Level I Standards: ASME and OSHA

NCCCO Rigger Level I Study Guide Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Introduction and Exam Overview

About the CCO Rigger Level I Certification Official Level I Blueprint and Study Strategy

2 Chapter 2: Scope of the Rigging Activity

Load Path, Site Hazards, and Hazard Communication Verifying Load Characteristics and Attachment Points Special Handling and Unsafe Rigging Practices

3 Chapter 3: Technical Knowledge

Level I Standards: ASME and OSHA Hardware Ratings, Identification, and Compatibility Hoisting Personnel Under OSHA 1926.1431

4 Chapter 4: Rigging and Sling Inspection

Synthetic Web, Roundsling, and Fiber-Rope Inspection Wire-Rope Sling Inspection and Removal Alloy-Chain and Metal-Mesh Sling Inspection

5 Chapter 5: Rigging Hardware and Hook Inspection

Frequent Inspection of Rigging Hardware Hooks and Below-the-Hook Device Inspection

6 Chapter 6: Hitches, Sling Angles, and Sling Protection

Hitch Configurations and Tagged Capacities Sling-Angle Recognition and Capacity Tables Sling Protection and Bend Compatibility

7 Chapter 7: Rigging Connections, Knots, and Load Handling

Rigging Connections and Hardware Application The Five Practical Knots and Safe Tag-Line Use Landing, Securing, Disconnecting, and Stowing

8 Chapter 8: Practical Exam, Written Exam Strategy, and Final Review

Level I Practical Examination: Four Published Tasks Written Exam Final Review and Scenarios

Level I Standards: ASME and OSHA

Key Takeaways Explain This Topic AI

CCO's Level I outline names ASME B30.9, B30.10, B30.20, and B30.26 plus OSHA 1910.184, 1926.251, and 1926.1431.

OSHA regulations are enforceable requirements; ASME standards and manufacturer instructions provide component-specific selection, use, and inspection rules.

The CCO handbook identifies ASME B30.5 reference material as Level II only, so it is not a Level I written-outline standard.

Frequent inspection is a distinct blueprint duty from understanding and applying non-inspection use provisions.

OSHA 1926.251 requires custom lifting accessories to be marked with safe working load and proof-tested to 125% before use; it does not itself say every accessory must be designed by an engineer.

Last updated: August 2026

  • Level I Standards: ASME and OSHA
  • The official reference boundary

The current CCO Rigger Level I outline names four ASME volumes and three OSHA sections:

  • Source Level I focus
  • ASME B30.9 slings
  • ASME B30.10 hooks
  • ASME B30.20 below-the-hook lifting devices
  • ASME B30.26 detachable rigging hardware
  • OSHA 1910.184 slings in general industry
  • OSHA 1926.251 rigging equipment in construction
  • OSHA 1926.1431 hoisting personnel with covered construction equipment

The handbook's reference-material list identifies ASME B30.5, Mobile and Locomotive Cranes, for Rigger Level II only. A Level I rigger still follows site controls involving the crane, signal system, and fall zone, but B30.5 should not be taught as one of the Level I written-outline volumes.

CCO says the most current versions of its listed reference materials are used to prepare exams. Edition dates change, so use current CCO materials and current regulatory text rather than attaching a remembered edition year to every rule.

How the sources fit together

OSHA regulations are legal minimum requirements for covered employers and workplaces. General industry and construction can point to different sections. ASME B30 volumes are consensus standards that provide more detailed design, marking, inspection, and operating practices. Manufacturer instructions are essential because ratings, allowed loading directions, thread engagement, temperature limits, and inspection dimensions vary by product.

A correct field decision satisfies every controlling source. A tag or manual cannot authorize less protection than an applicable OSHA rule, and a broad OSHA minimum does not cancel a more restrictive manufacturer instruction. Employer lift procedures and engineered plans may be more restrictive as well.

Do not convert design factors, proof-test factors, or breaking strengths into a new working load limit. The marked rated load or rated-capacity table is the working limit for the stated configuration.

Use rules versus inspection rules

The blueprint asks candidates both to understand non-inspection regulations and to conduct frequent inspection. Keep the decisions separate:

A use question asks whether the selected component, hitch, fit, direction, environment, and load are permitted.

An inspection question asks whether identification, wear, damage, deformation, or function requires removal from service.

A periodic inspection can require records or a more detailed examination than the pre-use or frequent check.

For example, an intact sling can still be misused across an unprotected sharp edge. Conversely, a correctly planned vertical hitch is unsafe if the sling tag is missing or the body is cut.

OSHA 1910.184

This general-industry section covers sling identification, rated capacities, attachments, inspections, and material-specific requirements. It includes exact removal criteria for alloy-chain, wire-rope, metal-mesh, fiber-rope, and synthetic-web slings. Some provisions are specific: synthetic web made from nylon or polyester has a 180°F upper use limit in this rule, while polypropylene web has a 200°F limit. Those values do not become universal limits for every synthetic product governed by another instruction.

OSHA 1910.184 also prohibits shock loading and requires employers to avoid exceeding the rated capacity for the hitch and angle shown on the sling identification or table.

OSHA 1926.251

This construction section requires rigging equipment to be inspected before use on each shift and as necessary during use. Defective equipment must be removed from service. Rigging equipment must not be loaded above the recommended safe working load shown by permanent, legible identification.

Special custom-designed lifting accessories such as spreader bars, links, and lifting beams must be marked to show safe working load and proof-tested before use to 125% of rated load. The cited OSHA paragraph does not add a universal “designed by a qualified engineer” sentence; design responsibilities may arise from other standards, the employer, or the device's circumstances, but they should not be falsely attributed to that paragraph.

The section also requires slings to be protected from sharp edges and prohibits shock loading. Its wire-rope clip table and sling-eye restrictions must be applied exactly, not blended with an unrelated manufacturer's table.

OSHA 1926.1431

This is a special, restrictive rule for personnel hoisting. It begins with a feasibility condition: conventional access must be more hazardous or impossible because of the project's structural design or worksite conditions. It then governs equipment setup, capacity, platform design, rigging, trial lifts, proof tests, inspections, meetings, and work practices. A personnel lift is not merely a “critical lift” with a company percentage; it is a distinct regulatory operation.

ASME component volumes

B30.9 organizes sling construction, identification, selection, use, inspection, and removal. B30.10 covers hooks and their attachments. B30.20 covers structural, mechanical, vacuum, and magnetic below-the-hook devices. B30.26 covers hardware such as shackles, links, rings, swivels, eyebolts, hoist rings, turnbuckles, clips, and wedge sockets.

Exam questions may state a specific removal limit from the applicable current source. Do not extend it to unrelated hardware. When an exact product limit is absent, the safe answer is to use its markings and manufacturer criteria or remove it from service pending evaluation—not to apply a universal 10% rule.

Roles and responsibility

A “qualified rigger” under OSHA is qualified for the rigging work being performed; holding one certification is evidence, not automatic qualification for every task. During crane assembly or disassembly, rigging work is done by a qualified rigger, but that does not make the assembly/disassembly director and rigger the same mandatory person. Read role language precisely.

The Level I habit is traceability: identify which standard covers the item, distinguish selection from inspection, find the exact marked or published limit, and stop when the controlling fact is missing.