11.3 Consultant Coordination: Power, Data & Communication Plans

NCIDQ Interior Design Qualification Exam

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Exam Overview

1.1 About the NCIDQ Exam 1.2 Eligibility & Application Routes 1.3 Test-Taking Strategies & Item Types 1.4 The 2026 NCIDQ Blueprint Overview

2 Study Planning, Codes & Logistics

2.1 Building a Study Plan 2.2 Codes & Reference Standards Overview 2.3 Fees, Schedule & Logistics

3 IDFX: Existing Conditions

3.1 Existing Conditions: Initial Code Analysis 3.2 Existing Conditions: Evaluating the Building

4 IDFX: Pre-Design

4.1 Pre-Design: Site Analysis 4.2 Pre-Design: Best Practices of Design 4.3 Pre-Design: Project Research & Development 4.4 Pre-Design: Determining Design Intent

5 IDFX: Programming

5.1 Programming: Validating the Project Program 5.2 Programming: Programmatic Diagrams 5.3 Programming: Determining User Needs

6 IDFX: Space Planning & Preliminary FF&E

6.1 Space Planning: Completing Space Plans 6.2 Space Planning: Creating Initial Drawings 6.3 Preliminary FF&E: Identifying Finish Materials 6.4 Preliminary FF&E: Identifying Significant FF&E

7 IDFX: Schematics

7.1 Schematics: Refining Design Intent 7.2 Schematics: Performing Code Review 7.3 Schematics: Visualizing Design

8 IDIX: Codes & Life Safety

8.1 Codes & Life Safety: Performing Code Review 8.2 Codes & Life Safety: Life Safety & Occupancy Plan

9 IDIX: Integration & FF&E

9.1 Integration: Integrating Equipment & Building Systems 9.2 Integration: Developing Finish Plan & Specifications 9.3 Integration: Developing Furniture Plans & Specifications

10 IDIX: Construction Documents

10.1 Construction Documents: Details & Sections 10.2 Construction Documents: Elevations 10.3 Construction Documents: Demolition Plans 10.4 Construction Documents: Construction Plans

11 IDIX: RCP & Consultant Coordination

11.1 Construction Documents: Reflected Ceiling Plans 11.2 Consultant Coordination: Coordinating Consultant Drawings & Specs 11.3 Consultant Coordination: Power, Data & Communication Plans 11.4 Consultant Coordination: Signage & Wayfinding

12 IDIX: Construction Specifications & Schedules

12.1 Construction Specifications & Schedules: Developing Construction Specifications 12.2 Construction Specifications & Schedules: Developing Schedules

13 IDPX: Feasibility Studies

13.1 Feasibility Studies: Identifying Project Stakeholders 13.2 Feasibility Studies: Managing the Project Team 13.3 Feasibility Studies: Evaluating Project Feasibility & Due Diligence

14 IDPX: Scheduling, Budgeting & Contracts

14.1 Scheduling & Budgeting: Managing the Project Schedule 14.2 Scheduling & Budgeting: Managing the Project Budget 14.3 Contracts & Procurement: Facilitating the Procurement/Bid Process 14.4 Contracts & Procurement: Managing Proposals & Contracts

15 IDPX: Approvals, Permitting & Construction Process

15.1 Approvals & Permitting: Obtaining Project Approvals 15.2 Approvals & Permitting: Participating in the Permit Process 15.3 Construction Process: Facilitating the Construction Process 15.4 Construction Process: Participating in Change Management

16 IDPX: Site Observation & Project Close-Out

16.1 Project Closeout & Evaluation: Performing Site Visits 16.2 Project Closeout & Evaluation: Conducting Project Close-Out

17 Final Review: Synthesizing the NCIDQ & Exam-Day Readiness

17.1 Synthesizing the Three Sections 17.2 Common Pitfalls & High-Yield Topics 17.3 Exam-Day Readiness & Final-Week Plan

11.3 Consultant Coordination: Power, Data & Communication Plans

Key Takeaways Explain This Topic AI

The interior designer's power plan locates devices; the electrical engineer's plan shows circuits — they are distinct drawings with distinct purposes

NEC 210.52 governs receptacle spacing (24-inch wall rule, 24-inch countertop rule) but does not mandate a specific mounting height

ADA and A117.1 Section 308 sets the reach range at 15 inches min to 48 inches max AFF for unobstructed front and side reach to operable parts

IECC 2024 requires at least 50 percent of office receptacles to be controlled by occupancy sensors

Floor boxes, poke-throughs, and surface raceways are three methods for delivering power away from walls in open-plan environments

Last updated: August 2026

What Is a Power, Data, and Communication Plan?

The Power, Data, and Communication Plan (often called the power plan or electrical coordination plan) is the interior designer's drawing that shows where every electrical device, data outlet, communication port, and low-voltage connection goes — and how each ties into the furniture, millwork, and building systems. It is distinct from the electrical engineer's power plan, which shows branch circuits, panel connections, and conduit runs. The interior designer's plan is about device location and coordination , not circuit design.

Device and Outlet Locations

The power plan locates every receptacle, switch, data jack, and low-voltage device relative to the floor plan, furniture, and millwork. Key considerations:

Receptacle spacing — NEC 210.52 requires a receptacle on any wall space 24 inches or wider; countertop receptacles no more than 24 inches apart (no point on the counter more than 24 inches from an outlet).

Countertop height — Countertop receptacles cannot be more than 20 inches above the counter surface.

GFCI — Required within 6 feet of a sink, in garages, outdoors, and in other wet or damp locations per NEC 210.8.

Mounting Heights

The NEC does not mandate a specific mounting height for general-use receptacles. Accessibility is governed by ADA/A117.1 Section 308 Reach Ranges :

  • Reach Type Height Range (AFF)
  • Front reach, unobstructed 15 in min to 48 in max
  • Side reach, unobstructed 15 in min to 48 in max
  • Front reach over obstruction deeper than 20 in 44 in max
  • Side reach over obstruction deeper than 10 in (max 24 in deep) 46 in max

Industry standard for general receptacles: 15–18 inches AFF to the centerline. Switches and controls: 48 inches max to the operable part. Exceptions: dedicated-use receptacles (refrigerator, range), floor receptacles, and appliance-mounted controls are exempt from reach-range requirements.

Outlet Types and Installation Methods

  • Type Application Installation
  • Wall receptacle General power at walls Box in wall, 15–18 in AFF
  • Floor box Open plan, away from walls Recessed in slab or raised floor
  • Poke-through Power from floor above through slab Core-drilled penetration
  • Raceway (surface) Existing walls, retrofits Surface-mounted conduit
  • Millwork outlet Inside cabinetry Grommet or pop-up in counter
  • In-cabinet lighting outlet Under-cabinet or in-cabinet Switched, inside cabinet
  • AV Integration

Audiovisual coordination is a major part of the power plan. The designer must locate:

  • Display power — Receptacle behind wall-mounted monitor
  • Data — Cat 6 or Cat 6A jack at display location
  • Conduit — Empty chase from floor to display for future cabling
  • Ceiling projector — Power and data at projector mount
  • Speakers — Power at amplifier location
  • Control panel — Power and data at lectern or wall
  • Security Integration

Security systems require power and data coordination:

  • Access control readers — Card readers at doors; power and data
  • Cameras — PoE (Power over Ethernet) or separate power; data to head-end
  • Intrusion detection — Door contacts, motion sensors; low-voltage wiring
  • Door hardware — Electrified locks, strikes, mag locks; coordinate with door schedule
  • Low-Voltage Coordination

Low-voltage systems include data, telephone, AV, security, and building automation. The designer coordinates:

  • Data jacks — Cat 6 or Cat 6A at workstations, conference tables, walls
  • Telephone — Often combined with data via VoIP
  • AV outlets — At conference tables, walls, ceilings
  • Smart building sensors — Occupancy, temperature, CO2; coordinate with mechanical
  • FF&E Coordination

Furniture, fixtures, and equipment (FF&E) often need power. The designer coordinates:

  • Powered workstations — Modular furniture with integrated raceways; power whip from floor box or wall
  • Conference tables — Pop-up power and data modules in the tabletop
  • Soft seating — Floor outlets for lounge chairs with device charging
  • Kitchenettes — Countertop appliances; dedicated circuits
  • Millwork Coordination

Millwork requires specific power and lighting:

  • Under-cabinet lighting — Switched, often LED tape; coordinate with millwork shop drawings
  • In-cabinet lighting — For glass-front display cabinets; switched
  • Inside outlets — For charging devices inside drawers or cabinets
  • Appliance garages — Dedicated outlet for coffee maker, microwave
  • Toe-kick lighting — Low-level LED for wayfinding; coordinate with power plan
  • Energy Code

The power plan must comply with the same energy code as the lighting plan. IECC 2024 requires:

Receptacle control — At least 50 percent of receptacles in open and enclosed offices must be controlled by occupancy sensors (off when unoccupied)

  • HVAC interlock — Where applicable, receptacle circuits may need to interlock with HVAC shutdown
  • Metering — Sub-metering for tenant spaces over 25,000 ft² per ASHRAE 90.1
  • Exam Scenario

On the IDIX exam, expect questions that give a furniture plan and ask where a floor box or poke-through should be placed, or whether a given receptacle height complies with ADA reach ranges. Remember: the NEC governs spacing, ADA governs height, and the designer coordinates both against the furniture and millwork layout.

Key Mounting Heights for Electrical Devices (inches AFF)