9.4 Switchgear Bus IR, MCC Inspection & Bonding Jumpers
NETA ETT Level II Certified Assistant Technician Exam
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 About the NETA Level 2 Exam 1.2 The NETA Certification Hierarchy & Eligibility 1.3 Exam Administration, Scoring & Scheduling 1.4 Study Plan & How to Use This Guide
2 Chapter 1: Electrical Safety
2.1 NFPA 70E Approach Boundaries & Arc-Flash 2.2 PPE, Rubber Glove Classes & Hearing Protection 2.3 LOTO & the Electrically Safe Work Condition 2.4 Energized Work Permits & Live-Dead-Live 2.5 Temporary Protective Grounds & Induced Voltage 2.6 Hipot Testing Safety & Post-Hipot Grounding 2.7 Confined Space & General Electrical Safety 2.8 Risk Assessment, Job Briefings & the Hierarchy of Risk Controls 2.9 Codes & Standards: NFPA 70 Key Provisions and the ANSI/NETA Specifications
3 Chapter 2: Power Systems Theory
3.1 Three-Phase Power & Wye/Delta Relationships 3.2 Power Factor, Voltage Unbalance & Negative Sequence 3.3 Symmetrical Components & Fault-Current Paths 3.4 Grounding Systems & Impedance Grounding 3.5 Insulation Degradation & Dielectric Theory 3.6 Electrical Calculations, Units & Conversions
4 Chapter 3: Protection & Device Fundamentals
4.1 ANSI Device Numbers (27, 50, 51, 59, 86, 87) 4.2 IDMT/TCC Curves & Coordination 4.3 CT Theory: Ratio, Polarity, Burden, Accuracy & Knee Point 4.4 PT/VT Fundamentals & Insulation Coordination 4.5 Motor Circuits: FLA, PF Correction & Current Imbalance 4.6 One-Lines, Three-Lines, Schematics & Electrical Symbols 4.7 Short-Circuit & Coordination Studies
5 Chapter 4: Insulation Resistance Testing
5.1 Insulation Resistance: Test Voltages & IEEE 43 Minimums 5.2 Polarization Index (PI) & Dielectric Absorption Ratio (DAR) 5.3 Overpotential vs IR & Cable Hipot Basics 5.4 Guard Terminal, Doble Test Set & Thermography
6 Chapter 5: Withstand & Power-Factor Testing
6.1 DC Hipot: Step Voltage, Leakage Current & Pass Criteria 6.2 VLF Cable Testing & the DC/AC Voltage Conversion 6.3 Bushing Power Factor & Transformer PF Configurations 6.4 Oil Dielectric (ASTM) & DGA Sampling 6.5 Cable Fault Locating
7 Chapter 6: Transformer Testing
7.1 Transformer Turns Ratio (TTR) & Acceptance 7.2 Winding Resistance & Transformer Polarity 7.3 Transformer IR Configurations & Neutral-Ground Bond 7.4 SFRA, Sudden-Pressure Relay & Dry-Transformer ATS Tests
8 Chapter 7: CT, Relay & Motor Testing
8.1 CT Ratio, Polarity & Saturation Testing 8.2 Primary vs Secondary Injection & Relay Pickup 8.3 Three-Phase Relay Test Set, Phase-Angle Meter & Induction Disc 8.4 Motor Surge Test & Current Imbalance 8.5 Adjustable-Speed Drives, Reclosers, Sectionalizers & Fiber-Optic Cables
9 Chapter 8: Switchgear & Breaker Testing
9.1 Contact Resistance (Ductor) & Torque Verification 9.2 Vacuum Bottle Integrity & VCB Maintenance Tests 9.3 Post-Fault Breaker Maintenance & LV Trip-Unit Settings 9.4 Switchgear Bus IR, MCC Inspection & Bonding Jumpers 9.5 Switches, Circuit Switchers & Network Protectors 9.6 Metal-Enclosed Busways & Outdoor Bus Structures
10 Chapter 9: Grounding, Batteries & Protective Devices
10.1 Ground-Electrode Testing: Fall-of-Potential & Clamp-On 10.2 Battery Load Test (IEEE 450), VRLA Ohmic & Intervals 10.3 Fuses, GFCI & Zero-Sequence CT Grounding 10.4 Surge Arrester Acceptance & SPD Verification 10.5 Metering Devices & Regulating Apparatus 10.6 Capacitor Banks & Reactors: Inspection, Testing & Acceptance
11 Chapter 10: Systems & Commissioning
11.1 Automatic Transfer Switch Functional Testing 11.2 NFPA 110 Emergency System Load Tests 11.3 Switchgear Functional Testing & Feeder Trip Troubleshooting 11.4 Generator Paralleling & Emergency System Commissioning 11.5 As-Found / As-Left Documentation 11.6 Restoration & Handover Workflow
9.4 Switchgear Bus IR, MCC Inspection & Bonding Jumpers
Key Takeaways Explain This Topic AI
Switchgear bus IR is performed phase-to-phase and phase-to-ground for one minute, at the voltage from NETA MTS Table 100.1 (e.g., 1000 V-rated bus tests at 1000 V DC with a 100 megohm minimum).
Before the test: open/rack out all breakers, disconnect surge devices and parallel paths, and verify LOTO — otherwise you test the load, not the bus, and can damage SPDs.
MCC visual inspection verifies overload heater size, contact wear, connection torque, coil rating, anti-condensation heaters, and labeling; IR confirms bus insulation.
Bonding jumpers across expansion joints and enclosure separations must be a low-impedance (milliohm) path — verify with a Ductor/DLRO, not a standard ohmmeter.
Bonding continuity is what lets a fault clear: a high-impedance bond leaves the equipment grounding path open, raising touch voltage and delaying or preventing device operation.
Last updated: August 2026
Switchgear Bus Insulation Resistance
The bus is the backbone of the switchgear — bare or insulated copper/aluminum bars bolted to insulators, running phase-to-phase and phase-to-ground through the line-up. A bus insulation failure is a phase fault inside the gear, with no easy repair. The NETA MTS insulation resistance test is the routine screen.
Test Setup
Before applying any test voltage, the bus must be isolated so the reading reflects the bus, not the connected load:
Open and rack out every breaker / disconnect in the section under test.
Disconnect or short surge protective devices (SPDs) and any capacitor or electronic gear that the DC test voltage could damage.
Verify LOTO and confirm de-energized (live-dead-live).
Test phase-to-phase (A-B, B-C, A-C) and phase-to-ground (each phase to the grounded enclosure), one minute each.
A common error is leaving a breaker closed or an SPD connected — the reading is then dominated by the downstream load or by the SPD leakage, and a good bus can look bad (or worse, the SPD is destroyed by 2500 V DC).
Test Voltage and Acceptance
Per ANSI/NETA MTS Table 100.1, the test voltage and minimum insulation resistance scale with the equipment's nominal rating:
- Equipment rating (V) DC test voltage (V) Min. insulation (megohms)
- 600 1,000 100
- 1,000 1,000 100
- 2,500 1,000 500
- 5,000 2,500 1,000
- 15,000 2,500 2,500
These are minimums when manufacturer data is unavailable; the manufacturer's published value governs. Trend results over time and temperature-correct for comparison. A dielectric withstand (hipot) test must not be run until the IR is above the minimum.
MCC Visual Inspection and IR
A motor control center (MCC) is a lineup of starters, feeders, and drives feeding motors. The NETA inspection is mostly visual and mechanical , supplemented by IR:
Inspect Look for
Overload heater/element Correct size for motor FLA — mismatched heaters are a leading cause of overload-related motor failures
- Contacts Wear, pitting, silver migration
- Connection torque Verify per OEM (a Ductor on the main stab is a good cross-check)
- Coil Correct voltage rating, no charring
- Heaters Energized and working (anti-condensation)
- Labeling Correct bucket ID, voltage, and FLA
Follow with an IR test on the MCC bus, the same way as switchgear — breakers/bucket starters open or withdrawn, SPDs disconnected, phase-to-phase and phase-to-ground at the Table 100.1 voltage. On a 480 V (600 V class) MCC the test voltage is 1,000 V DC with a 100 megohm minimum . Record phase-to-ground and phase-to-phase readings; a healthy MCC bus should read well above the minimum (often hundreds of megohms) when clean and dry. A low reading on one phase only points to a specific bucket — withdraw buckets one at a time to isolate the bad section.
Common MCC Defects Found on Inspection
Mismatched overload heaters — the single most common MCC defect; a heater sized for the previous smaller motor causes nuisance trips or, worse, a heater too large for the new motor fails to protect the winding.
Burned contact tips — from repeated jogging or undervoltage pickup; replace contacts and check the coil voltage.
Loose stab fingers — high Ductor reading on the line-to-load path through the bucket; re-torque or replace the stab block.
Dead anti-condensation heaters — moisture accumulates in buckets installed in unconditioned spaces, dropping IR and corroding contacts. Verify heaters are energized, not just present.
Wrong bucket in the wrong cell — verify the bucket nameplate matches the cell ID and the loaded motor; mislabeled buckets are a frequent cause of the wrong motor being de-energized during troubleshooting.
Bonding Jumper Test
The equipment grounding and bonding path is what makes a fault clearable: when a phase faults to a motor frame or enclosure, the fault current returns through the bonding path to the source neutral/ground, and the upstream overcurrent device operates. A high-resistance bond raises touch voltage (shock hazard) and lowers fault current (the device may not operate, or may take long enough that an arc flash develops).
NETA MTS requires verifying the continuity and low impedance of the bonding path, including bonding jumpers across expansion joints, flexible conduit, separations, and around any non-continuous enclosure joint :
Test with a low-resistance ohmmeter (Ductor / DLRO) , not a standard ohmmeter — milliohms matter, and a 2-wire ohmmeter cannot resolve them.
Acceptance: the bond between two enclosures should be no greater than a few milliohms — high enough to read on a Ductor, low enough to carry full fault current. (This is very different from a ground electrode resistance, which is typically <= 5 ohms for a single rod.)
Verify the jumper is the correct size (NEC Table 250.122 / 250.66 as applicable), mechanically secure, and free of corrosion.
Why It Matters
A switchgear line-up with a broken bonding jumper across an expansion joint is effectively two ungrounded enclosures. A ground fault on the far section has no low-impedance return path — the upstream breaker sees a low-magnitude, high-impedance fault and may never trip, while the enclosure stays energized at a dangerous voltage. The Ductor test across the jumper catches this in seconds.
Worked Example
A 480 V MCC has been in service 10 years. Visual inspection finds two buckets with overload heaters sized for a 25 HP motor where 40 HP motors are now installed — the heaters are undersized and nuisance-tripping. The IR test on the MCC bus reads 350 megohms phase-to-ground (above the 100 megohm minimum for a 600 V class bus). A Ductor across the bonding jumper between the MCC and the adjacent feeder panel reads 2.1 milliohms — acceptable. The heaters are replaced, the bucket labels are corrected, and the MCC is returned to service.