufficient rigging, protects it and attaches the load correctly. The operator controls crane functions and verifies crane capacity. One person can have several assigned roles only when appropriately qualified; a role's duties do not disappear because the crew is small.

B30.9 connects rated sling capacity to material, number of legs, hitch and angle. B30.10 requires loading in the hook bowl and avoiding tip, side or back loading. B30.26 addresses hardware-specific conditions such as correct pins, adjusted thread engagement and approved terminations. B30.20 adds the retaining mechanism and load conditions of a device, including vacuum, magnetic and mechanical applications. Use the relevant lessons in this guide to apply those provisions rather than memorize a single system WLL.

OSHA 1910.184 and 1926.251

1910.184 addresses slings in employments covered by Part 1910. Its named sling families include chain, wire rope, metal mesh, conventional natural/synthetic fiber rope and synthetic web. It contains safe-use practices, identification, inspection and material-specific conditions. Do not treat its detailed provisions as identical text for every later sling construction; roundslings require their applicable manufacturer and ASME provisions.

1926.251 addresses rigging equipment for material handling in construction. It requires legible applicable identification, ratings, inspection before each shift and as necessary, and removal of defective equipment. Its custom-accessory proof-test provision has a particular scope. It also contains material-specific sling and rope provisions, including restrictions on knots and clips forming sling/bridle eyes.

Both sources require protecting slings from sharp edges, avoiding shock loading and keeping within ratings. Neither permits shortening a sling with a knot or makeshift bolt. A load balanced in a basket must remain retained against slippage. Pulling a sling from under a load resting on it is prohibited, rather than a convenient way to finish derigging.

A construction-site question that quotes 1926.251 must be answered using that provision's actual wording. A general-industry wire-sling removal question quoting 1910.184 uses its rope-lay criterion. Do not substitute a familiar number from another source because the materials sound similar.

OSHA 1926.1431 and related crane provisions

1926.1431 supplements other Subpart CC requirements when employees are hoisted. It sets conditions for use, equipment, platforms, connections, trials, proof tests and work practices. It does not create a blanket authorization to lift personnel whenever a crane has spare capacity. Study its permission gate and exceptions separately from the capacity calculations.

Other crane provisions matter to the lift plan: 1926.1402 addresses ground, 1408–1410 power lines, 1419–1420 signals, 1425 the fall zone and 1432 multiple-crane operations. A question about multiple-crane planning is not answered by citing the assembly/disassembly director provision in 1404 as if it controlled all lift-director duties.

Source-application scenario

A crew proposes a four-leg web assembly attached to a hook, carried through a lifting beam. The sling assembly needs its B30.9/manufacturer rating for the actual geometry. The hook must accept the eyes in its bowl under B30.10. The connecting hardware needs its B30.26 installation and directional limits. The beam needs its B30.20 approved arrangement. The crane requires the actual chart and operating conditions, and the workplace OSHA rules apply throughout. Passing one layer does not approve the others.

Resolve conflicts before work

Record the source, edition or effective date, component and precise requirement. Ask the responsible qualified person or manufacturer to resolve a genuine incompatibility. Do not quietly choose a more permissive table or treat an unsupported training shortcut as law. Exam preparation should build this source discipline because unfamiliar lifts require checking conditions rather than guessing from equipment appearance.

Sources: CCO study references , CCO reference manual , OSHA 1910.184 , OSHA 1926.251 , OSHA 1926.1431 .