Study guide
1.1 The NCCER Boilermaker Assessments: Format, Content Domains, Scoring & Credentials
NCCER Boilermaker Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: The Assessment, Boilermaker Craft, Safety, Tools & Crew Leadership
1.1 The NCCER Boilermaker Assessments: Format, Content Domains, Scoring & Credentials 1.2 Craft Fundamentals, Professional Roles & Industrial Safety 1.3 Confined Space Entry, Lockout/Tagout (LOTO) & Atmospheric Testing 1.4 Hand, Pneumatic, Electric & Hydraulic Boilermaker Tools 1.5 Crew Leadership, Job Planning, Production Tracking & Jobsite Communication
2 Chapter 2: Metallurgy, Base Materials, Oxyfuel, Air Carbon Arc & Plasma Cutting
2.1 Industrial Boiler Materials, Carbon & Alloy Steels, ASME Material Specs & Markings 2.2 Base Metal Surface Preparation, Joint Beveling & Fit-Up Cleanliness 2.3 Oxyfuel Cutting Principles, Equipment Setup, Torch Angles & Piercing Techniques 2.4 Air Carbon Arc Cutting and Gouging (CAC-A): Electrodes, Current, Air Supply, Technique & Defects 2.5 Plasma Arc Cutting (PAC): Torch Anatomy, Consumables, Gas Selection, Cut Quality & Safety
3 Chapter 3: Boiler Types, Steam Generation, Feedwater & Combustion Systems
3.1 Firetube Boiler Designs, Circulation Patterns & Operating Principles 3.2 Watertube Boiler Configurations, Natural & Forced Circulation, Drum Internals 3.3 Superheaters, Reheaters, Economizers & Air Heaters 3.4 Feedwater Systems, Deaerators, Condensate Return & Boiler Water Treatment 3.5 Combustion Systems: Burners, Stokers, Pulverizers, Fans & Draft Control
4 Chapter 4: Boiler Pressure & Nonpressure Components
4.1 Steam Drums, Mud Drums, Headers & Waterwalls 4.2 Nonpressure Components: Casing, Breeching, Baffles, Buckstays & Expansion Joints 4.3 Boiler Auxiliaries: Soot Blowers, Safety Valves, Gage Glasses & Blowdown Systems
5 Chapter 5: Valves, Gaskets, Fasteners, Anchors & Pipe Support Systems
5.1 Industrial Valve Types, Markings, Operation & Ratings 5.2 Gasket Materials, Flange Facings, Bolt Torque Sequences & Joint Assembly 5.3 Gasket Layout, Cutting & Fitting for Field-Made Gaskets 5.4 Fasteners, Anchors & Threaded Connection Hardware 5.5 Pipe Hangers, Supports, Rigid Restraints & Spring Can Installation/Adjustment
6 Chapter 6: Blueprint Reading, Welding Symbols & Construction Drawings
6.1 AWS Welding Symbols, Joint Geometry, Contours & NDE Designators 6.2 Piping Schematics, P&IDs, Isometric Drawings & Spool Sheets 6.3 Pressure Vessel General Arrangement, Detail Sheets, Coordinates & Elevations
7 Chapter 7: Trade Mathematics & Pipe Layout Calculations
7.1 Boilermaker Mechanical Trade Math: Offsets, Rolling Offsets & Travel Calculations 7.2 Vessel Volume, Surface Area, Circumference & Head Layout Computations 7.3 Mitered Turns, Segment Layout, Cutbacks & Branch Connections
8 Chapter 8: Pipe Fabrication - Socket Weld, Butt Weld, Threaded, Grooved & Spool Work
8.1 Pipe Materials, Nominal Pipe Size, Wall Schedules & Fitting Standards 8.2 Socket Weld Pipe Fabrication: The 1/16 in. Gap, Fillet Sizing & Cut Lengths 8.3 Butt Weld Pipe Fabrication: End Preparation, Alignment, Fit-Up & Cut Lengths 8.4 Pipe Layout Tools, Wrap-Arounds, Flange Squaring & Fabrication Tolerances 8.5 Threaded and Grooved Pipe Joining Systems 8.6 Spool Fabrication Workflow, Shop Versus Field Welds & Advanced Pipe Fabrication
9 Chapter 9: Tube Fabrication, Bending & Rolling
9.1 Boiler Tube Removal, Inspection, Wall Thinning & Replacement Criteria 9.2 Tube Preparation, Bending Radii, Ovality & Alignment Tolerances 9.3 Tube Expanding Mechanics, Rolling Torque Calculations, Wall Reduction & Flaring/Beading
10 Chapter 10: Welding Processes, Preheat & Stress Relieving
10.1 SMAW, GTAW & FCAW Welding Processes in Pressure Vessel Applications 10.2 Electrode Selection, Storage, Baking & AWS Filler Metal Classifications 10.3 Preheating Standards, Interpass Temperature Control & Post-Weld Heat Treatment (PWHT)
11 Chapter 11: Rigging Equipment, Hardware & Crane Operations
11.1 Rigging Hardware: Slings, Shackles, Eye Bolts & Inspection Criteria 11.2 Rigging Math: Sling Angles, Tension Calculations & Center of Gravity 11.3 Crane Signals, Load Charts, Boom Angle Deratings & Critical Lift Planning
12 Chapter 12: Towers, Heat Exchangers & Refractory/BRIL Systems
12.1 Shell-and-Tube Heat Exchangers: Bundles, Baffles & Floating Heads 12.2 Fractionation Towers, Trays, Downcomers, Packing & Vessel Hardware 12.3 Refractory Materials (Brick, Castable, Ceramic Fiber), Anchoring & Lagging (BRIL)
13 Chapter 13: ASME Codes, Quality Assurance, NDE, Pressure Testing & System Cleaning
13.1 ASME Boiler & Pressure Vessel Code (Sections I, VIII, IX) & NBIC Standards 13.2 Quality Control, Material Test Reports (MTRs), Weld Mapping & Traceability 13.3 Nondestructive Examination (NDE): VT, PT, MT, UT, RT & Discontinuity Evaluation 13.4 Hydrostatic and Pneumatic Testing Procedures, Safety Precautions & MAWP Validation 13.5 System Flushing, Chemical Cleaning, Boil-Out, Steam Blows & Service Leak Testing
1.1 The NCCER Boilermaker Assessments: Format, Content Domains, Scoring & Credentials
Key Takeaways Explain This Topic AI
The Boilermaker – Pressure Vessel assessment (BLMK34_02) is a 93-item, two-hour, closed-book examination with a minimum passing score of 75.
Boiler Components (19 items) and Pipe Fabrication (15 items) together make up 34 of the 93 items — over one third of the entire assessment.
The Pipefitters Blue Book by W. V. Graves is the only approved reference, and only a basic-function, non-printing calculator is permitted.
Industrial Boilermaker – Exchanger (25 items) is an add-on: the credential requires passing both the Maintenance and the Exchanger assessments.
Every item is referenced to a numbered module of NCCER's 2nd edition Boilermaking curriculum — 700 recommended hours across four levels.
Last updated: August 2026
The NCCER Boilermaker Assessments: Format, Content Domains, Scoring & Credentials
Core Trade Concept: NCCER does not administer one generic "boilermaker test." It runs the National Craft Assessment and Certification Program (NCACP) , which pairs a written knowledge assessment with an optional hands-on Performance Verification . Every question on every boilermaker knowledge assessment is written back to a specific numbered module of NCCER's 2nd edition Boilermaking curriculum . If you know which modules feed which content domain, you know exactly what the test can ask.
1. The Three Boilermaker Knowledge Assessments
NCCER publishes a separate specification sheet for each boilermaker credential. All three were updated November 2024 and all three reference the 2nd edition Boilermaking curriculum.
- Assessment Code Items Time Minimum score
- Boilermaker – Pressure Vessel BLMK34_02 93 2 hours 75
- Industrial Boilermaker – Maintenance RBLMK34_04 71 2 hours 75
- Industrial Boilermaker – Exchanger RBLMKE34_01 25 2 hours 75
Three rules follow directly from that table and are commonly missed:
The passing standard is a score of 75, not 70. Candidates who plan around a 70% cut score are planning around the wrong number.
The Exchanger credential is not standalone. NCCER states that to receive a credential in Industrial Boilermaker – Exchanger, a candidate must complete and pass BOTH the Industrial Boilermaker – Maintenance assessment and the Industrial Boilermaker – Exchanger assessment. The 25-item Exchanger test is an add-on, not a full craft exam.
A Journey Level Assessment is also offered for the craft , separate from the three specialty assessments above.
Unless a contractor or owner specifies otherwise, Boilermaker – Pressure Vessel (BLMK34_02) is the default journey-level boilermaker credential and is the blueprint this study guide is built to.
2. Boilermaker – Pressure Vessel: The Full Content Domain Table
NCCER publishes the exact item count per content domain. This is the single most valuable page in your prep, because it tells you where the questions actually live.
- Content domain Referenced modules Items Share
- Boiler Components 34201, 34301, 34302, 34306 19 20.4%
- Pipe Fabrication 08402, 34207, 34208, 34301, 34308 15 16.1%
- Welding Basics 34107, 34108, 34206, 34407 11 11.8%
- Boilermaker Fundamentals 34102, 34103, 34104 10 10.8%
- Cutting Basics 29103, 34105, 34106, 34210 10 10.8%
- Pipe Support 34201, 34202, 34203, 34205 8 8.6%
- Construction Drawings 34204, 34402 6 6.5%
- Rigging 15206, 34410 5 5.4%
- Tube Work 34303 5 5.4%
- Math 34401 4 4.3%
- Total 93 100%
- What the weighting actually means for your study time
Boiler Components plus Pipe Fabrication is 34 of 93 items — over a third of the test. A candidate who is strong on boilers but has never fabricated a socket weld or butt weld spool is leaving the largest single block of points on the table.
Math is only 4 items , but those 4 items are pure arithmetic and trigonometry you either can or cannot do under time pressure. They are the cheapest points on the exam.
Rigging is 5 items and Tube Work is 5 items. Both are heavily emphasized in boilermaker folklore and both are small on the actual specification. Do not over-rotate.
- 3. Test-Day Rules +---------------------------------------------------------------------------+
- | BOILERMAKER - PRESSURE VESSEL (BLMK34_02) LOGISTICS |
- +---------------------------------------------------------------------------+
- | Duration | Two hours |
- | Format | Closed book |
- | Items | 93 |
- | Pace | 120 min / 93 items = 77 seconds per item |
- | Calculator | Basic function, NON-PRINTING only |
- | Approved reference| The Pipefitters Blue Book by W. V. Graves |
- | Prohibited | Extra paper, books, notes, any other study material |
- | Item development | Written and approved by subject matter experts (NCCER) |
- +---------------------------------------------------------------------------+
Two of these deserve emphasis:
The Pipefitters Blue Book is the only approved reference , and it is approved on the Pressure Vessel assessment specifically. The Blue Book carries fitting takeouts, offset constants, and pipe dimensional data. A candidate who has never opened it before test day will burn far more than 77 seconds trying to find a takeout table. Practice with it.
"Basic function, non-printing" rules out programmable and graphing calculators. Practice your offset and wall-reduction arithmetic on the calculator you will actually be handed.
4. The Curriculum Behind the Questions
NCCER's Boilermaking curriculum is 2nd edition, 700 recommended hours including Core , organized in four levels. Every assessment item traces back to one of these modules.
Level Modules Representative titles
1 34101–34108 Introduction to Boilermaking; Boilermaking Safety; Boilermaking Tools; Basic Materials; Oxyfuel Cutting; Cutting and Fitting Gaskets; Base Metal Preparation; Welding Basics
2 34201–34210 Boiler Systems and Components; Identifying and Installing Valves; Pipe Hangers and Supports; Drawings and Detail Sheets; Fasteners and Anchors; Welding Symbols; Socket Weld Pipe Fabrication; Butt Weld Pipe Fabrication; Tube Weld Preparation and Fitting; Air Carbon Arc Cutting and Gouging
3 34301–34308, 29103, 15206 Boiler Pressure Components; Boiler Nonpressure Components; Advanced Tube Work; Brick, Refractory, Insulation and Lagging; Boiler Auxiliaries; Towers and Exchangers; Testing Piping Systems and Equipment; Plasma Arc Cutting; Rigging
4 34401–34412, 08402, 46101 Advanced Mechanical Trade Math; Advanced Boilermaking Construction Drawings; Stress Relieving; Quality Assurance; Advanced Rigging; Advanced Exchangers; Advanced Towers; Advanced Pipe Fabrication; Fundamentals of Crew Leadership
Notice that the Pressure Vessel domain table pulls modules from all four levels , including Level 4 modules such as 34401 (Math), 34402 (Construction Drawings), 34407 (Quality Assurance) and 34410 (Advanced Rigging). Passing is not a matter of finishing Level 1 and Level 2.
5. Performance Verification, Credentials & the Score Report
Performance Verification. A corresponding hands-on Performance Verification exists for each of the three boilermaker assessments. It is evaluated by a qualified evaluator against NCCER performance criteria and is a separate event from the written test . Some employers require both.
Credentialing. On successful completion of either the knowledge assessment or the performance verification, the credential can be viewed and printed by the individual, or by the assessment program, through the NCCER Account (the national registry). This portability — the ability of any employer to verify your credential nationally — is the practical value of the card.
Score report and training prescription. Every candidate receives online access to their overall score and a recommended-training prescription through their NCCER Account. If you fail, the prescription names the specific modules to re-study; it is the most efficient retake plan available to you.
6. Realistic Trade Scenario: Building a Two-Week Study Plan From the Specification
A boilermaker with eight years of maintenance experience is scheduled for BLMK34_02 in fourteen days. She has strong boiler and rigging experience but has spent little time in a fab shop.
Working from the specification table, she allocates study hours in proportion to item counts, then adjusts for personal weakness:
- Domain Items Proportional hours (of 40) Adjusted
- Boiler Components 19 8.2 5 (existing strength)
- Pipe Fabrication 15 6.5 12 (known gap)
- Welding Basics 11 4.7 5
- Boilermaker Fundamentals 10 4.3 3
- Cutting Basics 10 4.3 6 (no plasma or CAC-A time)
- Pipe Support 8 3.4 3
- Construction Drawings 6 2.6 3
- Rigging 5 2.2 1 (existing strength)
- Tube Work 5 2.2 1 (existing strength)
- Math 4 1.7 1
She spends the final two sessions doing timed 93-item runs at 77 seconds per item with a basic calculator and the Blue Book open, because pace — not knowledge — is what fails experienced hands on this assessment.