Study guide
10.6 Capacitor Banks & Reactors: Inspection, Testing & Acceptance
NETA ETT Level II Certified Assistant Technician Exam
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 About the NETA Level 2 Exam 1.2 The NETA Certification Hierarchy & Eligibility 1.3 Exam Administration, Scoring & Scheduling 1.4 Study Plan & How to Use This Guide
2 Chapter 1: Electrical Safety
2.1 NFPA 70E Approach Boundaries & Arc-Flash 2.2 PPE, Rubber Glove Classes & Hearing Protection 2.3 LOTO & the Electrically Safe Work Condition 2.4 Energized Work Permits & Live-Dead-Live 2.5 Temporary Protective Grounds & Induced Voltage 2.6 Hipot Testing Safety & Post-Hipot Grounding 2.7 Confined Space & General Electrical Safety 2.8 Risk Assessment, Job Briefings & the Hierarchy of Risk Controls 2.9 Codes & Standards: NFPA 70 Key Provisions and the ANSI/NETA Specifications
3 Chapter 2: Power Systems Theory
3.1 Three-Phase Power & Wye/Delta Relationships 3.2 Power Factor, Voltage Unbalance & Negative Sequence 3.3 Symmetrical Components & Fault-Current Paths 3.4 Grounding Systems & Impedance Grounding 3.5 Insulation Degradation & Dielectric Theory 3.6 Electrical Calculations, Units & Conversions
4 Chapter 3: Protection & Device Fundamentals
4.1 ANSI Device Numbers (27, 50, 51, 59, 86, 87) 4.2 IDMT/TCC Curves & Coordination 4.3 CT Theory: Ratio, Polarity, Burden, Accuracy & Knee Point 4.4 PT/VT Fundamentals & Insulation Coordination 4.5 Motor Circuits: FLA, PF Correction & Current Imbalance 4.6 One-Lines, Three-Lines, Schematics & Electrical Symbols 4.7 Short-Circuit & Coordination Studies
5 Chapter 4: Insulation Resistance Testing
5.1 Insulation Resistance: Test Voltages & IEEE 43 Minimums 5.2 Polarization Index (PI) & Dielectric Absorption Ratio (DAR) 5.3 Overpotential vs IR & Cable Hipot Basics 5.4 Guard Terminal, Doble Test Set & Thermography
6 Chapter 5: Withstand & Power-Factor Testing
6.1 DC Hipot: Step Voltage, Leakage Current & Pass Criteria 6.2 VLF Cable Testing & the DC/AC Voltage Conversion 6.3 Bushing Power Factor & Transformer PF Configurations 6.4 Oil Dielectric (ASTM) & DGA Sampling 6.5 Cable Fault Locating
7 Chapter 6: Transformer Testing
7.1 Transformer Turns Ratio (TTR) & Acceptance 7.2 Winding Resistance & Transformer Polarity 7.3 Transformer IR Configurations & Neutral-Ground Bond 7.4 SFRA, Sudden-Pressure Relay & Dry-Transformer ATS Tests
8 Chapter 7: CT, Relay & Motor Testing
8.1 CT Ratio, Polarity & Saturation Testing 8.2 Primary vs Secondary Injection & Relay Pickup 8.3 Three-Phase Relay Test Set, Phase-Angle Meter & Induction Disc 8.4 Motor Surge Test & Current Imbalance 8.5 Adjustable-Speed Drives, Reclosers, Sectionalizers & Fiber-Optic Cables
9 Chapter 8: Switchgear & Breaker Testing
9.1 Contact Resistance (Ductor) & Torque Verification 9.2 Vacuum Bottle Integrity & VCB Maintenance Tests 9.3 Post-Fault Breaker Maintenance & LV Trip-Unit Settings 9.4 Switchgear Bus IR, MCC Inspection & Bonding Jumpers 9.5 Switches, Circuit Switchers & Network Protectors 9.6 Metal-Enclosed Busways & Outdoor Bus Structures
10 Chapter 9: Grounding, Batteries & Protective Devices
10.1 Ground-Electrode Testing: Fall-of-Potential & Clamp-On 10.2 Battery Load Test (IEEE 450), VRLA Ohmic & Intervals 10.3 Fuses, GFCI & Zero-Sequence CT Grounding 10.4 Surge Arrester Acceptance & SPD Verification 10.5 Metering Devices & Regulating Apparatus 10.6 Capacitor Banks & Reactors: Inspection, Testing & Acceptance
11 Chapter 10: Systems & Commissioning
11.1 Automatic Transfer Switch Functional Testing 11.2 NFPA 110 Emergency System Load Tests 11.3 Switchgear Functional Testing & Feeder Trip Troubleshooting 11.4 Generator Paralleling & Emergency System Commissioning 11.5 As-Found / As-Left Documentation 11.6 Restoration & Handover Workflow
10.6 Capacitor Banks & Reactors: Inspection, Testing & Acceptance
Key Takeaways Explain This Topic AI
Domain III subdomain T covers capacitors and reactors together, while NFPA 70 splits them into Article 460 (capacitors) and Article 470 (resistors and reactors).
NEC 460.6 requires a capacitor rated 1000 V and under to discharge to 50 V or less within one minute; NEC 460.28 allows five minutes for capacitors rated over 1000 V.
The automatic discharge circuit is the equipment's code-required means of discharge, never the technician's protection — test dead, then short and ground every unit before contact.
Nameplate capacitance follows from the rating as C = Q / (2 x pi x f x V^2), so each element of a 480 V delta bank carrying 50 kvar should measure about 576 uF.
Inside a capacitor unit a shorted element group makes the measured capacitance rise, so an increasing capacitance trend is a progressive-failure signature, not a healthy one.
Last updated: August 2026
Capacitors and Reactors
Domain III subdomain T is Capacitors and Reactors , and it carries the same four knowledge statements as every other component subdomain: identify properties, types, and applications; apply visual and mechanical inspections; employ methods and procedures for electrical tests; and evaluate test results. It is easy to skip in study because capacitors show up everywhere else in this guide as theory — power factor, charging current, bushing capacitance taps, drive DC buses. On the exam they also appear as apparatus under test , with their own inspection sequence, their own acceptance criteria, and a stored-energy hazard that has killed technicians who treated a de-energized bank as a dead bus.
NFPA 70 splits the two devices into separate articles: Article 460 covers capacitors and Article 470 covers resistors and reactors . ANSI/NETA ATS and MTS keep them together in a single inspection-and-test section, which is why the DCO pairs them.
Types and Applications
Device What it does Where you find it
Shunt power capacitor Supplies leading reactive power (kvar) to raise power factor and support voltage LV motor-control-center and switchgear PF banks, MV substation racks, pole-mounted utility banks
Series capacitor Cancels part of a line's inductive reactance to increase transfer capability Transmission lines
Surge capacitor Slows the rise time of an incoming surge so it does not concentrate on the first turns of a winding Motor and generator terminals, usually paired with an arrester
Filter capacitor Tuned with a reactor to a specific harmonic order Drive, arc-furnace, and rectifier installations
Current-limiting reactor Adds series impedance to hold available fault current below equipment rating Bus ties and feeders on high-fault-duty buses
Neutral grounding reactor Limits ground-fault current on a resonantly or reactance-grounded system Generator and transformer neutrals
Detuning (filter) reactor Moves a capacitor bank's resonance away from a significant harmonic In series with harmonic-filter banks
The Theory the Exam Actually Tests
The two devices are frequency mirrors of each other:
- Capacitive reactance falls with frequency: Xc = 1 / (2 x pi x f x C)
- Inductive reactance rises with frequency: XL = 2 x pi x f x L
That single contrast explains the most common capacitor-bank field problem. A plant full of variable-frequency drives is injecting 5th and 7th harmonic current. Bolt an undetuned power-factor bank onto that bus and its impedance to those harmonics is low, so it sinks harmonic current it was never sized to carry — and its capacitance in parallel with the source (transformer) inductance forms a parallel resonance that can land near a harmonic the drives are producing, amplifying the very distortion the plant was trying to live with. The cure is a detuning reactor in series with the bank, sized to place the series resonance below the lowest significant harmonic (commonly around the 4.2nd order, safely under the 5th). If you see blown capacitor fuses, bulged cans, and audible bank noise in a drive-heavy plant, harmonics — not the capacitors — are the root cause.