Study guide

9.7 Crane Safety Devices Out of Service, Emergency Procedures & Responding to Crane Incidents

NCCER Rigger Basic / Advanced

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Overview, Qualifications & Safety Standards

1.1 NCCER Rigger Certification Structure, Exam Format & Testing Policies 1.2 OSHA 29 CFR 1926 Subpart CC & Qualified Rigger Requirements 1.3 ASME B30 Standards Framework for Rigging & Lifting 1.4 Job-Site Safety, Hazard Identification & Exclusion Zones

2 Chapter 2: Slings & Hitches

2.1 Types of Slings: Synthetic, Wire Rope, Alloy Chain & Metal Mesh 2.2 Basic Rigging Hitches: Vertical, Choker, Basket & Bridles 2.3 Choker Hitch Reductions & Choke Angle Factors 2.4 Basket Hitch Configurations, D/d Ratios & Efficiency

3 Chapter 3: Sling Angles & Tension Calculations

3.1 Principles of Sling Leg Angle & Horizontal Sling Angles 3.2 Sling Tension Formulas & Worked Calculation Examples 3.3 Critical Sling Angles & The 30-Degree Prohibition 3.4 Symmetrical vs. Non-Symmetrical Bridle Leg Tension & Center of Gravity Alignment

4 Chapter 4: Sling Inspection & Removal Criteria

4.1 Wire Rope Sling Inspection & ASME B30.9 Removal Criteria 4.2 Synthetic Web & Round Sling Inspection & Removal Criteria 4.3 Alloy Steel Chain Sling Inspection & Wear Limits 4.4 Metal Mesh & High-Performance Synthetic Slings Inspection

5 Chapter 5: Rigging Hardware & Below-the-Hook Lifting Devices

5.1 Shackles: Types, Application, Loading & ASME B30.26 Inspection 5.2 Eyebolts, Swivel Hoist Rings & Angular Loading Deratings 5.3 Hooks: Types, ASME B30.10 Inspection Criteria & Latch Requirements 5.4 Below-the-Hook Lifting Devices: Spreader Bars, Equalizer Beams & ASME B30.20

6 Chapter 6: Rigging Hardware Connections & Specialty Tools

6.1 Turnbuckles, Rigging Links & Master Rings 6.2 Wire Rope Clips: U-Bolt vs. Fist Grip & Installation Efficiency 6.3 Wedge Sockets & Wire Rope End Terminations 6.4 Snatch Blocks, Sheaves & Lead Line Calculations 6.5 Hoisting & Jacking Equipment: Chain Hoists, Lever Hoists, Winches & Gantries 6.6 Rigging Knots, Fiber Rope & Rope Work for Load Control

7 Chapter 7: Wire Rope Construction, Inspection & Reeving

7.1 Wire Rope Components, Core Types & Lay Classifications 7.2 Crane Hoist Wire Rope Inspection & Retirement Criteria 7.3 Reeving Patterns, Parts of Line & Mechanical Advantage 7.4 Hoist Drum Capacity, Fleet Angle & Minimum Wraps 7.5 Wire Rope Handling, Installation, Storage & Field Maintenance

8 Chapter 8: Load Weight Estimation & Center of Gravity

8.1 Material Densities & Basic Volume Formulas for Riggers 8.2 Load Weight Calculations for Symmetrical & Composite Shapes 8.3 Determining Center of Gravity (CG) for Regular & Irregular Loads 8.4 Center of Gravity Above vs. Below Pick Points & Load Stability

9 Chapter 9: Crane Operations, Safety Devices & Communication

9.1 Mobile Crane Types, Quadrants of Operation & Boom Geometry 9.2 Crane Safety Devices & Operational Aids (A2B, LMI, Level Indicators) 9.3 Standard ASME B30.5 Hand Signals & Radio Communication Protocols 9.4 Power Line Clearances, Weather Limits & Ground Bearing Conditions 9.5 Telescopic Boom Attachments: Swing-Away Extensions, Jibs, Erecting & Stowing 9.6 Crane Assembly & Disassembly: Lattice Boom, Counterweights & the A/D Director 9.7 Crane Safety Devices Out of Service, Emergency Procedures & Responding to Crane Incidents

10 Chapter 10: Advanced Rigging Operations & Lateral Movement

10.1 Lateral Load Movement: Incline Planes, Friction & Required Line Pull 10.2 Drifting Loads Between Two Hoists & Load Transfer Principles 10.3 Inverting, Rolling & Turning Heavy Loads 10.4 Advanced Cribbing, Blocking & Jacking Operations 10.5 Rigging Piping, Pipe Spools & Rebar Bundles

11 Chapter 11: Complex Lift Planning & Multi-Crane Lifts

11.1 Lift Plan Components, Roles & Responsibilities 11.2 Critical Lift Criteria & Engineering Analysis 11.3 Multi-Crane Tandem Lifts: Load Distribution & Synchronization 11.4 Crane Load Chart Deductions: Net vs. Gross Capacity Calculations 11.5 Reading Mobile Crane Load Charts: Configurations, Range Diagrams & Chart Selection

12 Chapter 12: Personnel Hoisting & Site Rigging Management

12.1 OSHA 29 CFR 1926.1431 Personnel Hoisting Regulations & Derating 12.2 Suspended Personnel Platforms: Design, Proof Testing & Trial Lift 12.3 Tagline Safety, Load Control & Line-of-Fire / Pinch-Point Hazards 12.4 Rigging Storage, Maintenance, Documentation & Periodic Inspection Logs

9.7 Crane Safety Devices Out of Service, Emergency Procedures & Responding to Crane Incidents

Key Takeaways Explain This Topic AI

Responding to crane incidents is an explicit sub-topic of the NCCER Rigger Crane Knowledge domain and is taught in module 21106, Crane Safety and Emergency Procedures.

On power line contact the operator stays in the cab if at all possible; everyone on the ground stays back and touches nothing, because the ground itself becomes energized in concentric voltage-gradient rings.

If leaving an energized machine is unavoidable, jump clear so that no part of the body touches the machine and the ground at the same time, land with feet together, and shuffle or hop away in small steps without breaking contact between the feet.

OSHA 1926.1415 safety devices are go/no-go: if a listed safety device is not working, operations stop. 1926.1416 operational aids permit temporary operation only under specified alternative measures with a repair deadline.

NCCER requires certified riggers to report any rigging- or signal-person-related accident, or a significant change in medical, physical, or operational ability, on the Incident Report Form within 48 hours or all active certifications are revoked.

Last updated: August 2026

9.7 Crane Safety Devices Out of Service, Emergency Procedures & Responding to Crane Incidents

The NCCER Rigger written assessment lists "responding to various crane incidents" as a sub-topic under mobile crane safety operating considerations, and module 21106, Crane Safety and Emergency Procedures , is 25 hours of the Basic Rigger curriculum — the single largest module in that level. Section 9.2 covered what the safety devices do; this section covers what happens when they fail, and what the crew does when something goes wrong.

Power Line Contact: The Highest-Consequence Incident

When a crane, load line, or load contacts an energized conductor, the machine becomes energized and so does the ground around it. Current spreads outward through the soil in concentric rings of falling voltage. A person standing with their feet apart bridges two rings at different potentials, and current flows up one leg and down the other. This is step potential , and it kills people who never touched the crane.

The response, in order:

The operator stays in the cab. Inside the cab the operator is at the same potential as the machine and is not part of any circuit. Staying put is nearly always the survivable choice.

Everyone on the ground moves away and touches nothing — not the crane, not the load, not the load line, not the taglines, not the outrigger pads, not anything the machine is touching.

The operator attempts to break contact from the cab by reversing the motion that caused it — booming up, swinging away, or retracting — only if it can be done safely and the machine still responds .

Call the utility. Nobody approaches until the utility confirms the line is de-energized, grounded, and cleared. A "downed" line can re-energize automatically through reclosers.

If the operator must leave (fire, imminent collapse): jump clear so no part of the body touches the machine and the ground simultaneously — never step down while holding on. Land with both feet together , then shuffle or bunny-hop away in small steps keeping the feet in contact with each other, until well clear.

The engineering control that prevents all of this is clearance. Under 29 CFR 1926.1408, the minimum clearance for lines up to 50 kV is 10 feet , and over 50 kV to 200 kV it is 15 feet , with a dedicated spotter whose sole duty is to watch the gap.

Safety Devices vs. Operational Aids: What Stops Work

This distinction is a recurring exam item because the consequence of each category is different.

Category Standard Examples If it is not working

Safety devices 29 CFR 1926.1415 Crane level indicator, boom stops, jib stops, foot pedal brake locks, integral holding device/check valve, rail clamps and rail stops, horn Operations must not begin. If it fails during operation, the operator safely stops until it is repaired. There is no temporary-measure path.

Operational aids 29 CFR 1926.1416 Boom hoist limiting device, load moment/rated capacity indicator (LMI/RCI), boom angle or radius indicator, hoist drum rotation indicator, anti two-block (on equipment where it is an aid rather than required) Temporary alternative measures are permitted while the aid is repaired, within a stated repair timeline, provided the specified substitute procedure is followed.

When an LMI/RCI is out of service, the substitute is exactly what a competent rigger should be doing anyway: verify the actual weight of the load, physically measure the radius before each pick, and confirm the pick against the printed load chart — with the lift director accountable for each step.

Responding to Other Crane Incidents

Incident Immediate response

Incipient tip-over (crane starts to lift an outrigger or track) Do not boom up and do not hoist up — both may make it worse. Reduce the overturning moment: swing back toward the most stable quadrant if the machine still responds, and if possible land the load by lowering it to the ground. Get all personnel out of the fall and tip path.

Two-block condition Stop all motion. Do not attempt to power out of it. The parted line drops the block on whatever is below. Lower the boom or spool out only under a plan, after the area beneath is cleared.

Load hoist brake failure / load drift Sound the alarm, clear the drop zone immediately, and land the load at the nearest safe point rather than trying to hold it.

Boom hoist brake failure during A/D This is why 1926.1404(h) requires testing the boom hoist brake each time reliance is placed on it. If it fails, the boom must be supported by other means before anyone enters the zone.

Sudden wind increase / lightning Set the load down, secure or stow the boom per the manufacturer, and clear personnel. Wind limits are set by the manufacturer for the specific boom and jib configuration and by the sail area of the load, not by comfort.

Dropped or shock-loaded rigging All rigging involved is removed from service and inspected by a qualified person before reuse. Shock-loaded gear is not re-rated in the field.

Any contact, upset, or personal injury Stop work, secure the scene, preserve the equipment and rigging as-is for investigation, and report through the employer's process.

The Rigger's Reporting Duty

Certification carries a personal obligation that survives the incident itself. NCCER requires a certified Rigger, Advanced Rigger, or Signal Person to notify NCCER within 48 hours of any rigging- or signal-person-related accident, or of any significant change in their medical, physical, or operational abilities, by submitting the Incident Report Form . Failure to report inside that window results in the immediate revocation of all active certifications .

NCCER may also revoke certification for misrepresenting or falsifying documents, failing a substance abuse test, or rigging/signal-person error causing a related accident. Revocation decisions may be appealed in writing within 30 days of notification, and the Appeals Committee decision is final.