10.5 Metering Devices & Regulating Apparatus
NETA ETT Level II Certified Assistant Technician Exam
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 About the NETA Level 2 Exam 1.2 The NETA Certification Hierarchy & Eligibility 1.3 Exam Administration, Scoring & Scheduling 1.4 Study Plan & How to Use This Guide
2 Chapter 1: Electrical Safety
2.1 NFPA 70E Approach Boundaries & Arc-Flash 2.2 PPE, Rubber Glove Classes & Hearing Protection 2.3 LOTO & the Electrically Safe Work Condition 2.4 Energized Work Permits & Live-Dead-Live 2.5 Temporary Protective Grounds & Induced Voltage 2.6 Hipot Testing Safety & Post-Hipot Grounding 2.7 Confined Space & General Electrical Safety 2.8 Risk Assessment, Job Briefings & the Hierarchy of Risk Controls 2.9 Codes & Standards: NFPA 70 Key Provisions and the ANSI/NETA Specifications
3 Chapter 2: Power Systems Theory
3.1 Three-Phase Power & Wye/Delta Relationships 3.2 Power Factor, Voltage Unbalance & Negative Sequence 3.3 Symmetrical Components & Fault-Current Paths 3.4 Grounding Systems & Impedance Grounding 3.5 Insulation Degradation & Dielectric Theory 3.6 Electrical Calculations, Units & Conversions
4 Chapter 3: Protection & Device Fundamentals
4.1 ANSI Device Numbers (27, 50, 51, 59, 86, 87) 4.2 IDMT/TCC Curves & Coordination 4.3 CT Theory: Ratio, Polarity, Burden, Accuracy & Knee Point 4.4 PT/VT Fundamentals & Insulation Coordination 4.5 Motor Circuits: FLA, PF Correction & Current Imbalance 4.6 One-Lines, Three-Lines, Schematics & Electrical Symbols 4.7 Short-Circuit & Coordination Studies
5 Chapter 4: Insulation Resistance Testing
5.1 Insulation Resistance: Test Voltages & IEEE 43 Minimums 5.2 Polarization Index (PI) & Dielectric Absorption Ratio (DAR) 5.3 Overpotential vs IR & Cable Hipot Basics 5.4 Guard Terminal, Doble Test Set & Thermography
6 Chapter 5: Withstand & Power-Factor Testing
6.1 DC Hipot: Step Voltage, Leakage Current & Pass Criteria 6.2 VLF Cable Testing & the DC/AC Voltage Conversion 6.3 Bushing Power Factor & Transformer PF Configurations 6.4 Oil Dielectric (ASTM) & DGA Sampling 6.5 Cable Fault Locating
7 Chapter 6: Transformer Testing
7.1 Transformer Turns Ratio (TTR) & Acceptance 7.2 Winding Resistance & Transformer Polarity 7.3 Transformer IR Configurations & Neutral-Ground Bond 7.4 SFRA, Sudden-Pressure Relay & Dry-Transformer ATS Tests
8 Chapter 7: CT, Relay & Motor Testing
8.1 CT Ratio, Polarity & Saturation Testing 8.2 Primary vs Secondary Injection & Relay Pickup 8.3 Three-Phase Relay Test Set, Phase-Angle Meter & Induction Disc 8.4 Motor Surge Test & Current Imbalance 8.5 Adjustable-Speed Drives, Reclosers, Sectionalizers & Fiber-Optic Cables
9 Chapter 8: Switchgear & Breaker Testing
9.1 Contact Resistance (Ductor) & Torque Verification 9.2 Vacuum Bottle Integrity & VCB Maintenance Tests 9.3 Post-Fault Breaker Maintenance & LV Trip-Unit Settings 9.4 Switchgear Bus IR, MCC Inspection & Bonding Jumpers 9.5 Switches, Circuit Switchers & Network Protectors 9.6 Metal-Enclosed Busways & Outdoor Bus Structures
10 Chapter 9: Grounding, Batteries & Protective Devices
10.1 Ground-Electrode Testing: Fall-of-Potential & Clamp-On 10.2 Battery Load Test (IEEE 450), VRLA Ohmic & Intervals 10.3 Fuses, GFCI & Zero-Sequence CT Grounding 10.4 Surge Arrester Acceptance & SPD Verification 10.5 Metering Devices & Regulating Apparatus 10.6 Capacitor Banks & Reactors: Inspection, Testing & Acceptance
11 Chapter 10: Systems & Commissioning
11.1 Automatic Transfer Switch Functional Testing 11.2 NFPA 110 Emergency System Load Tests 11.3 Switchgear Functional Testing & Feeder Trip Troubleshooting 11.4 Generator Paralleling & Emergency System Commissioning 11.5 As-Found / As-Left Documentation 11.6 Restoration & Handover Workflow
10.5 Metering Devices & Regulating Apparatus
Key Takeaways Explain This Topic AI
A metering circuit is only as accurate as its instrument transformers, so verifying CT and PT ratio, polarity, and burden is part of every metering verification.
Metering-class instrument transformers are held to tighter accuracy than relaying-class units, and accuracy classes are defined at specified burdens under ANSI/IEEE C57.13 and C12 metering standards.
A step-voltage regulator adjusts voltage in 32 steps over a plus or minus 10 percent range, which works out to 5/8 of one percent per step.
Never open a regulator's series winding under load: the bypass switch is closed before the disconnects are opened, and the regulator must be on the neutral position first.
Regulator and tap-changer testing combines transformer tests - turns ratio at every tap, winding resistance, insulation resistance, and insulating fluid tests - with control-function verification.
Last updated: August 2026
Metering Devices
Domain III subdomain K covers metering devices: watt-hour meters, ammeters, voltmeters, power and power-factor meters, transducers, and the digital multifunction meters that have replaced most of them. The Level 2 DCO asks you to identify properties, types, and applications, apply visual and mechanical inspections, employ methods and procedures for electrical tests, and evaluate test results.
The Chain That Determines Accuracy
A meter reading is the product of an entire measurement chain, and the meter itself is rarely the weak link: Primary current/voltage -> CT/PT -> secondary wiring -> burden -> meter
An error anywhere multiplies through. This is why metering verification always starts upstream of the meter:
CT and PT ratio — verify the actual ratio and, on multi-ratio CTs, the tap actually landed. A 1200:5 CT wired on its 600:5 tap while the meter is programmed for 1200:5 reports exactly half the true current.
Polarity — a reversed CT reverses the sign of real power on that phase. On a three-phase meter, one reversed CT does not simply subtract that phase; it produces a reading that can look plausible but is badly wrong, and it flips the sign of kW and kVAR contributions.
Burden — the total VA of the connected secondary circuit, including the meter, wiring, and any shunts. Exceeding the CT's rated burden pushes it out of its accuracy class. Long secondary runs of small conductor are the usual cause.
Secondary wiring and shorting screws — verify continuity, correct phase assignment, and that CT shorting blocks are open when in service and closed before you lift a lead.
Meter programming — CT and PT ratios, wiring configuration (4-wire wye, 3-wire delta), and pulse constants must match the installation.
Accuracy Classes
Instrument transformer accuracy is specified at a stated burden , not in the abstract. Under ANSI/IEEE C57.13 practice, metering-class accuracy is far tighter than relaying-class : metering CTs are typically held to a fraction of a percent ratio error at their rated burden, while relaying accuracy classes (C-class ratings such as C400) specify that ratio error stays within about 10 percent up to 20 times rated current into a stated burden. That difference is the exam point: a relaying CT is not a metering CT. Using one for revenue metering produces legally defective billing; using a metering CT for protection produces a core that saturates during faults exactly when the relay needs a faithful signal.
Revenue metering accuracy classes are defined under the ANSI C12 metering standards, with the tighter classes reserved for billing applications.
Visual, Mechanical, and Electrical Tests
Inspect for physical damage, correct mounting, seals intact on revenue meters, and legible nameplate and multiplier data.
Verify the meter multiplier posted on the enclosure matches the installed CT and PT ratios; a wrong posted multiplier is a common and expensive finding.
Verify the display, communications, demand reset, and time and date settings.
Verify accuracy at multiple points — typically light load, full load, and at a lagging power factor — because a meter can be accurate at unity and wrong at 0.5 lagging if a current or voltage element is bad.
Compare the meter's readings against a calibrated reference standard at the same instant, using the same instrument transformer secondaries.
Where the meter reads through transducers, verify the transducer output span against injected inputs.
When a meter and a portable analyzer disagree, resolve it upstream: check the CT tap, then polarity, then burden, then the programmed ratios. Only after all four are verified is the meter itself the suspect.
Regulating Apparatus
Domain III subdomain L covers regulating apparatus: step-voltage regulators , load tap changers (LTCs) , and induction regulators. At Level 2 the DCO lists identify properties, types, and applications, and apply visual and mechanical inspections.
How a Step-Voltage Regulator Works
A step-voltage regulator is an autotransformer with a tapped series winding and a motor-driven tap changer, plus a control that senses output voltage and drives the taps to hold a setpoint. The standard is plus or minus 10 percent regulation in 32 steps — 16 raise and 16 lower — which gives 5/8 of one percent (0.625%) per step . A reversing switch flips the series winding to change between raise and lower ranges, and the neutral position is where the series winding contributes nothing.
The control uses line-drop compensation — R and X settings that model the impedance of the line downstream — so the regulator holds voltage at a remote load center rather than at its own terminals. A regulator with wrong compensation settings will hold the wrong voltage at the customer, which is a common commissioning finding.
The Bypass Sequence That Matters
The series winding of a regulator carries the full line current. Opening it under load is like open-circuiting a current transformer secondary — the winding tries to sustain current through an open gap and produces a destructive, potentially lethal arc and voltage.
The rule set:
Drive the regulator to the neutral position first and confirm it there — both by the position indicator and, where equipped, by the neutral light.
Close the bypass switch to establish a parallel path for load current.
Only then open the source and load disconnects , isolating the regulator.
Reverse the order to restore: close the disconnects, verify neutral, then open the bypass.
A regulator that is not on neutral when bypassed places the series winding across the bypass and circulates a large current through it. "Neutral first, bypass second, disconnects last" is worth memorizing verbatim.
Inspections and Tests
Item What you check
Visual and mechanical Oil level and leaks, bushing condition, position indicator and drag hands, operation counter reading against the maintenance interval, control cabinet heater and moisture, correct polarity of the control PT and CT
Operation counter The single best maintenance indicator — tap changers are maintained on operations, not calendar time
Turns ratio (TTR) Measured at every tap , not just neutral, and compared against the calculated ratio for that step
Winding resistance Through the tap range; erratic or stepped readings indicate worn or contaminated diverter contacts
Insulation resistance Winding-to-winding and winding-to-ground, plus control-circuit IR
Insulating fluid Dielectric breakdown and, for LTC compartments, separate sampling — LTC oil is contaminated by arcing and is tested and treated separately from main-tank oil
Control function Voltage setpoint, bandwidth, time delay, line-drop compensation R and X, raise and lower operation, limit switches, and reverse-power or bidirectional control mode
The LTC-oil point is worth carrying: on a transformer with an LTC in its own compartment, a dissolved-gas result from the LTC compartment showing arcing gases is normal , because the tap changer arcs by design every time it operates. Confusing an LTC oil sample with a main-tank sample generates a false alarm — and mixing up the sample labels is a real and common field error.