Study guide
7.1 Boilermaker Mechanical Trade Math: Offsets, Rolling Offsets & Travel Calculations
NCCER Boilermaker Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: The Assessment, Boilermaker Craft, Safety, Tools & Crew Leadership
1.1 The NCCER Boilermaker Assessments: Format, Content Domains, Scoring & Credentials 1.2 Craft Fundamentals, Professional Roles & Industrial Safety 1.3 Confined Space Entry, Lockout/Tagout (LOTO) & Atmospheric Testing 1.4 Hand, Pneumatic, Electric & Hydraulic Boilermaker Tools 1.5 Crew Leadership, Job Planning, Production Tracking & Jobsite Communication
2 Chapter 2: Metallurgy, Base Materials, Oxyfuel, Air Carbon Arc & Plasma Cutting
2.1 Industrial Boiler Materials, Carbon & Alloy Steels, ASME Material Specs & Markings 2.2 Base Metal Surface Preparation, Joint Beveling & Fit-Up Cleanliness 2.3 Oxyfuel Cutting Principles, Equipment Setup, Torch Angles & Piercing Techniques 2.4 Air Carbon Arc Cutting and Gouging (CAC-A): Electrodes, Current, Air Supply, Technique & Defects 2.5 Plasma Arc Cutting (PAC): Torch Anatomy, Consumables, Gas Selection, Cut Quality & Safety
3 Chapter 3: Boiler Types, Steam Generation, Feedwater & Combustion Systems
3.1 Firetube Boiler Designs, Circulation Patterns & Operating Principles 3.2 Watertube Boiler Configurations, Natural & Forced Circulation, Drum Internals 3.3 Superheaters, Reheaters, Economizers & Air Heaters 3.4 Feedwater Systems, Deaerators, Condensate Return & Boiler Water Treatment 3.5 Combustion Systems: Burners, Stokers, Pulverizers, Fans & Draft Control
4 Chapter 4: Boiler Pressure & Nonpressure Components
4.1 Steam Drums, Mud Drums, Headers & Waterwalls 4.2 Nonpressure Components: Casing, Breeching, Baffles, Buckstays & Expansion Joints 4.3 Boiler Auxiliaries: Soot Blowers, Safety Valves, Gage Glasses & Blowdown Systems
5 Chapter 5: Valves, Gaskets, Fasteners, Anchors & Pipe Support Systems
5.1 Industrial Valve Types, Markings, Operation & Ratings 5.2 Gasket Materials, Flange Facings, Bolt Torque Sequences & Joint Assembly 5.3 Gasket Layout, Cutting & Fitting for Field-Made Gaskets 5.4 Fasteners, Anchors & Threaded Connection Hardware 5.5 Pipe Hangers, Supports, Rigid Restraints & Spring Can Installation/Adjustment
6 Chapter 6: Blueprint Reading, Welding Symbols & Construction Drawings
6.1 AWS Welding Symbols, Joint Geometry, Contours & NDE Designators 6.2 Piping Schematics, P&IDs, Isometric Drawings & Spool Sheets 6.3 Pressure Vessel General Arrangement, Detail Sheets, Coordinates & Elevations
7 Chapter 7: Trade Mathematics & Pipe Layout Calculations
7.1 Boilermaker Mechanical Trade Math: Offsets, Rolling Offsets & Travel Calculations 7.2 Vessel Volume, Surface Area, Circumference & Head Layout Computations 7.3 Mitered Turns, Segment Layout, Cutbacks & Branch Connections
8 Chapter 8: Pipe Fabrication - Socket Weld, Butt Weld, Threaded, Grooved & Spool Work
8.1 Pipe Materials, Nominal Pipe Size, Wall Schedules & Fitting Standards 8.2 Socket Weld Pipe Fabrication: The 1/16 in. Gap, Fillet Sizing & Cut Lengths 8.3 Butt Weld Pipe Fabrication: End Preparation, Alignment, Fit-Up & Cut Lengths 8.4 Pipe Layout Tools, Wrap-Arounds, Flange Squaring & Fabrication Tolerances 8.5 Threaded and Grooved Pipe Joining Systems 8.6 Spool Fabrication Workflow, Shop Versus Field Welds & Advanced Pipe Fabrication
9 Chapter 9: Tube Fabrication, Bending & Rolling
9.1 Boiler Tube Removal, Inspection, Wall Thinning & Replacement Criteria 9.2 Tube Preparation, Bending Radii, Ovality & Alignment Tolerances 9.3 Tube Expanding Mechanics, Rolling Torque Calculations, Wall Reduction & Flaring/Beading
10 Chapter 10: Welding Processes, Preheat & Stress Relieving
10.1 SMAW, GTAW & FCAW Welding Processes in Pressure Vessel Applications 10.2 Electrode Selection, Storage, Baking & AWS Filler Metal Classifications 10.3 Preheating Standards, Interpass Temperature Control & Post-Weld Heat Treatment (PWHT)
11 Chapter 11: Rigging Equipment, Hardware & Crane Operations
11.1 Rigging Hardware: Slings, Shackles, Eye Bolts & Inspection Criteria 11.2 Rigging Math: Sling Angles, Tension Calculations & Center of Gravity 11.3 Crane Signals, Load Charts, Boom Angle Deratings & Critical Lift Planning
12 Chapter 12: Towers, Heat Exchangers & Refractory/BRIL Systems
12.1 Shell-and-Tube Heat Exchangers: Bundles, Baffles & Floating Heads 12.2 Fractionation Towers, Trays, Downcomers, Packing & Vessel Hardware 12.3 Refractory Materials (Brick, Castable, Ceramic Fiber), Anchoring & Lagging (BRIL)
13 Chapter 13: ASME Codes, Quality Assurance, NDE, Pressure Testing & System Cleaning
13.1 ASME Boiler & Pressure Vessel Code (Sections I, VIII, IX) & NBIC Standards 13.2 Quality Control, Material Test Reports (MTRs), Weld Mapping & Traceability 13.3 Nondestructive Examination (NDE): VT, PT, MT, UT, RT & Discontinuity Evaluation 13.4 Hydrostatic and Pneumatic Testing Procedures, Safety Precautions & MAWP Validation 13.5 System Flushing, Chemical Cleaning, Boil-Out, Steam Blows & Service Leak Testing
7.1 Boilermaker Mechanical Trade Math: Offsets, Rolling Offsets & Travel Calculations
Key Takeaways Explain This Topic AI
Right-triangle trigonometry fundamentals (Pythagorean theorem a² + b² = c², sine, cosine, tangent) and standard constant multipliers (1.414 for 45°, 2.000 for 30°, 1.155 for 60°, 2.613 for 22.5°) allow rapid field calculation of travel, run, and set dimensions without complex scientific calculators.
Rolling (compound) offsets require solving two right triangles in orthogonal planes: first calculating the Plan Travel (or roll-set hypotenuse) using √(Roll² + Set²), then calculating the True Travel using √(Rise² + Roll² + Set²) = Plan Travel × 1.414 for standard 45° rolling offsets.
Fitting takeout deductions must be subtracted from the calculated center-to-center travel to find the actual cut pipe (pup) length: standard Long Radius (LR) 90° elbows have a takeout of 1.5 × NPS, while LR 45° elbows have a takeout of 1.5 × NPS × tan(22.5°) ≈ 0.621 × NPS (or the trade rule-of-thumb 0.625 × NPS = 5/8 × NPS).
Butt-weld root gap allowances (standard 1/8 in. per joint) and weld-neck flange hub lengths must be strictly deducted: Cut Pipe Length = True Travel - (Takeout₁ + Takeout₂) - (Root Gap₁ + Root Gap₂).
Last updated: August 2026
7.1 Boilermaker Mechanical Trade Math: Offsets, Rolling Offsets & Travel Calculations
Core Trade Concept: In heavy industrial boiler construction, piping fabrication, and pressure vessel nozzle routing, piping systems must frequently bypass structural columns, ductwork, headers, and adjacent equipment. Boilermakers must master right-triangle trigonometry, spatial 3D compound rolling offsets, fitting takeout deductions, and weld root gap allowances to calculate exact cut pipe lengths ("pup" lengths) before making cuts in expensive heavy-wall alloy pipe.
1. Right-Triangle Trigonometric Fundamentals for Boilermakers
All piping offsets are based on the geometry of the right-angle triangle ( 90 ∘ 90^\circ 9 0 ∘ triangle). In piping layout terminology:
Set (Rise or Offset): The perpendicular distance between the centerlines of the two parallel pipe runs being connected.
Run (Horizontal Spread): The longitudinal distance along the pipe rack or pipeline over which the offset occurs.
Travel (Hypotenuse): The centerline-to-centerline distance along the angled pipe section connecting the two fittings. STANDARD SIMPLE OFFSET TRIANGLE
- Fitting 2 (Top Centerline)
- +=====================
- /|
- / |
- / |
- / |
- Travel / | Set (Offset)
- (Hypotenuse) | (Opposite)
- / |
- / |
- / $\theta$ |
- ==================+---------+
- Fitting 1 <---Run--->
- (Bottom Centerline) (Adjacent)
- The Pythagorean Theorem
For any right triangle where the angle between the Run and the Set is 90 ∘ 90^\circ 9 0 ∘ : a 2 + b 2 = c 2 ⟹ Travel = Set 2 + Run 2 a^2 + b^2 = c^2 \implies \text{Travel} = \sqrt{\text{Set}^2 + \text{Run}^2} a 2 + b 2 = c 2 ⟹ Travel = Set 2 + Run 2 Set = Travel 2 − Run 2 Run = Travel 2 − Set 2 \text{Set} = \sqrt{\text{Travel}^2 - \text{Run}^2} \qquad \text{Run} = \sqrt{\text{Travel}^2 - \text{Set}^2} Set = Travel 2 − Run 2 Run = Travel 2 − Set 2
Trigonometric Functions & Field Multipliers
Using the fitting angle θ \theta θ (the angle of deviation from the straight pipe run): sin ( θ ) = Set Travel ⟹ Travel = Set sin ( θ ) = Set × csc ( θ ) \sin(\theta) = \frac{\text{Set}}{\text{Travel}} \implies \text{Travel} = \frac{\text{Set}}{\sin(\theta)} = \text{Set} \times \csc(\theta) sin ( θ ) = Travel Set ⟹ Travel = sin ( θ ) Set = Set × csc ( θ ) cos ( θ ) = Run Travel ⟹ Run = Travel × cos ( θ ) \cos(\theta) = \frac{\text{Run}}{\text{Travel}} \implies \text{Run} = \text{Travel} \times \cos(\theta) cos ( θ ) = Travel Run ⟹ Run = Travel × cos ( θ ) tan ( θ ) = Set Run ⟹ Run = Set tan ( θ ) = Set × cot ( θ ) \tan(\theta) = \frac{\text{Set}}{\text{Run}} \implies \text{Run} = \frac{\text{Set}}{\tan(\theta)} = \text{Set} \times \cot(\theta) tan ( θ ) = Run Set ⟹ Run = tan ( θ ) Set = Set × cot ( θ )
2. Standard Simple Offset Multipliers
In field pipefitting and boilermaking, standard forged fittings are manufactured in specific angles: 45 ∘ 45^\circ 4 5 ∘ , 90 ∘ 90^\circ 9 0 ∘ , 60 ∘ 60^\circ 6 0 ∘ , 30 ∘ 30^\circ 3 0 ∘ , 22.5 ∘ 22.5^\circ 22. 5 ∘ , and 11.25 ∘ 11.25^\circ 11.2 5 ∘ . To eliminate the need for trigonometric calculations under field conditions, boilermakers use constant multipliers (derived from the trigonometric functions of each angle). COMPARISON OF STANDARD OFFSET ANGLES
- 22.5° Offset 30° Offset 45° Offset
- +-------------+ +-------------+ +-------------+
- | T = S×2.613 | | T = S×2.000 | | T = S×1.414 |
- | R = S×2.414 | | R = S×1.732 | | R = S×1.000 |
- +-------------+ +-------------+ +-------------+
- Longest Run Moderate Run Equal Set/Run
- Low Flow Restr. Standard Utility Most Common Field
- Trade Constant Multipliers Table
Fitting Angle ( θ \theta θ ) Travel Multiplier ( csc θ \csc \theta csc θ ) Run Multiplier ( cot θ \cot \theta cot θ ) Set Multiplier from Travel ( sin θ \sin \theta sin θ ) Trade Rule / Practical Notes
45.0 ∘ 45.0^\circ 45. 0 ∘ 1.414 1.414 1.414 ( 1.4142 1.4142 1.4142 ) 1.000 1.000 1.000 0.707 0.707 0.707 ( 0.7071 0.7071 0.7071 ) Set equals Run; most widely used offset in boiler piping.
30.0 ∘ 30.0^\circ 30. 0 ∘ 2.000 2.000 2.000 1.732 1.732 1.732 0.500 0.500 0.500 Travel is exactly twice the Set; very fast field calculation.
60.0 ∘ 60.0^\circ 60. 0 ∘ 1.155 1.155 1.155 0.577 0.577 0.577 0.866 0.866 0.866 Compact offset; used where longitudinal run space is severely limited.
22.5 ∘ 22.5^\circ 22. 5 ∘ 2.613 2.613 2.613 2.414 2.414 2.414 0.383 0.383 0.383 Smooth flow transition for high-velocity slurries and steam lines.
11.25 ∘ 11.25^\circ 11.2 5 ∘ 5.126 5.126 5.126 5.027 5.027 5.027 0.195 0.195 0.195 Long gradual sweep; minimizes erosion in pulverized coal piping.
Worked Example: Simple 45 ∘ 45^\circ 4 5 ∘ Offset
A boilermaker must install a 45 ∘ 45^\circ 4 5 ∘ offset in a water supply line to clear a structural building column. The measured centerline-to-centerline offset ( Set ) is 18 inches 18\text{ inches} 18 inches . Travel = Set × 1.414 = 18 in. × 1.4142 = 25.456 in. ≈ 25 – 7 16 in. (center-to-center) \text{Travel} = \text{Set} \times 1.414 = 18\text{ in.} \times 1.4142 = 25.456\text{ in.} \approx 25\text{--}\frac{7}{16}\text{ in. (center-to-center)} Travel = Set × 1.414 = 18 in. × 1.4142 = 25.456 in. ≈ 25 – 16 7 in. (center-to-center) Run = Set × 1.000 = 18 inches \text{Run} = \text{Set} \times 1.000 = 18\text{ inches} Run = Set × 1.000 = 18 inches
Worked Example: Simple 30 ∘ 30^\circ 3 0 ∘ Offset
A condensate return line requires a 30 ∘ 30^\circ 3 0 ∘ offset with a measured Set of 14 inches 14\text{ inches} 14 inches : Travel = Set × 2.000 = 14 in. × 2.000 = 28.000 in. (center-to-center) \text{Travel} = \text{Set} \times 2.000 = 14\text{ in.} \times 2.000 = 28.000\text{ in. (center-to-center)} Travel = Set × 2.000 = 14 in. × 2.000 = 28.000 in. (center-to-center) Run = Set × 1.732 = 14 in. × 1.732 = 24.248 in. ≈ 24 – 1 4 in. \text{Run} = \text{Set} \times 1.732 = 14\text{ in.} \times 1.732 = 24.248\text{ in.} \approx 24\text{--}\frac{1}{4}\text{ in.} Run = Set × 1.732 = 14 in. × 1.732 = 24.248 in. ≈ 24 – 4 1 in.
Worked Example: Simple 60 ∘ 60^\circ 6 0 ∘ Offset
A blowdown header requires a 60 ∘ 60^\circ 6 0 ∘ offset with a measured Set of 20 inches 20\text{ inches} 20 inches : Travel = Set × 1.155 = 20 in. × 1.1547 = 23.094 in. ≈ 23 – 3 32 in. (center-to-center) \text{Travel} = \text{Set} \times 1.155 = 20\text{ in.} \times 1.1547 = 23.094\text{ in.} \approx 23\text{--}\frac{3}{32}\text{ in. (center-to-center)} Travel = Set × 1.155 = 20 in. × 1.1547 = 23.094 in. ≈ 23 – 32 3 in. (center-to-center) Run = Set × 0.577 = 20 in. × 0.5774 = 11.547 in. ≈ 11 – 9 16 in. \text{Run} = \text{Set} \times 0.577 = 20\text{ in.} \times 0.5774 = 11.547\text{ in.} \approx 11\text{--}\frac{9}{16}\text{ in.} Run = Set × 0.577 = 20 in. × 0.5774 = 11.547 in. ≈ 11 – 16 9 in.
3. Rolling (Compound) Offsets: 3D Spatial Vector Analysis
A rolling offset (also known as a compound offset) occurs when a pipe changes elevation (Rise/Set) and horizontal position (Roll) simultaneously. Instead of shifting in a single two-dimensional plane, the pipe travels diagonally through three-dimensional space. 3D ROLLING OFFSET SPATIAL BOX
- +------------------------+ Fitting 2
- /| /|
- / | / |
- / | / |
- +---+--------------------+ |
- | | | |
- | | TRUE | |
- Rise | | TRAVEL | |
- (Set) | +--------------------+---+ (Plan Travel)
- | / Roll (Horizontal) | /
- | / | /
- |/ |/
- Fitting 1 +------------------------+
- Run
- Mathematical Formulation of Rolling Offsets
Solving a rolling offset requires breaking the 3D space into two consecutive right triangles:
Step 1: Calculate the Plan Travel (Roll-Set Triangle / Intermediate Hypotenuse): In the vertical cross-sectional plane perpendicular to the pipe run, the vertical Rise (Set) and horizontal Roll form the legs of a right triangle. The hypotenuse of this cross-section is the Plan Travel (or intermediate offset distance): Plan Travel = Roll 2 + Set 2 \text{Plan Travel} = \sqrt{\text{Roll}^2 + \text{Set}^2} Plan Travel = Roll 2 + Set 2
Step 2: Calculate the True Travel (Longitudinal Diagonal Hypotenuse): The Plan Travel becomes the "effective set" for the longitudinal offset triangle. Using the 3D Pythagorean theorem: True Travel = Rise 2 + Roll 2 + Set 2 = ( Plan Travel ) 2 + Run 2 \text{True Travel} = \sqrt{\text{Rise}^2 + \text{Roll}^2 + \text{Set}^2} = \sqrt{(\text{Plan Travel})^2 + \text{Run}^2} True Travel = Rise 2 + Roll 2 + Set 2 = ( Plan Travel ) 2 + Run 2
Standard 45 ∘ 45^\circ 4 5 ∘ Rolling Offset Rule: When standard 45 ∘ 45^\circ 4 5 ∘ fittings are rolled in their fittings to achieve the compound angle, the True Travel is calculated directly from the Plan Travel using the 45 ∘ 45^\circ 4 5 ∘ multiplier: True Travel = Plan Travel × 1.414 = Roll 2 + Set 2 × 1.414 \text{True Travel} = \text{Plan Travel} \times 1.414 = \sqrt{\text{Roll}^2 + \text{Set}^2} \times 1.414 True Travel = Plan Travel × 1.414 = Roll 2 + Set 2 × 1.414 Run = Plan Travel = Roll 2 + Set 2 \text{Run} = \text{Plan Travel} = \sqrt{\text{Roll}^2 + \text{Set}^2} Run = Plan Travel = Roll 2 + Set 2
Step-by-Step Worked Rolling Offset Example
A high-pressure steam line must route around a structural beam. The piping changes elevation by a vertical Rise (Set) of 12 inches 12\text{ inches} 12 inches and shifts sideways by a horizontal Roll of 16 inches 16\text{ inches} 16 inches . The installation uses two 45 ∘ 45^\circ 4 5 ∘ butt-weld fittings. STEP-BY-STEP ROLLING OFFSET COMPUTATION
1. Cross-Sectional Hypotenuse (Plan Travel):
Plan Travel = √(12² + 16²) = √(144 + 256) = √400 = 20.0 inches
2. True Travel (Center-to-Center Distance):
- True Travel = Plan Travel × 1.414 = 20.0 × 1.4142 = 28.284 inches
- (Fractional Equivalent: 28-5/16 inches)
3. Longitudinal Run:
Run = Plan Travel = 20.0 inches
4. Fitting Takeouts, Weld Root Gap Deductions & Pup Length
The calculated True Travel is the theoretical distance from the centerline intersection of Fitting 1 to the centerline intersection of Fitting 2 . Because forged elbows, flanges, and valves have physical body dimensions, boilermakers must subtract the fitting takeout (center-to-face dimension) and weld root gap allowances from the True Travel to determine the exact cut length of the straight pipe spool (the pup ). FITTING TAKEOUT & PUP LENGTH DEDUCTION
- Centerline 1 Centerline 2
- + <--------- TRUE TRAVEL ---------> +
- | |
- |<--- Takeout 1 --->| |<--- Takeout 2 --->|
- | | Gap 1 Gap 2 | |
- (---) |->| |<- ->| |<- | (---)
- ( 45° )===============+====+===================+====+===============( 45° )
- (Elbow) | | CUT PIPE | | (Elbow)
- | | (PUP LENGTH) | |
- <------------------->
- Fitting Takeout Rules of Thumb
Standard Long Radius (LR) 90 ∘ 90^\circ 9 0 ∘ Butt-Weld Elbow:
Radius = 1.5 × Nominal Pipe Size (NPS) = 1.5 \times \text{Nominal Pipe Size (NPS)} = 1.5 × Nominal Pipe Size (NPS) .
Takeout = 1.5 × NPS = 1.5 \times \text{NPS} = 1.5 × NPS (e.g., 6 in. 6\text{ in.} 6 in. LR 90 ∘ 90^\circ 9 0 ∘ elbow takeout = 1.5 × 6 = 9 inches = 1.5 \times 6 = 9\text{ inches} = 1.5 × 6 = 9 inches ).
Short Radius (SR) 90 ∘ 90^\circ 9 0 ∘ Butt-Weld Elbow:
Radius = 1.0 × NPS = 1.0 \times \text{NPS} = 1.0 × NPS .
Takeout = 1.0 × NPS = 1.0 \times \text{NPS} = 1.0 × NPS (e.g., 6 in. 6\text{ in.} 6 in. SR 90 ∘ 90^\circ 9 0 ∘ elbow takeout = 1.0 × 6 = 6 inches = 1.0 \times 6 = 6\text{ inches} = 1.0 × 6 = 6 inches ).
Standard Long Radius (LR) 45 ∘ 45^\circ 4 5 ∘ Butt-Weld Elbow:
Takeout formula based on trigonometry: Takeout = 1.5 × NPS × tan ( 22.5 ∘ ) = 1.5 × NPS × 0.41421 = 0.6213 × NPS \text{Takeout} = 1.5 \times \text{NPS} \times \tan(22.5^\circ) = 1.5 \times \text{NPS} \times 0.41421 = 0.6213 \times \text{NPS} Takeout = 1.5 × NPS × tan ( 22. 5 ∘ ) = 1.5 × NPS × 0.41421 = 0.6213 × NPS .
Trade Rule-of-Thumb Takeout: 5 8 × NPS \frac{5}{8} \times \text{NPS} 8 5 × NPS (or 0.625 × NPS 0.625 \times \text{NPS} 0.625 × NPS ).
Example: For an 8 in. 8\text{ in.} 8 in. LR 45 ∘ 45^\circ 4 5 ∘ elbow:
Exact: 1.5 × 8 × 0.41421 = 4.970 in. 1.5 \times 8 \times 0.41421 = 4.970\text{ in.} 1.5 × 8 × 0.41421 = 4.970 in.
Rule of thumb: 8 × 0.625 = 5.000 in. 8 \times 0.625 = 5.000\text{ in.} 8 × 0.625 = 5.000 in. (Standard published catalog center-to-face is 5.0 inches 5.0\text{ inches} 5.0 inches ).
General Angle Elbow Takeout Formula: For any custom mitered or cut elbow of angle θ \theta θ with radius R R R : Takeout = R × tan ( θ 2 ) \text{Takeout} = R \times \tan\left(\frac{\theta}{2}\right) Takeout = R × tan ( 2 θ )
Weld Neck Flanges: Takeout equals the total overall length from the raised face (or ring joint face) to the beveled welding hub end (obtained from ASME B16.5 dimension charts).
Weld Root Gap Allowance
Standard ASME Section IX and B31.1 pipe welding procedures specify a root opening ( gap ) between the pipe end and fitting bevel to guarantee complete root penetration (typically 1 8 inch \frac{1}{8}\text{ inch} 8 1 inch or 0.125 in. 0.125\text{ in.} 0.125 in. per butt weld joint, or 3 / 32 in. 3/32\text{ in.} 3/32 in. for GTAW root passes). Cut Pipe Length (Pup) = True Travel − ( Takeout 1 + Takeout 2 ) − ( Gap 1 + Gap 2 ) \text{Cut Pipe Length (Pup)} = \text{True Travel} - (\text{Takeout}_1 + \text{Takeout}_2) - (\text{Gap}_1 + \text{Gap}_2) Cut Pipe Length (Pup) = True Travel − ( Takeout 1 + Takeout 2 ) − ( Gap 1 + Gap 2 )
Comprehensive Worked Fabrication Problem
Scenario: A boilermaker is fabricating an 8 in. 8\text{ in.} 8 in. Nominal Pipe Size (Schedule 40, D o = 8.625 in. D_o = 8.625\text{ in.} D o = 8.625 in. ) boiler feed piping run requiring a 45 ∘ 45^\circ 4 5 ∘ compound rolling offset.
- Rise (Set): 15 inches 15\text{ inches} 15 inches
- Roll: 20 inches 20\text{ inches} 20 inches
Fittings: Two 8 in. 8\text{ in.} 8 in. LR 45 ∘ 45^\circ 4 5 ∘ Butt-Weld Elbows (Takeout = 5.000 in. = 5.000\text{ in.} = 5.000 in. each)
Weld Root Gap: 1 / 8 in. 1/8\text{ in.} 1/8 in. ( 0.125 in. 0.125\text{ in.} 0.125 in. ) at each joint ( 2 2 2 butt welds total)
Step 1: Calculate Plan Travel (Intermediate Hypotenuse): Plan Travel = 15 2 + 20 2 = 225 + 400 = 625 = 25.000 inches \text{Plan Travel} = \sqrt{15^2 + 20^2} = \sqrt{225 + 400} = \sqrt{625} = 25.000\text{ inches} Plan Travel = 1 5 2 + 2 0 2 = 225 + 400 = 625 = 25.000 inches
Step 2: Calculate True Travel (Center-to-Center): True Travel = Plan Travel × 1.4142 = 25.000 × 1.4142 = 35.355 inches ≈ 35 – 3 8 in. \text{True Travel} = \text{Plan Travel} \times 1.4142 = 25.000 \times 1.4142 = 35.355\text{ inches} \approx 35\text{--}\frac{3}{8}\text{ in.} True Travel = Plan Travel × 1.4142 = 25.000 × 1.4142 = 35.355 inches ≈ 35 – 8 3 in.
Step 3: Calculate Total Fitting Takeouts: Total Takeouts = 5.000 in. + 5.000 in. = 10.000 inches \text{Total Takeouts} = 5.000\text{ in.} + 5.000\text{ in.} = 10.000\text{ inches} Total Takeouts = 5.000 in. + 5.000 in. = 10.000 inches
Step 4: Calculate Total Weld Root Gaps: Total Root Gaps = 0.125 in. + 0.125 in. = 0.250 in. = 1 4 inch \text{Total Root Gaps} = 0.125\text{ in.} + 0.125\text{ in.} = 0.250\text{ in.} = \frac{1}{4}\text{ inch} Total Root Gaps = 0.125 in. + 0.125 in. = 0.250 in. = 4 1 inch
Step 5: Calculate Cut Pipe (Pup) Length: Cut Pipe Length = 35.355 − 10.000 − 0.250 = 25.105 inches ≈ 25 – 1 8 inches \text{Cut Pipe Length} = 35.355 - 10.000 - 0.250 = 25.105\text{ inches} \approx 25\text{--}\frac{1}{8}\text{ inches} Cut Pipe Length = 35.355 − 10.000 − 0.250 = 25.105 inches ≈ 25 – 8 1 inches Final Cut Dimension: 25 – 1 8 in. \text{Final Cut Dimension: } 25\text{--}\frac{1}{8}\text{ in.} Final Cut Dimension: 25 – 8 1 in.