14.4 Contracts & Procurement: Managing Proposals & Contracts

NCIDQ Interior Design Qualification Exam

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Exam Overview

1.1 About the NCIDQ Exam 1.2 Eligibility & Application Routes 1.3 Test-Taking Strategies & Item Types 1.4 The 2026 NCIDQ Blueprint Overview

2 Study Planning, Codes & Logistics

2.1 Building a Study Plan 2.2 Codes & Reference Standards Overview 2.3 Fees, Schedule & Logistics

3 IDFX: Existing Conditions

3.1 Existing Conditions: Initial Code Analysis 3.2 Existing Conditions: Evaluating the Building

4 IDFX: Pre-Design

4.1 Pre-Design: Site Analysis 4.2 Pre-Design: Best Practices of Design 4.3 Pre-Design: Project Research & Development 4.4 Pre-Design: Determining Design Intent

5 IDFX: Programming

5.1 Programming: Validating the Project Program 5.2 Programming: Programmatic Diagrams 5.3 Programming: Determining User Needs

6 IDFX: Space Planning & Preliminary FF&E

6.1 Space Planning: Completing Space Plans 6.2 Space Planning: Creating Initial Drawings 6.3 Preliminary FF&E: Identifying Finish Materials 6.4 Preliminary FF&E: Identifying Significant FF&E

7 IDFX: Schematics

7.1 Schematics: Refining Design Intent 7.2 Schematics: Performing Code Review 7.3 Schematics: Visualizing Design

8 IDIX: Codes & Life Safety

8.1 Codes & Life Safety: Performing Code Review 8.2 Codes & Life Safety: Life Safety & Occupancy Plan

9 IDIX: Integration & FF&E

9.1 Integration: Integrating Equipment & Building Systems 9.2 Integration: Developing Finish Plan & Specifications 9.3 Integration: Developing Furniture Plans & Specifications

10 IDIX: Construction Documents

10.1 Construction Documents: Details & Sections 10.2 Construction Documents: Elevations 10.3 Construction Documents: Demolition Plans 10.4 Construction Documents: Construction Plans

11 IDIX: RCP & Consultant Coordination

11.1 Construction Documents: Reflected Ceiling Plans 11.2 Consultant Coordination: Coordinating Consultant Drawings & Specs 11.3 Consultant Coordination: Power, Data & Communication Plans 11.4 Consultant Coordination: Signage & Wayfinding

12 IDIX: Construction Specifications & Schedules

12.1 Construction Specifications & Schedules: Developing Construction Specifications 12.2 Construction Specifications & Schedules: Developing Schedules

13 IDPX: Feasibility Studies

13.1 Feasibility Studies: Identifying Project Stakeholders 13.2 Feasibility Studies: Managing the Project Team 13.3 Feasibility Studies: Evaluating Project Feasibility & Due Diligence

14 IDPX: Scheduling, Budgeting & Contracts

14.1 Scheduling & Budgeting: Managing the Project Schedule 14.2 Scheduling & Budgeting: Managing the Project Budget 14.3 Contracts & Procurement: Facilitating the Procurement/Bid Process 14.4 Contracts & Procurement: Managing Proposals & Contracts

15 IDPX: Approvals, Permitting & Construction Process

15.1 Approvals & Permitting: Obtaining Project Approvals 15.2 Approvals & Permitting: Participating in the Permit Process 15.3 Construction Process: Facilitating the Construction Process 15.4 Construction Process: Participating in Change Management

16 IDPX: Site Observation & Project Close-Out

16.1 Project Closeout & Evaluation: Performing Site Visits 16.2 Project Closeout & Evaluation: Conducting Project Close-Out

17 Final Review: Synthesizing the NCIDQ & Exam-Day Readiness

17.1 Synthesizing the Three Sections 17.2 Common Pitfalls & High-Yield Topics 17.3 Exam-Day Readiness & Final-Week Plan

14.4 Contracts & Procurement: Managing Proposals & Contracts

Key Takeaways Explain This Topic AI

AIA B101 is the owner-architect (and owner-interior-designer) agreement; AIA A101 is the owner-construction contract; consultant and FF&E agreements are separate instruments

Common fee structures are fixed lump sum, hourly (time and materials), percentage of construction cost, and cost-plus; each carries a different risk allocation

Exclusions and additional services define what is NOT in the scope and billable if needed — the designer should list them explicitly to avoid scope creep

RFP solicits proposals based on scope; RFQ solicits qualifications before scope is defined

Billing methods (time-based, lump sum by milestone, percentage of completion) must match the fee structure to avoid disputes

Last updated: August 2026

Why Contracts and Proposals Matter

The proposal and contract define what the designer is paid to do, what is explicitly excluded, and how the work will be billed. The IDPX tests the candidate's ability to pick the right fee structure, scope the phases correctly, and recognize the standard AIA agreements that govern owner-designer and owner-construction relationships.

Fee Structures

Four fee structures dominate interior design practice:

  • Structure How It Works Risk Holder Best When
  • Fixed lump sum One price for a defined scope Designer holds overrun risk Scope is well defined
  • Hourly (T&M) Time and materials at stated rates Owner holds cost risk Scope is undefined or volatile

Percentage of construction cost Fee as a % of the constructed cost Owner (cost grows) / designer (cost shrinks) Full-service, traditional projects

Cost-plus Actual cost plus a fixed fee or % Owner holds cost risk Open scope, fast-track work

A not-to-exceed proposal caps a T&M or cost-plus engagement at a stated ceiling, giving the owner cost certainty while letting the designer bill actuals below the cap. A stipulated sum is the AIA term for a fixed lump sum.

Proposal Types

A proposal is the designer's offer to perform a scope for a fee. Common forms:

Lump-sum proposal — single price for a defined scope; over-runs are the designer's loss, under-runs the designer's gain.

Time and materials (T&M) proposal — hourly rates and material markups with a not-to-exceed cap optional.

Not-to-exceed proposal — T&M with a hard ceiling; useful when the owner wants cost certainty but scope is uncertain.

The proposal must state the scope of services , the fee structure , the exclusions , and the billing schedule .

RFP vs RFQ

Request for Proposal (RFP) — solicits proposals based on a defined scope; respondents price the work and propose an approach.

Request for Qualifications (RFQ) — solicits qualifications before scope is defined; respondents submit experience, team, and references. The owner shortlists and may then issue an RFP to the shortlist.

Public projects often require an RFQ first for legal compliance; private owners can move directly to an RFP.

Scope of Services by Phase

The AIA B101 defines the architect's (and by extension the interior designer's) scope as a sequence of phases. Each phase is a milestone for billing and for additional-services triggers:

Schematic Design (SD) — concept, space planning, preliminary finishes, preliminary budget.

Design Development (DD) — refine the design, finalize finishes, FF&E selection, pricing.

Construction Documents (CDs) — drawings and specifications for bid and permit.

Bidding / Negotiation — answer bidder questions, evaluate alternates, recommend award.

Construction Administration (CA) — site visits, RFIs, submittals, change orders, punch list, closeout.

FF&E — selection, procurement, PO management, installation, and warranty (often a separate agreement).

Exclusions and Additional Services

Exclusions are items the designer explicitly does NOT provide in the base fee: survey, geotechnical, hazardous-material testing, code review by a specialty consultant, and post-occupancy move management are common exclusions. Listing them protects the designer from scope creep and gives the owner a clear list of additional contracts to procure.

Additional services are excluded items that the owner later requests; they are billable at the contract's additional-services rate. Triggering examples include major redesign after DD approval, owner-directed changes, and extended CA beyond the contract duration.

Types of Agreements

  • Agreement Parties Typical Use
  • AIA B101 Owner–Architect (or Owner–Interior Designer) Standard owner-designer professional services agreement
  • AIA A101 Owner–Contractor Standard construction contract (stipulated sum)
  • AIA A201 General Conditions Incorporated into A101; sets the rules of construction

Architect–Consultant Agreement Designer–Consultant (structural, MEP, lighting) Designer subcontracts specialists

  • FF&E Agreement Owner–Designer or Owner–Dealer Furniture, fixtures, and equipment procurement
  • Leasing Agreement Owner–Lessor Furniture and equipment leased rather than purchased

A professional services agreement (PSA) is the umbrella term for the B101-style contract. A construction contract is the A101-style instrument. Interior designers most often operate under the B101 (or a PSA based on it) plus a separate FF&E agreement.

Accounting and Billing Practices

Billing must match the fee structure to avoid disputes:

Time-based billing — invoiced against hours logged; used with hourly/T&M fees.

Lump-sum by milestone — invoiced at phase completion (SD, DD, CDs, CA); used with stipulated-sum fees.

Percentage of completion — invoiced against earned value; used with percentage-of-construction or cost-plus fees.

A common dispute pattern is billing a lump-sum fee hourly. The owner expects the lump sum to be a cap; the designer expects to bill hours. The contract should state which governs. Progress billing ties invoices to completed milestones or to a schedule of values; it is the standard for construction-phase billing under A101/A201.

Exam Scenario

An owner requests a full redesign of the lobby after DD has been approved and CDs are underway. The redesign was not in the original scope. Because the original B101 listed major redesign after DD approval as an additional service, the designer bills the redesign at the additional-services rate rather than absorbing it within the lump-sum CD phase.

Risk Allocation: 3 = designer holds most risk, 1 = owner holds most risk