Study guide
11.2 Balancing Valves, Circuit Setters, Strainers, and Hydronic Procedures
NEBB Testing, Adjusting and Balancing Certified Technician CT
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Role, Documents, and Readiness
1.1 NEBB TAB CT Role, CP Guidance, Standards, and Data Integrity 1.2 Interpreting Plans, Schedules, and Control Sequences 1.3 Field Verification, Pre-TAB Readiness, and Deficiencies
2 Chapter 2: TAB Math and Heat Transfer
2.1 TAB Mathematics, Units, Ratios, and Formula Discipline 2.2 Air-Side Sensible, Latent, and Total Heat Transfer 2.3 Hydronic Heat Transfer, Glycol Corrections, and Coil Cross-Checks
3 Chapter 3: Psychrometrics
3.1 Psychrometric Properties and Reading the Chart 3.2 Psychrometric Processes, Air Mixing, and Coil Diagnostics
4 Chapter 4: TAB Instrumentation and Measurement Quality
4.1 Pressure Instruments, Manometers, Zeroing, and Tubing 4.2 Airflow Instruments: Hoods, Anemometers, and Pitot Tubes 4.3 Hydronic Pressure and Temperature Instruments 4.4 Electrical and Rotational Instruments
5 Chapter 5: Air Systems and Airflow Fundamentals
5.1 Air-System Configurations and System Relationships 5.2 Airflow Continuity, Standard Air, Density, and Velocity 5.3 Duct Geometry and Worked Airflow Calculations
6 Chapter 6: Duct Traverses
6.1 Traverse Locations, Disturbances, and Point Layout 6.2 Traverse Velocity Conversion and Airflow Calculation
7 Chapter 7: Terminal Measurements and Air Balancing
7.1 Terminal Devices, Effective Area, and Capture-Hood Checks 7.2 Proportional Air Balancing and Final Verification 7.3 Outside Air, Exhaust Balancing, and Building Pressurization
8 Chapter 8: Fans, Motors, and Drives
8.1 Fan Types, Performance Curves, and Rotation 8.2 Fan Affinity Laws, Pressure, and Power 8.3 Motors, Single- and Three-Phase Measurements, and Loading 8.4 Belts, Sheaves, Alignment, and Variable Frequency Drives
9 Chapter 9: HVAC Controls and VAV Systems
9.1 HVAC Control Fundamentals, Signals, and Test States 9.2 VAV Terminal Types, Airflow Sensors, and Calibration 9.3 VAV System Balancing, Diversity, and Static-Pressure Control
10 Chapter 10: Hydronic System Fundamentals
10.1 Hydronic Pressure, Head, Open and Closed Systems, and Resistance 10.2 Expansion Tanks, Point of No Pressure Change, and Fill Pressure
11 Chapter 11: Pumps and Hydronic Balancing
11.1 Centrifugal Pumps, Pump Curves, and Pump Affinity Laws 11.2 Balancing Valves, Circuit Setters, Strainers, and Hydronic Procedures
12 Chapter 12: Reporting, Safety, and Problem Solving
12.1 Project Acceptance Criteria, Data Traceability, and Certified Reports 12.2 Field Safety, Electrical Boundaries, Pressure, and Access 12.3 Integrated TAB Problem Solving and Measurement Cross-Checks
11.2 Balancing Valves, Circuit Setters, Strainers, and Hydronic Procedures
Key Takeaways Explain This Topic AI
Use exact device data, setting, fluid, and differential pressure.
Evaluate strainers against comparable-flow baselines or manufacturer data.
Under a specified proportional method, the lowest ratio is the initial index.
Proportional agreement does not by itself prove design total flow.
Last updated: August 2026
- Hydronic Devices and Proportional Balancing
- Know the measuring device
A calibrated balancing valve relates differential pressure and valve setting to flow through manufacturer data. A fixed venturi or orifice uses its own published relationship. For water, a simple valve coefficient relationship is:
GPM = Cv × square root of differential pressure in psi
This equation is valid only when the stated Cv applies to the installed valve and setting and fluid corrections are handled. For Cv 14.5 and 3.24 psi, flow is 14.5 × 1.8 = 26.1 GPM.
Connect the differential meter to the correct high and low ports, select a safe range, purge air from wet hoses, and account for elevation if the columns differ. Observe pressure rating and line-of-fire hazards at test plugs. Compare the result with the manufacturer curve rather than a generic look-alike valve.
Strainers and restrictions
Pressure drop through a strainer varies approximately with flow squared and depends on model, size, screen, and fluid. There is no universal clean-strainer threshold of 1 or 2 psi. Establish the expected or clean baseline from manufacturer data, commissioning records, or comparable-flow measurements. A reading materially above that baseline suggests fouling or another restriction.
Document the condition and have authorized personnel isolate, inspect, or clean the device under the project procedure before final balancing. The CT should not open a pressurized strainer, operate a blowdown into an unsafe location, or assume every high differential is debris.
Valve categories
Manual balance valves create an adjustable resistance and retain a recorded setting. Automatic flow-control devices regulate within a specified differential-pressure range. A pressure-independent control valve combines control and differential-pressure regulation, but it still requires correct selection, preset, available pressure, actuator command, and final verification. Outside its operating range it cannot maintain the intended flow.
Before a design-flow test, place control valves and bypasses in the mode required by the approved sequence. A two-way valve may need a full-cooling or full-heating command; a three-way valve must be evaluated with its actual mixing or diverting arrangement. Do not assume that every valve should simply be driven 100% open in every test.
Proportional method
When the project procedure calls for proportional balancing, begin with all relevant manual balancing valves open and the system in a stable design condition. Measure every circuit and calculate actual flow divided by design flow. The circuit with the lowest ratio is the index for that group. Leave its balance valve open under this method and throttle higher-ratio circuits in an organized sequence until their ratios agree within the project criterion.
Example: four circuits measure 115%, 92%, 68%, and 104% of design. The 68% circuit is the initial index. As other valves are adjusted, remeasure the index because its flow changes. Work through terminals, branches, risers, and mains according to system topology rather than assuming the physically farthest coil is always the index.
Proportional agreement does not guarantee design flow. If all circuits settle near 80%, distribution may be proportional while total pump output is inadequate. Diagnose pump speed and curve, valve lineup, air, strainers, control state, available differential pressure, and system resistance. Any pump speed or impeller change requires authorization and a repeat check of power, NPSH, equipment limits, and the full distribution.
Final verification
After balancing, record device tag, design and measured GPM, differential pressure, valve setting, manufacturer data used, fluid and temperature, pump speed, control mode, and unresolved deficiency. Recheck critical and index circuits after upstream adjustments. Mark or lock final settings only as the project permits.
Restore automatic controls and test representative part-load operation. A manual balance that works only while all control valves are overridden is incomplete. The final report should distinguish measured facts from recommended corrective work and apply the acceptance criterion stated in the contract documents—not a blanket ±10% rule.
Branch-to-system progression
Balance the smallest logical groups first, then compare branches, risers, and mains under the selected procedure. Recheck completed groups after an upstream valve or pump change because their available differential has changed. Record the final index for each group; it may not be the device that was initially lowest.
Use percent of design only to compare proportional relationships. Report actual GPM as well. A circuit at 100% can still be measured incorrectly if the wrong valve curve, setting, fluid correction, or hose connection was used. Conversely, a correctly measured circuit outside the project criterion remains a real deficiency rather than a number to be adjusted on paper.
Before accepting a final circuit flow, verify:
- exact valve or flow-device identification and setting;
- correct high/low connections, purge, zero, fluid, and units;
- stable pump and control-valve operating mode; and
a final recheck after upstream and total-flow adjustments.