Study guide
10.2 Battery Load Test (IEEE 450), VRLA Ohmic & Intervals
NETA ETT Level II Certified Assistant Technician Exam
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 About the NETA Level 2 Exam 1.2 The NETA Certification Hierarchy & Eligibility 1.3 Exam Administration, Scoring & Scheduling 1.4 Study Plan & How to Use This Guide
2 Chapter 1: Electrical Safety
2.1 NFPA 70E Approach Boundaries & Arc-Flash 2.2 PPE, Rubber Glove Classes & Hearing Protection 2.3 LOTO & the Electrically Safe Work Condition 2.4 Energized Work Permits & Live-Dead-Live 2.5 Temporary Protective Grounds & Induced Voltage 2.6 Hipot Testing Safety & Post-Hipot Grounding 2.7 Confined Space & General Electrical Safety 2.8 Risk Assessment, Job Briefings & the Hierarchy of Risk Controls 2.9 Codes & Standards: NFPA 70 Key Provisions and the ANSI/NETA Specifications
3 Chapter 2: Power Systems Theory
3.1 Three-Phase Power & Wye/Delta Relationships 3.2 Power Factor, Voltage Unbalance & Negative Sequence 3.3 Symmetrical Components & Fault-Current Paths 3.4 Grounding Systems & Impedance Grounding 3.5 Insulation Degradation & Dielectric Theory 3.6 Electrical Calculations, Units & Conversions
4 Chapter 3: Protection & Device Fundamentals
4.1 ANSI Device Numbers (27, 50, 51, 59, 86, 87) 4.2 IDMT/TCC Curves & Coordination 4.3 CT Theory: Ratio, Polarity, Burden, Accuracy & Knee Point 4.4 PT/VT Fundamentals & Insulation Coordination 4.5 Motor Circuits: FLA, PF Correction & Current Imbalance 4.6 One-Lines, Three-Lines, Schematics & Electrical Symbols 4.7 Short-Circuit & Coordination Studies
5 Chapter 4: Insulation Resistance Testing
5.1 Insulation Resistance: Test Voltages & IEEE 43 Minimums 5.2 Polarization Index (PI) & Dielectric Absorption Ratio (DAR) 5.3 Overpotential vs IR & Cable Hipot Basics 5.4 Guard Terminal, Doble Test Set & Thermography
6 Chapter 5: Withstand & Power-Factor Testing
6.1 DC Hipot: Step Voltage, Leakage Current & Pass Criteria 6.2 VLF Cable Testing & the DC/AC Voltage Conversion 6.3 Bushing Power Factor & Transformer PF Configurations 6.4 Oil Dielectric (ASTM) & DGA Sampling 6.5 Cable Fault Locating
7 Chapter 6: Transformer Testing
7.1 Transformer Turns Ratio (TTR) & Acceptance 7.2 Winding Resistance & Transformer Polarity 7.3 Transformer IR Configurations & Neutral-Ground Bond 7.4 SFRA, Sudden-Pressure Relay & Dry-Transformer ATS Tests
8 Chapter 7: CT, Relay & Motor Testing
8.1 CT Ratio, Polarity & Saturation Testing 8.2 Primary vs Secondary Injection & Relay Pickup 8.3 Three-Phase Relay Test Set, Phase-Angle Meter & Induction Disc 8.4 Motor Surge Test & Current Imbalance 8.5 Adjustable-Speed Drives, Reclosers, Sectionalizers & Fiber-Optic Cables
9 Chapter 8: Switchgear & Breaker Testing
9.1 Contact Resistance (Ductor) & Torque Verification 9.2 Vacuum Bottle Integrity & VCB Maintenance Tests 9.3 Post-Fault Breaker Maintenance & LV Trip-Unit Settings 9.4 Switchgear Bus IR, MCC Inspection & Bonding Jumpers 9.5 Switches, Circuit Switchers & Network Protectors 9.6 Metal-Enclosed Busways & Outdoor Bus Structures
10 Chapter 9: Grounding, Batteries & Protective Devices
10.1 Ground-Electrode Testing: Fall-of-Potential & Clamp-On 10.2 Battery Load Test (IEEE 450), VRLA Ohmic & Intervals 10.3 Fuses, GFCI & Zero-Sequence CT Grounding 10.4 Surge Arrester Acceptance & SPD Verification 10.5 Metering Devices & Regulating Apparatus 10.6 Capacitor Banks & Reactors: Inspection, Testing & Acceptance
11 Chapter 10: Systems & Commissioning
11.1 Automatic Transfer Switch Functional Testing 11.2 NFPA 110 Emergency System Load Tests 11.3 Switchgear Functional Testing & Feeder Trip Troubleshooting 11.4 Generator Paralleling & Emergency System Commissioning 11.5 As-Found / As-Left Documentation 11.6 Restoration & Handover Workflow
10.2 Battery Load Test (IEEE 450), VRLA Ohmic & Intervals
Key Takeaways Explain This Topic AI
IEEE 450 covers vented (flooded) lead-acid stationary batteries and IEEE 1188 covers VRLA; both define service tests, performance (capacity) tests, and modified performance tests.
A capacity test discharges the battery at its rated load or duty cycle and verifies it maintains minimum terminal voltage throughout; the accepted replacement threshold is 80% of rated capacity in both standards.
Internal ohmic measurement (impedance, conductance, or resistance) is a trending tool for VRLA cells, not a substitute for a load test - a 30-50% change from baseline warrants a performance test.
VRLA cells need ohmic trending because they are sealed and show no visible signs of failure (no watering, no visual plate inspection) until capacity is already lost.
Typical intervals: ohmic/impedance quarterly to monthly, service test at installation and periodically (often every 18 months), performance test at least every 25% of expected service life and annually once capacity drops below 90% or the battery reaches 85% of expected life.
Last updated: August 2026
The Two Standards You Must Know
Substation and UPS battery banks are the last line of defense when AC is lost - they power protection relays, breaker close/trip coils, and emergency lighting. Two IEEE recommended practices govern their maintenance:
IEEE 450-2020 - Vented (flooded) lead-acid (VLA) batteries for stationary applications.
IEEE 1188-2005 - Valve-regulated lead-acid (VRLA) batteries for stationary applications.
Both define three test types, the same 80% replacement threshold, and the same principle: the only proven way to determine battery capacity is a discharge (load) test . Ohmic trending supplements but never replaces load testing.
- Battery Test Types
- Service Test
A service test discharges the battery at the owner's actual duty cycle - the real combination of loads and durations the battery is expected to serve in an emergency. It verifies the battery can carry its specific station load for the required time without terminal voltage dropping below the minimum (typically 1.75 V/cell for a 60-cell 125 V DC bank, giving 105 V at the terminals). IEEE 450 recommends a service test:
At installation (acceptance).
Periodically thereafter, often every 18 months, per the owner's maintenance plan.
After any major event (extended discharge, severe overcharge, grid disturbance that taxed the bank).
Performance (Capacity) Test
A performance test is a constant-current or constant-power discharge to a defined end voltage at a defined rate, used to calculate percent of rated capacity . IEEE 450-2020 schedules it:
Within the first 2 years of service (to catch infant mortality).
At intervals not exceeding 25% of expected service life (e.g., every 4-5 years for a 20-year battery).
Annually once the battery reaches 85% of expected service life , or capacity has dropped more than 10% from the previous test, or capacity has reached 90% of rated .
Capacity is calculated by the time-adjusted method (for tests longer than 1 hour) or the rate-adjusted method (for tests shorter than 1 hour), with temperature correction applied.
Modified Performance Test
A modified performance test is a performance test run at the service-test duty cycle instead of a pure constant-current discharge. It combines capacity verification with the realistic load profile. NETA and IEEE recognize it as a valid way to satisfy both requirements in one outage.
Acceptance Criteria and the 80% Threshold
- Standard Replacement threshold Cell uniformity
- IEEE 450 (VLA) 80% of rated capacity -
- IEEE 1188 (VRLA) 80% of rated capacity Each cell >=90% capacity and within 10% of the average
Once a battery bank falls to 80% of rated capacity , both standards say replace it. For VRLA, IEEE 1188 also flags investigation when any cell drops more than 10% from the previous test or below 90% of manufacturer's rating .
VRLA Ohmic (Internal Resistance/Conductance) Trending
VRLA cells are sealed. There is no watering, no visual inspection of plates, no specific-gravity reading. A cell can lose capacity through dry-out, grid corrosion, or internal shorting without any visible sign - voltage on float may look perfectly normal until the next outage. Ohmic measurement fills that gap as an early-warning trending tool.
What Ohmic Measures
Ohmic instruments (Megger BITE, Alber Cellcorder, Midtronics) apply a small AC or pulse signal to the cell posts and measure either impedance , internal resistance , or conductance (the inverse of resistance). The reading reflects the combined contributions of grid corrosion, electrolyte dry-out, plate-to-bar welds, and internal connections.
Baseline and Trending
Take a baseline approximately 6 months after installation , once the battery is fully formed.
Use the same instrument, same method, same probe placement every time - different instruments give different absolute numbers, so only trended values from one tool are meaningful.
Probe the cell posts directly , not post hardware.
Record float voltage, charge/discharge current, and cell temperature with every measurement; ohmic values change with temperature (correct to 25 C / 77 F).
What a Change Means
A change of 30-50% from baseline (or from the string average) is generally considered significant and warrants a performance test. Manufacturer warranty claims typically require a 50% or greater deviation plus a history of at least 3 periodic readings with the same tool. Ohmic trending is a leading indicator - it moves before voltage does - but it is not a capacity measurement . A cell can have a normal ohmic reading and still fail a load test, and vice versa.
Test Intervals Summary
- Measurement Typical interval Standard reference
- Ohmic / impedance / conductance Monthly to quarterly (VRLA more frequent) IEEE 1188, IEEE 450
- Float voltage per cell Quarterly minimum IEEE 450 / 1188
- Connection resistance (intercell) Quarterly to annually IEEE 450 / 1188
- Service test (duty cycle) Installation + periodically (often 18 months) IEEE 450
- Performance (capacity) test <=25% of service life; annually after 85% life or <90% capacity IEEE 450 / 1188
- Modified performance test In lieu of separate performance + service IEEE 450
- Connection Resistance
Loose or corroded intercell connectors add resistance that drops voltage under load and can overheat during a discharge. Measure connection resistance across each intercell and intertier link with a micro-ohmmeter or Ductor at the same intervals as ohmic trending. Compare to the baseline and to adjacent connections - investigate any connection that exceeds 150% of the lowest similar reading or the manufacturer's limit. Re-torque to the manufacturer's value if out of tolerance.
Worked Example - 125 V DC Substation Bank
A 60-cell VLA bank rated 800 Ah at the 8-hour rate to 1.75 V/cell. The service test duty cycle calls for 250 A for 1 minute (breaker close), then 50 A for 8 hours. The bank must maintain at least 105 V at the terminals throughout.
After 6 years in service, a performance test at the 8-hour rate reaches the 1.75 V/cell end voltage in 6.7 hours. Time-adjusted capacity = (6.7 / 8.0) x 100 = 83.8% . That is above 80%, so the battery stays in service, but because capacity dropped more than 10% from the prior test (which was 95%), IEEE 450 requires the next performance test in 1 year , not 4 years.