Study guide
7.2 Winding Resistance & Transformer Polarity
NETA ETT Level II Certified Assistant Technician Exam
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 About the NETA Level 2 Exam 1.2 The NETA Certification Hierarchy & Eligibility 1.3 Exam Administration, Scoring & Scheduling 1.4 Study Plan & How to Use This Guide
2 Chapter 1: Electrical Safety
2.1 NFPA 70E Approach Boundaries & Arc-Flash 2.2 PPE, Rubber Glove Classes & Hearing Protection 2.3 LOTO & the Electrically Safe Work Condition 2.4 Energized Work Permits & Live-Dead-Live 2.5 Temporary Protective Grounds & Induced Voltage 2.6 Hipot Testing Safety & Post-Hipot Grounding 2.7 Confined Space & General Electrical Safety 2.8 Risk Assessment, Job Briefings & the Hierarchy of Risk Controls 2.9 Codes & Standards: NFPA 70 Key Provisions and the ANSI/NETA Specifications
3 Chapter 2: Power Systems Theory
3.1 Three-Phase Power & Wye/Delta Relationships 3.2 Power Factor, Voltage Unbalance & Negative Sequence 3.3 Symmetrical Components & Fault-Current Paths 3.4 Grounding Systems & Impedance Grounding 3.5 Insulation Degradation & Dielectric Theory 3.6 Electrical Calculations, Units & Conversions
4 Chapter 3: Protection & Device Fundamentals
4.1 ANSI Device Numbers (27, 50, 51, 59, 86, 87) 4.2 IDMT/TCC Curves & Coordination 4.3 CT Theory: Ratio, Polarity, Burden, Accuracy & Knee Point 4.4 PT/VT Fundamentals & Insulation Coordination 4.5 Motor Circuits: FLA, PF Correction & Current Imbalance 4.6 One-Lines, Three-Lines, Schematics & Electrical Symbols 4.7 Short-Circuit & Coordination Studies
5 Chapter 4: Insulation Resistance Testing
5.1 Insulation Resistance: Test Voltages & IEEE 43 Minimums 5.2 Polarization Index (PI) & Dielectric Absorption Ratio (DAR) 5.3 Overpotential vs IR & Cable Hipot Basics 5.4 Guard Terminal, Doble Test Set & Thermography
6 Chapter 5: Withstand & Power-Factor Testing
6.1 DC Hipot: Step Voltage, Leakage Current & Pass Criteria 6.2 VLF Cable Testing & the DC/AC Voltage Conversion 6.3 Bushing Power Factor & Transformer PF Configurations 6.4 Oil Dielectric (ASTM) & DGA Sampling 6.5 Cable Fault Locating
7 Chapter 6: Transformer Testing
7.1 Transformer Turns Ratio (TTR) & Acceptance 7.2 Winding Resistance & Transformer Polarity 7.3 Transformer IR Configurations & Neutral-Ground Bond 7.4 SFRA, Sudden-Pressure Relay & Dry-Transformer ATS Tests
8 Chapter 7: CT, Relay & Motor Testing
8.1 CT Ratio, Polarity & Saturation Testing 8.2 Primary vs Secondary Injection & Relay Pickup 8.3 Three-Phase Relay Test Set, Phase-Angle Meter & Induction Disc 8.4 Motor Surge Test & Current Imbalance 8.5 Adjustable-Speed Drives, Reclosers, Sectionalizers & Fiber-Optic Cables
9 Chapter 8: Switchgear & Breaker Testing
9.1 Contact Resistance (Ductor) & Torque Verification 9.2 Vacuum Bottle Integrity & VCB Maintenance Tests 9.3 Post-Fault Breaker Maintenance & LV Trip-Unit Settings 9.4 Switchgear Bus IR, MCC Inspection & Bonding Jumpers 9.5 Switches, Circuit Switchers & Network Protectors 9.6 Metal-Enclosed Busways & Outdoor Bus Structures
10 Chapter 9: Grounding, Batteries & Protective Devices
10.1 Ground-Electrode Testing: Fall-of-Potential & Clamp-On 10.2 Battery Load Test (IEEE 450), VRLA Ohmic & Intervals 10.3 Fuses, GFCI & Zero-Sequence CT Grounding 10.4 Surge Arrester Acceptance & SPD Verification 10.5 Metering Devices & Regulating Apparatus 10.6 Capacitor Banks & Reactors: Inspection, Testing & Acceptance
11 Chapter 10: Systems & Commissioning
11.1 Automatic Transfer Switch Functional Testing 11.2 NFPA 110 Emergency System Load Tests 11.3 Switchgear Functional Testing & Feeder Trip Troubleshooting 11.4 Generator Paralleling & Emergency System Commissioning 11.5 As-Found / As-Left Documentation 11.6 Restoration & Handover Workflow
7.2 Winding Resistance & Transformer Polarity
Key Takeaways Explain This Topic AI
Winding resistance is measured with a DC micro-ohmmeter using 4-wire (Kelvin) connections to eliminate lead resistance, with test current sufficient to magnetize the core.
Readings are temperature-corrected to 75 degrees C for oil-filled transformers using R75 = Rm x (234.5 + 75) / (234.5 + Tm) for copper windings (use 225 for aluminum).
Unequal phase-to-phase winding resistance (typically beyond about 5%) points to loose connections, degraded OLTC contacts, or a partially open winding.
A transformer polarity test (DC kick or AC comparison) verifies whether the windings are additive or subtractive and confirms the H1/X1 polarity marks.
Polarity and vector group must be correct before paralleling transformers or before energizing a differential (87) scheme, or the unit will trip or fight its companion.
Last updated: August 2026
Winding Resistance Test Method
The winding resistance test measures the DC resistance of each transformer winding. It is performed with a DC micro-ohmmeter (Ductor) using 4-wire Kelvin connections so that test-lead resistance is excluded from the reading. A standard DMM on a 200-ohm range is not acceptable — its two-lead connection includes lead and contact resistance that swamps the small winding resistance values being measured.
Test current must be sufficient to magnetize the core (typically 1 to 10 A DC for power transformers). After connection, the technician must wait for the inductive transient to settle — the winding is a large inductor, and the current takes several seconds to stabilize. Reading too early gives a falsely high resistance. Many modern instruments detect settling automatically.
Measurement Patterns
On a single-phase transformer, measure HV winding end-to-end and LV winding end-to-end.
On a three-phase wye winding, measure each phase to the neutral (H1-N, H2-N, H3-N).
On a three-phase delta winding, measure each phase pair (H1-H2, H2-H3, H3-H1). Each reading includes two windings in series with the third in parallel, so a single open or degraded winding distorts the pattern in a predictable way: the two readings that include the bad winding both shift, while the reading of the two good windings stays normal.
For three-winding transformers (a primary, a secondary, and a tertiary), repeat the suite on all three windings.
Temperature Correction
Winding resistance varies with temperature. To compare readings against factory data, prior field readings, or phase-to-phase, correct the measured resistance to a reference temperature — 75 degrees C for oil-filled transformers and often 85 degrees C or the insulation class rating for dry-type. For copper windings the correction is: R75 = Rm x (234.5 + 75) / (234.5 + Tm)
where Rm is the measured resistance and Tm is the measured winding temperature in degrees C. For aluminum windings, replace 234.5 with 225 . The winding temperature for an oil-filled unit is usually taken as the top-oil temperature; for a de-energized unit that has sat, ambient is acceptable.
What Winding Resistance Reveals
Pattern Likely Cause
One phase reading significantly higher (typically > 5%) than the other two Loose external connection, degraded OLTC contact, high-resistance splice in that phase
- One phase reading open (infinite) Open winding, broken lead, or completely failed OLTC contact
- All three phases uniformly high Temperature correction error, wrong test current, or a calibration issue
OLTC readings jump between adjacent taps Worn or contaminated diverter-switch contacts; tap-changer maintenance needed
Readings drift downward during the test Test current still settling; core not yet saturated — wait longer
NETA MTS guidance generally treats phase-to-phase winding resistance differences greater than about 5% (or the manufacturer's stated value) as a flag for investigation, because the three phases of a healthy winding are within a few percent of each other after temperature correction.
Transformer Polarity Test
The polarity test determines whether a transformer's primary and secondary windings are subtractive or additive and confirms the H1/X1 polarity marks on the bushings.
Subtractive polarity : when H1 and X1 are adjacent and the voltage measured between H1 and X1 is less than the primary voltage alone, the windings oppose. Most distribution transformers above about 200 kVA and virtually all power transformers are subtractive.
Additive polarity : when H1 and X1 are adjacent and the voltage between them is greater than the primary voltage alone, the windings aid. Common on small distribution transformers below about 200 kVA and on some instrument transformers.
Two methods are used in the field:
DC kick method — a small DC battery is momentary connected across the primary; a galvanometer or DC voltmeter on the secondary deflects. The direction of the first deflection identifies polarity. This is the classic Level 2 method.
AC comparison method — a known AC voltage is applied to the primary, and the voltage between a primary bushing and the adjacent secondary bushing is compared to the two winding voltages. If the reading is V_primary - V_secondary, polarity is subtractive; if it is V_primary + V_secondary, polarity is additive.
Why Polarity Matters
Polarity and vector group (e.g., Dyn1, YNd11) determine how a transformer connects into a system. Two transformers can only be paralleled if they have the same vector group, the same polarity orientation, and the same turns ratio. Getting polarity wrong on a parallel pair causes circulating current between the units that can trip them or damage them on energization.
Polarity is equally critical for differential (87) protection . The 87 scheme compares CT secondary currents on the primary and secondary sides of the transformer; if the CT polarity does not account for the transformer's polarity and vector group, the relay sees a through-current as an internal fault and trips on load or on through-faults . Polarity verification is part of commissioning for every new 87 installation.
Short-Circuit Impedance Estimate
The winding resistance test gives the DC resistance of each phase. The transformer's short-circuit (leakage) impedance is larger than the DC resistance because it includes leakage reactance. A rough first-order estimate is: Z_sc approx R_winding + jX_leakage
But X_leakage cannot be derived from a DC resistance test — it requires an actual short-circuit test (apply reduced voltage to the primary with the secondary shorted and measure voltage and current at rated current). NETA Level 2 candidates should know that winding resistance is only the resistive part of the impedance and that the leakage reactance test is a separate, full-voltage-equivalent test. The winding resistance value is most useful for I-squared-R loss checks, OLTC contact health, and trending — not for impedance calculations.