Study guide
4.6 One-Lines, Three-Lines, Schematics & Electrical Symbols
NETA ETT Level II Certified Assistant Technician Exam
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 About the NETA Level 2 Exam 1.2 The NETA Certification Hierarchy & Eligibility 1.3 Exam Administration, Scoring & Scheduling 1.4 Study Plan & How to Use This Guide
2 Chapter 1: Electrical Safety
2.1 NFPA 70E Approach Boundaries & Arc-Flash 2.2 PPE, Rubber Glove Classes & Hearing Protection 2.3 LOTO & the Electrically Safe Work Condition 2.4 Energized Work Permits & Live-Dead-Live 2.5 Temporary Protective Grounds & Induced Voltage 2.6 Hipot Testing Safety & Post-Hipot Grounding 2.7 Confined Space & General Electrical Safety 2.8 Risk Assessment, Job Briefings & the Hierarchy of Risk Controls 2.9 Codes & Standards: NFPA 70 Key Provisions and the ANSI/NETA Specifications
3 Chapter 2: Power Systems Theory
3.1 Three-Phase Power & Wye/Delta Relationships 3.2 Power Factor, Voltage Unbalance & Negative Sequence 3.3 Symmetrical Components & Fault-Current Paths 3.4 Grounding Systems & Impedance Grounding 3.5 Insulation Degradation & Dielectric Theory 3.6 Electrical Calculations, Units & Conversions
4 Chapter 3: Protection & Device Fundamentals
4.1 ANSI Device Numbers (27, 50, 51, 59, 86, 87) 4.2 IDMT/TCC Curves & Coordination 4.3 CT Theory: Ratio, Polarity, Burden, Accuracy & Knee Point 4.4 PT/VT Fundamentals & Insulation Coordination 4.5 Motor Circuits: FLA, PF Correction & Current Imbalance 4.6 One-Lines, Three-Lines, Schematics & Electrical Symbols 4.7 Short-Circuit & Coordination Studies
5 Chapter 4: Insulation Resistance Testing
5.1 Insulation Resistance: Test Voltages & IEEE 43 Minimums 5.2 Polarization Index (PI) & Dielectric Absorption Ratio (DAR) 5.3 Overpotential vs IR & Cable Hipot Basics 5.4 Guard Terminal, Doble Test Set & Thermography
6 Chapter 5: Withstand & Power-Factor Testing
6.1 DC Hipot: Step Voltage, Leakage Current & Pass Criteria 6.2 VLF Cable Testing & the DC/AC Voltage Conversion 6.3 Bushing Power Factor & Transformer PF Configurations 6.4 Oil Dielectric (ASTM) & DGA Sampling 6.5 Cable Fault Locating
7 Chapter 6: Transformer Testing
7.1 Transformer Turns Ratio (TTR) & Acceptance 7.2 Winding Resistance & Transformer Polarity 7.3 Transformer IR Configurations & Neutral-Ground Bond 7.4 SFRA, Sudden-Pressure Relay & Dry-Transformer ATS Tests
8 Chapter 7: CT, Relay & Motor Testing
8.1 CT Ratio, Polarity & Saturation Testing 8.2 Primary vs Secondary Injection & Relay Pickup 8.3 Three-Phase Relay Test Set, Phase-Angle Meter & Induction Disc 8.4 Motor Surge Test & Current Imbalance 8.5 Adjustable-Speed Drives, Reclosers, Sectionalizers & Fiber-Optic Cables
9 Chapter 8: Switchgear & Breaker Testing
9.1 Contact Resistance (Ductor) & Torque Verification 9.2 Vacuum Bottle Integrity & VCB Maintenance Tests 9.3 Post-Fault Breaker Maintenance & LV Trip-Unit Settings 9.4 Switchgear Bus IR, MCC Inspection & Bonding Jumpers 9.5 Switches, Circuit Switchers & Network Protectors 9.6 Metal-Enclosed Busways & Outdoor Bus Structures
10 Chapter 9: Grounding, Batteries & Protective Devices
10.1 Ground-Electrode Testing: Fall-of-Potential & Clamp-On 10.2 Battery Load Test (IEEE 450), VRLA Ohmic & Intervals 10.3 Fuses, GFCI & Zero-Sequence CT Grounding 10.4 Surge Arrester Acceptance & SPD Verification 10.5 Metering Devices & Regulating Apparatus 10.6 Capacitor Banks & Reactors: Inspection, Testing & Acceptance
11 Chapter 10: Systems & Commissioning
11.1 Automatic Transfer Switch Functional Testing 11.2 NFPA 110 Emergency System Load Tests 11.3 Switchgear Functional Testing & Feeder Trip Troubleshooting 11.4 Generator Paralleling & Emergency System Commissioning 11.5 As-Found / As-Left Documentation 11.6 Restoration & Handover Workflow
4.6 One-Lines, Three-Lines, Schematics & Electrical Symbols
Key Takeaways Explain This Topic AI
A one-line diagram collapses all three phases into a single line to show power flow, equipment, ratings, and protection; it is the map you use to plan isolation and testing.
A three-line diagram shows each phase separately and is the only drawing that reveals CT and PT connections, polarity marks, and phase-by-phase relay inputs.
An elementary or schematic diagram shows control logic in functional order with no regard for physical layout, while a connection or wiring diagram shows terminal-by-terminal physical wiring.
Device function numbers are ANSI/IEEE C37.2 numbers and are combined with suffixes and prefixes - 50/51 is a combined instantaneous and time overcurrent element, 51N is its neutral-residual counterpart.
Reading the drawing set in the right order - one-line for scope, three-line for instrument transformers, schematic for logic, connection diagram for terminals - is what turns a trip investigation from guesswork into a procedure.
Last updated: August 2026
Four Drawings, Four Jobs
Every NETA job runs on a drawing set, and the Level 2 exam expects you to know which drawing answers which question. Reaching for the wrong one wastes time on the exam and on the job.
Drawing Shows The question it answers
One-line (single-line) Three phases collapsed to one line; sources, transformers, buses, breakers, feeders, ratings, protective devices "What is upstream of this equipment, and what do I have to open to isolate it?"
Three-line Each phase drawn separately, with CTs, PTs, polarity marks, and per-phase relay inputs "Which CT feeds which relay input, and which way does polarity point?"
Elementary / schematic (ladder) Control logic drawn in functional order, ignoring physical layout "Why did this breaker trip, and what has to be true for it to close?"
Connection / wiring / interconnection Physical terminal blocks, wire numbers, cable routing between panels "Which screw do I land this jumper on?"
The One-Line Diagram
The one-line is the plan-view of the power system. It shows one line where three conductors exist, because in a balanced three-phase system all three phases carry the same information. A usable one-line carries: utility source and available fault current, transformer kVA, primary and secondary voltages, impedance percentage and winding configuration, main and feeder breaker frame and trip ratings, CT and PT ratios, relay device numbers, bus ratings, and the grounding arrangement.
On a test job the one-line is what you mark up for the switching plan. Before you touch anything, you trace every source that can energize the equipment — including backfeed paths through tie breakers, generators, and UPS outputs. The most dangerous one-line error is an undocumented second source , which is why the field verification of the one-line is itself part of commissioning.
What a one-line will not tell you: which CT polarity mark faces the bus, how a control circuit sequences, or which terminal a wire lands on. Those need the other three drawings.
The Three-Line Diagram
The three-line (sometimes "three-phase diagram") expands each phase. It is the only drawing that shows:
- Individual CTs on each phase, their ratios, taps in use, and polarity dot or H1 marking
- Which CT secondaries are paralleled, and where the residual or neutral connection is formed
- PT connections — wye, delta, open-delta, and the grounding of the secondary
- Which phase feeds which relay input, and the phase rotation assumed by the scheme
For differential (87) and directional (67) work, the three-line is mandatory. A polarity reversal on one CT is invisible on a one-line and obvious on a three-line.
Elementary (Schematic) Diagrams
An elementary diagram — often drawn as a ladder with two vertical rails and horizontal rungs — shows the control circuit as logic. Devices are drawn in their de-energized, de-activated state by convention, so a normally open contact is drawn open even if it happens to be closed right now with the equipment in service.
The conventions that matter:
Contacts are drawn shown normal : NO contacts open, NC contacts closed, with the device de-energized and, for a breaker auxiliary, the breaker open.
52a contacts follow the breaker (closed when the breaker is closed); 52b contacts are opposite (closed when the breaker is open). The 52a in series with the trip coil is what prevents the trip coil from burning up after the breaker has opened.
DC control circuits are usually drawn positive rail on the left, negative on the right; the coil sits at the right end of the rung so that a ground fault on the wire between the contacts and the coil cannot energize the coil.
Read a trip circuit right to left: which contacts had to close for that coil to energize? That reading is exactly how you troubleshoot an unexplained trip.
Connection and Interconnection Diagrams
The connection diagram (panel wiring diagram) shows the physical reality: terminal block TB1 point 7, wire number 52TC, going to the cubicle door. An interconnection diagram shows the cables between enclosures. These are the drawings you use when landing test leads or restoring wiring you lifted, and the discipline is simple: photograph and record before you lift, restore against the drawing, then verify by test rather than by memory .
Symbols You Must Recognize
Symbols vary between drafting standards, but the recurring set on power one-lines is small:
- Symbol Device
- Square or rectangle in the line, sometimes with an X Drawout circuit breaker
Two interlocking circles / coils Two-winding transformer, with winding configuration marked (delta triangle, wye Y)
- Circle with a diagonal blade Disconnect switch (open blade shows the isolating gap)
- Circle with a number inside Protective relay, numbered per ANSI device number
- Circle on the line with a bar Current transformer, with the polarity dot indicating H1
- Small rectangle with a squiggle Fuse
- Arrow or arrowhead to ground Grounding connection or grounding electrode
- Circle with a wavy line Generator or motor, lettered G or M
- Device Function Numbers in Context
ANSI/IEEE C37.2 device numbers appear inside the relay circles. Section 4.1 covers the numbers themselves; what the drawing set adds is how they are qualified :
A suffix letter narrows the element: 51N is a time overcurrent element on the neutral or residual circuit, 51G on a dedicated ground CT, 87T a transformer differential, 87B a bus differential.
A combined number shows one device performing two functions: 50/51 is one relay providing both instantaneous and time overcurrent.
A prefix number identifies the circuit or equipment: 52-1 and 52-2 are two different breakers, not two functions.
Using the Set Together: A Worked Investigation
A 480 V feeder breaker has tripped with a 51N target. The order of drawings is not optional:
One-line — identify the feeder, its CT ratio, the relay, and the upstream device you must coordinate with. Confirm the isolation points and whether any alternate source can backfeed the feeder.
Three-line — confirm how the residual connection that feeds the 51N element is formed. If the three phase CTs are residually connected, an open or shorted CT secondary on one phase produces a false residual current and a genuine-looking 51N trip with no actual ground fault.
Schematic — trace the trip path: 51N output contact, through the 52a, into the trip coil. Confirm nothing else in that rung could have initiated the trip.
Connection diagram — verify the physical CT secondary landings and shorting screws before you inject.
Only then do you test. Skipping straight to the megger is how technicians spend an afternoon proving a healthy cable is healthy.