12.4 Emergency Management: Disaster Types & the Four Phases
NENA Emergency Number Professional ENP
Track your progress as you read
Finished sections get a check mark.
1 Introduction
About the NENA ENP Exam
2 Chapter 1: 9-1-1 Evolution & Legacy Network Architecture
1.1 Evolution of 9-1-1 & Central Office Tandem Architecture 1.2 Legacy Location Infrastructure: MSAG, ANI, ALI & ESN/ESZ 1.3 Legacy Network Signaling: CAMA, SS7 & Selective Routing 1.4 Network Design: Originating Service Providers, Local Loops & Transport Facilities 1.5 Signaling, Transport Protocols & Transmission Systems 1.6 Types and Features of 9-1-1 Systems: Basic, Enhanced & NG9-1-1
3 Chapter 2: Modern Location Technologies & MLTS
2.1 Wireless 9-1-1: Phase I, Phase II & Location Accuracy 2.2 Device-Based Location, Supplemental Data & RapidSOS 2.3 MLTS Compliance: Kari's Law & RAY BAUM'S Act
4 Chapter 3: NG911 i3 Core Network & Security
3.1 NG911 Architecture: The ESInet & Core Services 3.2 Border Control Function (BCF) & Security Edge 3.3 SIP Signaling in NG911 (RFC 3261) & Emergency Call Flow
5 Chapter 4: NG911 Location Services & Call Routing
4.1 Location Information Server (LIS) & PIDF-LO 4.2 Emergency Call Routing Function (ECRF) & LoST 4.3 Location Validation Function (LVF) & Legacy Gateways 4.4 NG9-1-1 PSAPs, EIDO, Additional Data & Transitional Elements
6 Chapter 5: Public Safety Radio, Broadband & FirstNet
5.1 Land Mobile Radio (LMR) Architecture & P25 Standards 5.2 Conventional vs. Trunked Radio Systems & Frequency Bands 5.3 Public Safety Broadband, FirstNet & Mission-Critical Services
7 Chapter 6: Call Processing, Accessibility & Protocol Systems
6.1 Call Answering Standards & Answering Point Workflows 6.2 Accessibility: TTY/TDD, Text-to-911 & Real-Time Text (RTT) 6.3 Emergency Protocol Systems & Medical Direction 6.4 PSAP Types & 9-1-1 Call Handling Equipment
8 Chapter 7: Computer Aided Dispatch & Information Systems
7.1 Computer Aided Dispatch (CAD) System Architecture 7.2 CAD Interfaces: Mobile Data, RMS & External Telematics 7.3 Logging Recorders & Synchronized Master Clocks 7.4 Non-Voice Communications & Information Networks 7.5 NENA Standards & Other Documents
9 Chapter 8: GIS for Next Generation 9-1-1
8.1 NG911 GIS Data Layers: Road Centerlines & Address Points 8.2 Boundary Polygons: PSAP, Law, Fire & EMS Jurisdictions 8.3 GIS Data Quality, Topology & Provisioning Workflows 8.4 9-1-1 Databases: Service Orders, ALI & Routing Records, Number Portability & Database Management
10 Chapter 9: Cybersecurity & CJIS Compliance
9.1 PSAP Cybersecurity Frameworks: NENA NG-SEC & NIST CSF 9.2 CJIS Security Policy: Access Control, MFA & Encryption 9.3 TDoS, Ransomware & Cyber Incident Response Planning
11 Chapter 10: Telecommunications Policy, Funding & Civil Rights
10.1 Regulatory Governance: FCC Authority & Part 9 Orders 10.2 9-1-1 Surcharges, Fee Diversion & Federal Grant Programs 10.3 Civil Rights & Language Access: Title VI & ADA Title II 10.4 Telecommunications Service Priority, Public Utility Commissions & the Canadian Framework 10.5 Special Legislative Areas: Alarms, Mass Notification, Pipelines & Other 9-1-1 Laws
12 Chapter 11: PSAP Governance, Strategy & Facility Design
11.1 PSAP Governance Models: Standalone, Co-Located & Consolidated 11.2 Strategic Planning & Performance Management 11.3 PSAP Facility Architecture, Physical Security & Ergonomics 11.4 Management Decision Making & Short-Range, Long-Range & Strategic Planning
13 Chapter 12: Power Redundancy, COOP & Disaster Recovery
12.1 Electrical Power Redundancy: UPS Systems & Generator Sets 12.2 Continuity of Operations Planning (COOP) & Alternate Facilities 12.3 Disaster Recovery, Redundant Connectivity & Evacuation 12.4 Emergency Management: Disaster Types & the Four Phases
14 Chapter 13: Emergency Incident Management & NIMS/ICS
13.1 National Incident Management System (NIMS) & ICS Architecture 13.2 Emergency Operations Centers (EOC) & Incident Command Interfaces 13.3 Mutual Aid & Interagency Interoperability: MACS & MABAS
15 Chapter 14: Procurement, Contracts & Financial Management
14.1 Capital Budgeting, Operational Expense & Financial Auditing 14.2 Public Procurement: RFPs, RFQs & Bid Evaluations 14.3 Vendor Contracting: MSAs, SLAs & Life-Cycle Management
16 Chapter 15: Staffing Models, Scheduling & Wellness
15.1 PSAP Staffing Models: Erlang C & NENA Staffing Calculator 15.2 Shift Scheduling Models, Overtime & Fatigue Mitigation 15.3 Telecommunicator Wellness: CISM, Peer Support & PTSD
17 Chapter 16: Training, CTO Coaching & Quality Assurance
16.1 Adult Learning & Communications Training Officer (CTO) Models 16.2 Quality Assurance & Continuous Quality Improvement (APCO/NENA ANS 1.107) 16.3 Continuing Education, Certifications & Professional Pathways 16.4 Performance Management, Employee Feedback & Customer Service
18 Chapter 17: Employee Relations, Labor Standards & Legal Protections
17.1 Fair Labor Standards Act (FLSA) & Dispatcher Overtime Rules 17.2 EEO, Title VII, FMLA & ADA in the PSAP Workplace 17.3 Progressive Discipline, Just Cause & Union Negotiations 17.4 Employee Relations, Employment Rights & Labor-Management Relations 17.5 Employment Laws: ADEA, Pregnancy Protections, Uniform Guidelines, OSH Act & Canadian Law 17.6 Compensation Laws: Equal Pay Act, COBRA, Social Security Act & Affordable Care Act
19 Chapter 18: Records Governance, Liability & Public Relations
18.1 Public Records, FOIA & Recording Retention Schedules 18.2 Legal Liability, Tort Claims Acts & Immunity Doctrines 18.3 Public Relations, Media Inquiries & Community Outreach
20 Chapter 19: Recruiting, Hiring, Compensation & Retention
19.1 Recruiting: Workforce Needs, Outreach & Sourcing 19.2 Hiring Procedures: Testing, Interview Panels, Agency Tours & Background Checks 19.3 Compensation & Benefits: Job Analysis, Pay Structures & Medical Benefits 19.4 Employee Retention & Succession Planning
12.4 Emergency Management: Disaster Types & the Four Phases
Key Takeaways Explain This Topic AI
The ENP Body of Knowledge groups disasters affecting 9-1-1 into localized, regional or national, PSAP-only, and network or transport facility events, each with different impacts and strategies.
Emergency management is commonly organized into four phases: mitigation, preparedness, response, and recovery, while the National Preparedness Goal uses five mission areas (prevention, protection, mitigation, response, and recovery).
Mitigation reduces risk before events through resource management, interagency cooperation, security, and hazard mitigation planning; local hazard mitigation plans are updated every five years to keep FEMA mitigation grant eligibility.
Preparedness for PSAPs covers redundancy, relocation and backup sites, mutual aid agreements, housing, health, testing, training, employee and family notification plans, and supplies, validated through exercises.
Response addresses transportation of staff and equipment, food, water, and sanitation, procedures, NIMS, and TERT, while recovery restores facilities and services, reconciles records, documents costs, and completes after-action improvement plans.
Last updated: September 2026
12.4 Emergency Management: Disaster Types & the Four Phases
Quick Answer: Disasters that affect 9-1-1 fall into four types: localized events in one community, regional or national events that also strain mutual aid partners, PSAP-only events that disable the center while the community is otherwise normal, and network or transport facility events that stop calls from reaching an intact PSAP. Emergency management is organized into four phases. Mitigation reduces risk before an event, preparedness builds the capability to respond, response protects life and maintains service during the event, and recovery restores facilities and services afterward. Each phase has concrete PSAP tasks, from diverse routes and backup sites to TERT requests, cost documentation, and after-action plans.
1. Types of Disasters Affecting 9-1-1
Disaster Type Examples Impact on the PSAP Key Strategies
Localized Tornado, building collapse, hazmat release, major fire in one community Call surges concentrated in one area; field resources overwhelmed Surge staffing, call prioritization, mutual aid from unaffected neighbors
Regional or national Hurricanes, earthquakes, large wildfires, pandemics, widespread cyberattacks Long duration; neighbors and suppliers also affected; staff and families directly impacted Long-term staffing plans, TERT, pre-stocked supplies, housing for staff
PSAP-only Building fire, HVAC or power failure, bomb threat evacuation, ransomware on CAD The community needs normal service, but the center cannot operate Alternate PSAP, COOP activation, manual fallback procedures (12.2 and 9.3)
Network or transport facility Carrier fiber cut, selective router or NGCS outage, TDoS attack The PSAP is intact but calls cannot reach it Diverse routes, alternate routing, carrier notifications, public messaging about alternate numbers
- 2. The Four Phases of Emergency Management ┌──────────────┐ ┌──────────────┐
- │ MITIGATION │ ─────► │ PREPAREDNESS │
- │ Reduce risk │ │ Build ability│
- └──────▲───────┘ └──────┬───────┘
- │ │
- ┌──────┴───────┐ ┌──────▼───────┐
- │ RECOVERY │ ◄───── │ RESPONSE │
- │ Restore │ │ Act during │
- └──────────────┘ └──────────────┘
The phases form a cycle: lessons from recovery feed new mitigation and preparedness work. The National Preparedness Goal under Presidential Policy Directive 8 uses five mission areas (prevention, protection, mitigation, response, and recovery), but the four-phase model remains the common way to organize PSAP emergency planning.
3. Mitigation
Mitigation reduces the likelihood or impact of disasters before they occur.
BOK Mitigation Topic PSAP Actions
Resource management Maintain inventories of equipment, radios, and spare parts; replace aging systems on schedule; track vendor support end dates
Interagency cooperation Sign memoranda of understanding with neighboring PSAPs, emergency management, utilities, and carriers before they are needed
- Security Harden physical access, segment networks, and apply cybersecurity controls (9.1 and 11.3)
- Hazard Mitigation Planning
Local governments prepare hazard mitigation plans that assess risks and list mitigation projects. Under the Disaster Mitigation Act of 2000, local plans must be reviewed and updated every five years to remain eligible for FEMA hazard mitigation grants.
PSAPs should make sure 9-1-1 facilities and networks appear in the plan, so projects such as generator upgrades, flood protection, or diverse fiber routes can compete for mitigation funding.
Examples of 9-1-1 mitigation: elevating generators and switchgear above flood levels, adding diverse network routes, installing surge protection, and moving servers out of basements.
4. Preparedness
Preparedness builds the capability to respond. The Body of Knowledge lists these preparedness elements:
Element What It Means for a PSAP
Redundancy Backup power, duplicate network paths, spare consoles, and hosted or mirrored systems (12.1 and 12.3)
Relocation and backup site A tested alternate PSAP or mobile unit, with procedures to move staff and operations (12.2)
- Mutual aid agreements Agreements for call rollover, staff sharing, and TERT support (13.3)
- Housing Arrangements for staff to sleep near the center during extended events (cots, hotels, dormitory space)
- Health Medications, first aid, sanitation, and wellness and peer support for extended operations (15.3)
- Testing Scheduled tests of generators, alternate routing, backup sites, and notification systems
- Training Disaster procedures, manual fallback operations, NIMS courses, and cross-training
Notification plans for employees and families Callback rosters, check-in procedures, and family preparedness support so staff can report to work
Supplies Food, water, fuel, batteries, paper forms, and personal protective equipment for at least several days
Exercises
Many agencies follow the Homeland Security Exercise and Evaluation Program (HSEEP) :
Discussion-based exercises: seminars, workshops, tabletop exercises, and games that test plans and decisions.
Operations-based exercises: drills, functional exercises, and full-scale exercises that test actual performance.
Each exercise should produce an after-action report and improvement plan.
5. Response
Response protects life and keeps 9-1-1 working during the event.
BOK Response Topic PSAP Actions
Transportation of employees and equipment Arrange rides for staff in severe weather, stage vehicles, and move equipment to backup sites
Food, water, and toilets Provide meals, drinking water, and sanitation for extended shifts, especially if utilities fail
Procedures and policies Activate surge procedures, call prioritization, recorded messages on administrative lines, and extended shift rules
National Incident Management System (NIMS) Integrate with incident command, EOCs, and joint information centers (Chapter 13)
Telecommunicator Emergency Response Taskforce (TERT) Request relief telecommunicators through state TERT programs and EMAC (13.3)
Response also includes public information: coordinating with the PIO to tell residents when to call 9-1-1, when to use non-emergency lines, and what alternate numbers to use during network outages.
6. Recovery
Recovery restores normal operations and captures lessons.
- BOK Recovery Topic PSAP Actions
- Facilities Assess damage, make repairs, clean and test systems, and plan the return from the alternate site
Restoration of services Confirm carrier repairs, test 9-1-1 trunks and NGCS routing, verify ALI and GIS data, and restore normal staffing
Other Recovery Tasks
Records reconciliation: Enter incidents handled on paper cards during outages back into CAD, and document gaps in recordings.
Cost documentation: Track overtime, contracted services, and damaged equipment. Under the Stafford Act, FEMA Public Assistance can reimburse eligible costs after a declared disaster, but only with thorough documentation.
After-action review: Complete an after-action report and improvement plan that assigns corrective actions, owners, and due dates.
Staff care: Offer critical incident stress management and time off, since employees may have faced personal losses (15.3).
7. Operational Traps & ENP Exam Watch
PSAP-Only vs. Network Disasters: A PSAP-only disaster disables the center; a network disaster stops calls from reaching a working center.
Mitigation vs. Preparedness: Mitigation reduces the hazard's impact (such as elevating generators); preparedness builds response capability (such as training and supplies).
Four Phases vs. Five Mission Areas: The four phases are mitigation, preparedness, response, and recovery; the National Preparedness Goal adds prevention and protection as separate mission areas.
Document for Reimbursement: Recovery funding depends on cost records kept during response.
Families Matter: Employee and family notification and support plans determine whether staff can report during regional disasters.