1 Introduction & Exam Overview
1.1 About the NETA Level 2 Exam 1.2 The NETA Certification Hierarchy & Eligibility 1.3 Exam Administration, Scoring & Scheduling 1.4 Study Plan & How to Use This Guide
2 Chapter 1: Electrical Safety
2.1 NFPA 70E Approach Boundaries & Arc-Flash 2.2 PPE, Rubber Glove Classes & Hearing Protection 2.3 LOTO & the Electrically Safe Work Condition 2.4 Energized Work Permits & Live-Dead-Live 2.5 Temporary Protective Grounds & Induced Voltage 2.6 Hipot Testing Safety & Post-Hipot Grounding 2.7 Confined Space & General Electrical Safety 2.8 Risk Assessment, Job Briefings & the Hierarchy of Risk Controls 2.9 Codes & Standards: NFPA 70 Key Provisions and the ANSI/NETA Specifications
3 Chapter 2: Power Systems Theory
3.1 Three-Phase Power & Wye/Delta Relationships 3.2 Power Factor, Voltage Unbalance & Negative Sequence 3.3 Symmetrical Components & Fault-Current Paths 3.4 Grounding Systems & Impedance Grounding 3.5 Insulation Degradation & Dielectric Theory 3.6 Electrical Calculations, Units & Conversions
4 Chapter 3: Protection & Device Fundamentals
4.1 ANSI Device Numbers (27, 50, 51, 59, 86, 87) 4.2 IDMT/TCC Curves & Coordination 4.3 CT Theory: Ratio, Polarity, Burden, Accuracy & Knee Point 4.4 PT/VT Fundamentals & Insulation Coordination 4.5 Motor Circuits: FLA, PF Correction & Current Imbalance 4.6 One-Lines, Three-Lines, Schematics & Electrical Symbols 4.7 Short-Circuit & Coordination Studies
5 Chapter 4: Insulation Resistance Testing
5.1 Insulation Resistance: Test Voltages & IEEE 43 Minimums 5.2 Polarization Index (PI) & Dielectric Absorption Ratio (DAR) 5.3 Overpotential vs IR & Cable Hipot Basics 5.4 Guard Terminal, Doble Test Set & Thermography
6 Chapter 5: Withstand & Power-Factor Testing
6.1 DC Hipot: Step Voltage, Leakage Current & Pass Criteria 6.2 VLF Cable Testing & the DC/AC Voltage Conversion 6.3 Bushing Power Factor & Transformer PF Configurations 6.4 Oil Dielectric (ASTM) & DGA Sampling 6.5 Cable Fault Locating
7 Chapter 6: Transformer Testing
7.1 Transformer Turns Ratio (TTR) & Acceptance 7.2 Winding Resistance & Transformer Polarity 7.3 Transformer IR Configurations & Neutral-Ground Bond 7.4 SFRA, Sudden-Pressure Relay & Dry-Transformer ATS Tests
8 Chapter 7: CT, Relay & Motor Testing
8.1 CT Ratio, Polarity & Saturation Testing 8.2 Primary vs Secondary Injection & Relay Pickup 8.3 Three-Phase Relay Test Set, Phase-Angle Meter & Induction Disc 8.4 Motor Surge Test & Current Imbalance 8.5 Adjustable-Speed Drives, Reclosers, Sectionalizers & Fiber-Optic Cables
9 Chapter 8: Switchgear & Breaker Testing
9.1 Contact Resistance (Ductor) & Torque Verification 9.2 Vacuum Bottle Integrity & VCB Maintenance Tests 9.3 Post-Fault Breaker Maintenance & LV Trip-Unit Settings 9.4 Switchgear Bus IR, MCC Inspection & Bonding Jumpers 9.5 Switches, Circuit Switchers & Network Protectors 9.6 Metal-Enclosed Busways & Outdoor Bus Structures
10 Chapter 9: Grounding, Batteries & Protective Devices
10.1 Ground-Electrode Testing: Fall-of-Potential & Clamp-On 10.2 Battery Load Test (IEEE 450), VRLA Ohmic & Intervals 10.3 Fuses, GFCI & Zero-Sequence CT Grounding 10.4 Surge Arrester Acceptance & SPD Verification 10.5 Metering Devices & Regulating Apparatus 10.6 Capacitor Banks & Reactors: Inspection, Testing & Acceptance
11 Chapter 10: Systems & Commissioning
11.1 Automatic Transfer Switch Functional Testing 11.2 NFPA 110 Emergency System Load Tests 11.3 Switchgear Functional Testing & Feeder Trip Troubleshooting 11.4 Generator Paralleling & Emergency System Commissioning 11.5 As-Found / As-Left Documentation 11.6 Restoration & Handover Workflow
2.9 Codes & Standards: NFPA 70 Key Provisions and the ANSI/NETA Specifications
Key Takeaways Explain This Topic AI
The NETA Level 2 DCO names OSHA, ANSI, ASTM, IEEE, NETA, NFPA, and NEMA as the standards and regulatory organizations you must be able to place.
OSHA regulations are law and are enforceable; NFPA, IEEE, ASTM, NEMA, and ANSI/NETA documents are consensus standards that become mandatory when adopted by an AHJ, a contract, or an employer program.
NEC 110.16(B) requires a permanent label on service equipment rated 1200 A or more showing nominal system voltage, available fault current, clearing time, and the label date.
NEC 230.95 requires ground-fault protection on solidly grounded wye services over 150 V to ground but not over 1000 V phase-to-phase with a service disconnect rated 1000 A or more, with a maximum setting of 1200 A and a maximum one-second delay at 3000 A.
NEC 230.95(C) requires the ground-fault protection system to be performance tested when first installed on site, with a written record of the test retained.
Last updated: August 2026
Who Writes What
The Level 2 DCO subdomain I.I asks you to "apply standards and regulatory organizations (e.g., OSHA, ANSI, ASTM, IEEE, NETA, NFPA, NEMA, etc.)." The exam does not ask you to quote documents; it asks you to know which body owns which question.
Body What it is What you use it for on a test job
OSHA US federal regulator (Department of Labor) 29 CFR 1910.147 lockout/tagout, 1910.269 generation/transmission/distribution, 1910 Subpart S electrical, 1910.146 permit-required confined space
ANSI American National Standards Institute — accredits standards developers, does not write most standards itself The "ANSI/" prefix on ANSI/NETA ATS, MTS, ECS, and ETT means the document was developed under an accredited consensus process
ASTM Materials and test-method standards Insulating oil dielectric breakdown (D877, D1816), rubber insulating gloves and blankets (D120, D1048), hot sticks
IEEE Engineering standards and recommended practices IEEE 43 (rotating machinery IR, PI, DAR), IEEE 450 (vented lead-acid battery maintenance), IEEE 1584 (arc-flash calculation), IEEE C57 series (transformers), IEEE C37 series (switchgear and relays)
NETA InterNational Electrical Testing Association ANSI/NETA ATS, MTS, ECS, and ETT — the acceptance, maintenance, commissioning, and technician-certification standards
NFPA National Fire Protection Association NFPA 70 (NEC), 70B (equipment maintenance), 70E (electrical safety in the workplace), 110 (emergency and standby power)
NEMA National Electrical Manufacturers Association Equipment ratings, enclosure types (NEMA 1, 3R, 4X, 12), motor standards (MG 1), and the NEMA enclosure-to-IEC-IP relationship
Law vs. Consensus Standard
Only OSHA regulations are federal law on their own. NFPA, IEEE, ASTM, NEMA, and ANSI/NETA documents are consensus standards — they become mandatory when an authority having jurisdiction adopts them, when a contract specifies them, or when an employer writes them into its own program. Practically, the client contract that says "test in accordance with ANSI/NETA ATS" is what makes ATS binding on your crew.
The Four ANSI/NETA Standards
Standard Full name Scope
ANSI/NETA ATS Acceptance Testing Specifications Field tests on new equipment before energization; factory-level values and tight tolerances
ANSI/NETA MTS Maintenance Testing Specifications Field tests on in-service equipment; reduced test voltages and aged-insulation acceptance values
ANSI/NETA ECS Electrical Commissioning Specifications The commissioning process — roles, documentation, and system-level verification of the installed system
ANSI/NETA ETT Standard for Certification of Electrical Testing Technicians The certification program itself: the four levels, prerequisites, and the Detailed Content Outlines
Inside ATS and MTS, every equipment section follows the same four-part structure, which is worth memorizing because it is how test procedure questions are framed:
- Visual and Mechanical Inspection
- Electrical Tests
- Test Values — Visual and Mechanical
- Test Values — Electrical
When an exam item asks "where does the acceptance criterion come from," it is asking you to distinguish part 2 (what you do) from parts 3 and 4 (what the result must be).
NFPA 70E: The Two Chapters That Matter
The DCO calls out NFPA 70E Chapter 1 and Chapter 2:
Chapter 1 — Safety-Related Work Practices. Articles 100 (definitions), 105 (application), 110 (general requirements including the electrical safety program, risk assessment, and job briefing), 120 (establishing an electrically safe work condition), 130 (work involving electrical hazards: permits, boundaries, PPE).
Chapter 2 — Safety-Related Maintenance Requirements. The chapter that says the safety of the work practices in Chapter 1 depends on equipment being maintained. This is the hook between 70E and NETA testing work: an incident-energy study assumes a breaker clears in a stated time, and Chapter 2 is why someone has to prove it still does.
NFPA 70 (NEC) Key Provisions
The DCO names specific NEC articles. You are not expected to quote them, but you must recognize what each one governs.
Article Subject What a NETA technician does with it
90 Introduction — purpose, scope, arrangement, enforcement 90.2 tells you what the Code does and does not cover; 90.5 separates mandatory rules ("shall") from permissive rules ("shall be permitted") and informational notes, which are not enforceable
110.16 Arc-flash hazard warning 110.16(A) requires field marking on equipment likely to require examination while energized. 110.16(B) requires service equipment rated 1200 A or more to carry a permanent label with the nominal system voltage, available fault current, clearing time , and the date the label was applied
110.21 Marking 110.21(A) manufacturer markings and equipment nameplates; 110.21(B) field-applied hazard markings must warn of the specific hazard, be permanently affixed, and follow ANSI Z535.4
225.56 Pre-energization and operating tests For outdoor branch circuits and feeders over 1000 V : the complete system design including protective, switching, and control-circuit settings must be prepared in advance, made available to the AHJ on request, and the system must be tested when first installed on site — the code hook for acceptance testing
230.95 Ground-fault protection of equipment Required for solidly grounded wye services over 150 V to ground but not exceeding 1000 V phase-to-phase with a service disconnect rated 1000 A or more . Maximum setting 1200 A ; maximum time delay one second for ground-fault currents of 3000 A or more
230.95(C) Performance testing The ground-fault protection system shall be performance tested when first installed on site , per approved instructions, and a written record shall be made and made available to the AHJ
250 Grounding and bonding Grounding-electrode systems, the grounded conductor vs. the equipment grounding conductor, main and system bonding jumpers, and where the neutral-to-ground bond legitimately exists
310 Conductors for general wiring Conductor types, insulation ratings, and ampacity tables — the reference behind "is this cable adequately sized for the load you just measured?"
The 480Y/277 V Service Question
The most common 230.95 exam item describes a 480Y/277 V, 2000 A service and asks whether ground-fault protection is required. Walk the three tests: solidly grounded wye (yes), more than 150 V to ground (277 V, yes) but not more than 1000 V phase-to-phase (480 V, yes), and disconnect rated 1000 A or more (2000 A, yes). All three conditions met, so GFPE is required — and under 230.95(C) it must be performance tested at installation with a written record. A 208Y/120 V service fails the second test (120 V to ground is not more than 150 V), so it is not covered by 230.95 regardless of size.
Manufacturer's Published Data Wins on Specifics
The last knowledge statement in DCO subdomain I.I is "practice compliance with manufacturer's published data." ANSI/NETA MTS and ATS repeatedly defer to the manufacturer for torque values, test voltages on unusual apparatus, timing tolerances, and leakage-current limits. When a question offers you a generic table value and a manufacturer's instruction-book value for the same parameter, the manufacturer's value governs unless it would violate a code or safety requirement.