Study guide

3.4 Symmetrical vs. Non-Symmetrical Bridle Leg Tension & Center of Gravity Alignment

NCCER Rigger Basic / Advanced

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Overview, Qualifications & Safety Standards

1.1 NCCER Rigger Certification Structure, Exam Format & Testing Policies 1.2 OSHA 29 CFR 1926 Subpart CC & Qualified Rigger Requirements 1.3 ASME B30 Standards Framework for Rigging & Lifting 1.4 Job-Site Safety, Hazard Identification & Exclusion Zones

2 Chapter 2: Slings & Hitches

2.1 Types of Slings: Synthetic, Wire Rope, Alloy Chain & Metal Mesh 2.2 Basic Rigging Hitches: Vertical, Choker, Basket & Bridles 2.3 Choker Hitch Reductions & Choke Angle Factors 2.4 Basket Hitch Configurations, D/d Ratios & Efficiency

3 Chapter 3: Sling Angles & Tension Calculations

3.1 Principles of Sling Leg Angle & Horizontal Sling Angles 3.2 Sling Tension Formulas & Worked Calculation Examples 3.3 Critical Sling Angles & The 30-Degree Prohibition 3.4 Symmetrical vs. Non-Symmetrical Bridle Leg Tension & Center of Gravity Alignment

4 Chapter 4: Sling Inspection & Removal Criteria

4.1 Wire Rope Sling Inspection & ASME B30.9 Removal Criteria 4.2 Synthetic Web & Round Sling Inspection & Removal Criteria 4.3 Alloy Steel Chain Sling Inspection & Wear Limits 4.4 Metal Mesh & High-Performance Synthetic Slings Inspection

5 Chapter 5: Rigging Hardware & Below-the-Hook Lifting Devices

5.1 Shackles: Types, Application, Loading & ASME B30.26 Inspection 5.2 Eyebolts, Swivel Hoist Rings & Angular Loading Deratings 5.3 Hooks: Types, ASME B30.10 Inspection Criteria & Latch Requirements 5.4 Below-the-Hook Lifting Devices: Spreader Bars, Equalizer Beams & ASME B30.20

6 Chapter 6: Rigging Hardware Connections & Specialty Tools

6.1 Turnbuckles, Rigging Links & Master Rings 6.2 Wire Rope Clips: U-Bolt vs. Fist Grip & Installation Efficiency 6.3 Wedge Sockets & Wire Rope End Terminations 6.4 Snatch Blocks, Sheaves & Lead Line Calculations 6.5 Hoisting & Jacking Equipment: Chain Hoists, Lever Hoists, Winches & Gantries 6.6 Rigging Knots, Fiber Rope & Rope Work for Load Control

7 Chapter 7: Wire Rope Construction, Inspection & Reeving

7.1 Wire Rope Components, Core Types & Lay Classifications 7.2 Crane Hoist Wire Rope Inspection & Retirement Criteria 7.3 Reeving Patterns, Parts of Line & Mechanical Advantage 7.4 Hoist Drum Capacity, Fleet Angle & Minimum Wraps 7.5 Wire Rope Handling, Installation, Storage & Field Maintenance

8 Chapter 8: Load Weight Estimation & Center of Gravity

8.1 Material Densities & Basic Volume Formulas for Riggers 8.2 Load Weight Calculations for Symmetrical & Composite Shapes 8.3 Determining Center of Gravity (CG) for Regular & Irregular Loads 8.4 Center of Gravity Above vs. Below Pick Points & Load Stability

9 Chapter 9: Crane Operations, Safety Devices & Communication

9.1 Mobile Crane Types, Quadrants of Operation & Boom Geometry 9.2 Crane Safety Devices & Operational Aids (A2B, LMI, Level Indicators) 9.3 Standard ASME B30.5 Hand Signals & Radio Communication Protocols 9.4 Power Line Clearances, Weather Limits & Ground Bearing Conditions 9.5 Telescopic Boom Attachments: Swing-Away Extensions, Jibs, Erecting & Stowing 9.6 Crane Assembly & Disassembly: Lattice Boom, Counterweights & the A/D Director 9.7 Crane Safety Devices Out of Service, Emergency Procedures & Responding to Crane Incidents

10 Chapter 10: Advanced Rigging Operations & Lateral Movement

10.1 Lateral Load Movement: Incline Planes, Friction & Required Line Pull 10.2 Drifting Loads Between Two Hoists & Load Transfer Principles 10.3 Inverting, Rolling & Turning Heavy Loads 10.4 Advanced Cribbing, Blocking & Jacking Operations 10.5 Rigging Piping, Pipe Spools & Rebar Bundles

11 Chapter 11: Complex Lift Planning & Multi-Crane Lifts

11.1 Lift Plan Components, Roles & Responsibilities 11.2 Critical Lift Criteria & Engineering Analysis 11.3 Multi-Crane Tandem Lifts: Load Distribution & Synchronization 11.4 Crane Load Chart Deductions: Net vs. Gross Capacity Calculations 11.5 Reading Mobile Crane Load Charts: Configurations, Range Diagrams & Chart Selection

12 Chapter 12: Personnel Hoisting & Site Rigging Management

12.1 OSHA 29 CFR 1926.1431 Personnel Hoisting Regulations & Derating 12.2 Suspended Personnel Platforms: Design, Proof Testing & Trial Lift 12.3 Tagline Safety, Load Control & Line-of-Fire / Pinch-Point Hazards 12.4 Rigging Storage, Maintenance, Documentation & Periodic Inspection Logs

3.4 Symmetrical vs. Non-Symmetrical Bridle Leg Tension & Center of Gravity Alignment

Key Takeaways Explain This Topic AI

When the Center of Gravity (CG) is offset from the geometric midpoint, the sling leg closest to the CG carries a disproportionately larger share of the total load weight.

Vertical load distribution is calculated using the Principle of Moments: Share 1 = Load * (Distance of CG to Leg 2 / Total Span) and Share 2 = Load * (Distance of CG to Leg 1 / Total Span).

Total sling tension in a non-symmetrical pick requires a two-stage calculation: first determine each leg's vertical share, then multiply each vertical share by that leg's unique Load Angle Factor (L / H).

Non-symmetrical bridle legs usually have unequal lengths and distinct horizontal sling angles, requiring independent tension calculations for each leg.

The crane hook must always be positioned directly above the Center of Gravity prior to hoisting; otherwise, the load will tilt and swing horizontally upon leaving the ground until the CG aligns vertically beneath the hook.

Last updated: August 2026

Symmetrical vs. Non-Symmetrical Bridle Leg Tension & Center of Gravity Alignment

Core Principle of Moments: In any non-symmetrical rigging arrangement, the sling leg closest to the Center of Gravity (CG) carries the majority of the weight. To calculate the vertical load share on any single pick point, multiply the total load weight by the distance from the CG to the opposite pick point, divided by the total span between pick points.

In standard symmetrical rigging, the Center of Gravity lies equidistant between identical pick points, resulting in perfectly equal load sharing (W / N). However, real-world industrial loads—such as pumps with heavy electric motors, gearboxes with offset drives, transformers with internal core offsets, and fabricated machinery skids—frequently have an off-center Center of Gravity .

When rigging an off-center load, assuming equal load sharing is a critical error that can result in immediate sling failure, violent load shifting, or structural tipping.

The Principle of Moments & Vertical Share Derivation

Static equilibrium requires two conditions to be met simultaneously when a load is suspended:

Σ Fy = 0 (The sum of upward vertical forces must equal the total downward weight).

Σ M = 0 (The sum of clockwise moments must equal the sum of counterclockwise moments around any reference point). Hook (Must be Plumb over CG)

  • /|
  • / |
  • / | H
  • Leg 1 (L1)/ | \ Leg 2 (L2)
  • / | \
  • / θ1 | θ2 \
  • [Pick Point 1] ------+-----+-----+------ [Pick Point 2]
  • |< D1 >|< D2 >|
  • |<---- Span (S) --->|
  • [CG]
  • Total Weight (W)
  • Mathematical Formulation

Let:

  • W = Total weight of the load
  • S = Total span between Pick Point 1 and Pick Point 2 (S = D1 + D2)
  • D1 = Horizontal distance from Pick Point 1 to the Center of Gravity
  • D2 = Horizontal distance from Pick Point 2 to the Center of Gravity
  • V1 = Vertical load share supported by Pick Point 1
  • V2 = Vertical load share supported by Pick Point 2

Taking moments about Pick Point 2 (setting sum of moments to zero):

V1 * S = W * D2 -> V1 = W * (D2 / S)

Taking moments about Pick Point 1:

V2 * S = W * D1 -> V2 = W * (D1 / S)

Note

Notice the inverse relationship: Pick Point 1's share is proportional to distance D2 , and Pick Point 2's share is proportional to distance D1 . The closer a pick point is to the CG, the larger its share of the load.

The Two-Stage Non-Symmetrical Tension Calculation Procedure

Calculating sling tension in a non-symmetrical lift requires two distinct, sequential stages:

Stage 1: Calculate the Vertical Share (V) for each pick point using the moment equations:

  • V1 = W * (D2 / S)
  • V2 = W * (D1 / S)

Stage 2: Calculate the Leg Tension (T) for each leg independently by multiplying that leg's vertical share by its specific Load Angle Factor:

  • T1 = V1 * LAF1 = V1 * (L1 / H1) = V1 / sin(θ1)
  • T2 = V2 * LAF2 = V2 * (L2 / H2) = V2 / sin(θ2)
  • Comprehensive Worked Numerical Example: Off-Center Industrial Generator

Let us analyze a real-world complex rigging problem with complete step-by-step numbers.

  • Lift Specifications
  • Total Load Weight (W): 18,000 lbs
  • Total Span Between Lugs (S): 20.0 ft

Center of Gravity Location: Located 6.0 ft from Lug 1 (D1 = 6.0 ft) and 14.0 ft from Lug 2 (D2 = 14.0 ft).

Crane Hook Vertical Height (H): The crane hook is positioned directly above the CG at a vertical height of H = 8.0 ft above the pick-point plane. Crane Hook

  • /|
  • / |
  • / | H = 8.0 ft
  • L1 = 10.0'/ | \ L2 = 16.12'
  • / | \
  • / θ1 | θ2 \
  • [Lug 1] -------+-----+-----+------- [Lug 2]
  • | 6.0'| 14.0'|
  • |<-- Span = 20.0' -->|
  • [CG]
  • 18,000 lbs
  • Step 1: Calculate Vertical Load Shares (V1 and V2)
  • V1 = W * (D2 / S) = 18,000 lbs * (14.0 ft / 20.0 ft) = 18,000 * 0.70 = 12,600 lbs
  • V2 = W * (D1 / S) = 18,000 lbs * (6.0 ft / 20.0 ft) = 18,000 * 0.30 = 5,400 lbs
  • Check: V1 + V2 = 12,600 lbs + 5,400 lbs = 18,000 lbs (Matches total weight)
  • Step 2: Determine Sling Leg Geometry (L1, L2, θ1, θ2)

Because the hook is centered over the CG (H = 8.0 ft):

Leg 1 Geometry:

  • Horizontal run = D1 = 6.0 ft
  • Vertical rise = H = 8.0 ft
  • Sling Length L1 = √(6.0² + 8.0²) = √(36 + 64) = √100 = 10.0 ft
  • LAF1 = L1 / H = 10.0 ft / 8.0 ft = 1.250
  • Horizontal Angle θ1 = arctan(8.0 / 6.0) = 53.13°

Leg 2 Geometry:

  • Horizontal run = D2 = 14.0 ft
  • Vertical rise = H = 8.0 ft
  • Sling Length L2 = √(14.0² + 8.0²) = √(196 + 64) = √260 ≈ 16.12 ft
  • LAF2 = L2 / H = 16.12 ft / 8.0 ft = 2.015
  • Horizontal Angle θ2 = arctan(8.0 / 14.0) = 29.74° ≈ 30°
  • Step 3: Calculate Actual Sling Leg Tensions (T1 and T2)
  • T1 = V1 * LAF1 = 12,600 lbs * 1.250 = 15,750 lbs
  • T2 = V2 * LAF2 = 5,400 lbs * 2.015 = 10,881 lbs
  • Critical Engineering Insights from Example

Leg 1 (Close to CG): Carries 70% of the vertical weight (12,600 lbs) and has a steep angle (53.1°), resulting in 15,750 lbs of tension.

Leg 2 (Far from CG): Carries only 30% of the vertical weight (5,400 lbs), but because its horizontal angle is shallow (29.7°), its Load Angle Factor is 2.015, doubling its tension to 10,881 lbs.

Rigging Selection: Sling 1 must have a WLL >= 16,000 lbs (8 tons), while Sling 2 must have a WLL >= 11,000 lbs (5.5 tons). Note that Leg 2 is right at the 30° prohibition threshold; to improve safety, the hook height H should be increased by lengthening both slings.

Center of Gravity Hook Alignment & Load Stability

Before hoisting any load, the crane hook MUST be positioned directly over the Center of Gravity . HOOK ALIGNED OVER CG (STABLE) HOOK OFF-CENTER FROM CG (UNSTABLE)

  • Hook Hook
  • | |
  • / \ / \
  • / \ / \
  • / * \ / \ *
  • ---+-- CG -+---- ----+-------+-- CG --
  • Load lifts level Load violently tilts and swings

upon leaving ground!

Consequences of Off-Center Hook Placement

If the crane hook is positioned over the physical center of the load rather than the Center of Gravity:

Violent Tilting on Liftoff: As soon as the load leaves the ground, it will instantly rotate until the Center of Gravity settles directly plumb beneath the crane hook apex.

Load Swing and Dynamic Shock: The lateral shift creates a swinging pendulum motion that introduces dynamic shock loading to the crane boom and rigging hardware.

Sling Slippage or Unhooking: Rapid rotation can cause loose slings to slip off unshouldered lugs or roll out of basket hitches.

Hardware for Leveling and Load Equalization

To rig non-symmetrical loads safely while keeping the load level and the crane hook centered over the CG, riggers use specialized adjustable rigging hardware:

Hardware Device Operating Principle Primary Application

Adjustable Chain Sling Legs Alloy chain legs equipped with shortening clutches or cradle grab hooks to adjust individual leg lengths to the exact inch. Lifting machinery with irregular pick-point heights or off-center CG.

Equalizer Beam A pivoting beam with a shackle attachment on top and bottom lugs that pivots to balance vertical tension between legs. 2-crane tandem lifts, dual-lug heavy rigging, and 4-point skid leveling.

Rigging Turnbuckles (Jaw-to-Jaw) Threaded turnbuckles rated for overhead lifting that provide micro-adjustment of leg lengths under tension. Precision leveling of precast concrete panels, turbines, and optical assemblies.

Chain Hoists / Come-Alongs (Lever Tools) Manual chain hoists placed in-line with one sling leg (when approved by engineering) to adjust length under load. Drifting and rolling loads, setting precise tilt angles during vessel installation.