Study guide
6.3 Bushing Power Factor & Transformer PF Configurations
NETA ETT Level II Certified Assistant Technician Exam
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 About the NETA Level 2 Exam 1.2 The NETA Certification Hierarchy & Eligibility 1.3 Exam Administration, Scoring & Scheduling 1.4 Study Plan & How to Use This Guide
2 Chapter 1: Electrical Safety
2.1 NFPA 70E Approach Boundaries & Arc-Flash 2.2 PPE, Rubber Glove Classes & Hearing Protection 2.3 LOTO & the Electrically Safe Work Condition 2.4 Energized Work Permits & Live-Dead-Live 2.5 Temporary Protective Grounds & Induced Voltage 2.6 Hipot Testing Safety & Post-Hipot Grounding 2.7 Confined Space & General Electrical Safety 2.8 Risk Assessment, Job Briefings & the Hierarchy of Risk Controls 2.9 Codes & Standards: NFPA 70 Key Provisions and the ANSI/NETA Specifications
3 Chapter 2: Power Systems Theory
3.1 Three-Phase Power & Wye/Delta Relationships 3.2 Power Factor, Voltage Unbalance & Negative Sequence 3.3 Symmetrical Components & Fault-Current Paths 3.4 Grounding Systems & Impedance Grounding 3.5 Insulation Degradation & Dielectric Theory 3.6 Electrical Calculations, Units & Conversions
4 Chapter 3: Protection & Device Fundamentals
4.1 ANSI Device Numbers (27, 50, 51, 59, 86, 87) 4.2 IDMT/TCC Curves & Coordination 4.3 CT Theory: Ratio, Polarity, Burden, Accuracy & Knee Point 4.4 PT/VT Fundamentals & Insulation Coordination 4.5 Motor Circuits: FLA, PF Correction & Current Imbalance 4.6 One-Lines, Three-Lines, Schematics & Electrical Symbols 4.7 Short-Circuit & Coordination Studies
5 Chapter 4: Insulation Resistance Testing
5.1 Insulation Resistance: Test Voltages & IEEE 43 Minimums 5.2 Polarization Index (PI) & Dielectric Absorption Ratio (DAR) 5.3 Overpotential vs IR & Cable Hipot Basics 5.4 Guard Terminal, Doble Test Set & Thermography
6 Chapter 5: Withstand & Power-Factor Testing
6.1 DC Hipot: Step Voltage, Leakage Current & Pass Criteria 6.2 VLF Cable Testing & the DC/AC Voltage Conversion 6.3 Bushing Power Factor & Transformer PF Configurations 6.4 Oil Dielectric (ASTM) & DGA Sampling 6.5 Cable Fault Locating
7 Chapter 6: Transformer Testing
7.1 Transformer Turns Ratio (TTR) & Acceptance 7.2 Winding Resistance & Transformer Polarity 7.3 Transformer IR Configurations & Neutral-Ground Bond 7.4 SFRA, Sudden-Pressure Relay & Dry-Transformer ATS Tests
8 Chapter 7: CT, Relay & Motor Testing
8.1 CT Ratio, Polarity & Saturation Testing 8.2 Primary vs Secondary Injection & Relay Pickup 8.3 Three-Phase Relay Test Set, Phase-Angle Meter & Induction Disc 8.4 Motor Surge Test & Current Imbalance 8.5 Adjustable-Speed Drives, Reclosers, Sectionalizers & Fiber-Optic Cables
9 Chapter 8: Switchgear & Breaker Testing
9.1 Contact Resistance (Ductor) & Torque Verification 9.2 Vacuum Bottle Integrity & VCB Maintenance Tests 9.3 Post-Fault Breaker Maintenance & LV Trip-Unit Settings 9.4 Switchgear Bus IR, MCC Inspection & Bonding Jumpers 9.5 Switches, Circuit Switchers & Network Protectors 9.6 Metal-Enclosed Busways & Outdoor Bus Structures
10 Chapter 9: Grounding, Batteries & Protective Devices
10.1 Ground-Electrode Testing: Fall-of-Potential & Clamp-On 10.2 Battery Load Test (IEEE 450), VRLA Ohmic & Intervals 10.3 Fuses, GFCI & Zero-Sequence CT Grounding 10.4 Surge Arrester Acceptance & SPD Verification 10.5 Metering Devices & Regulating Apparatus 10.6 Capacitor Banks & Reactors: Inspection, Testing & Acceptance
11 Chapter 10: Systems & Commissioning
11.1 Automatic Transfer Switch Functional Testing 11.2 NFPA 110 Emergency System Load Tests 11.3 Switchgear Functional Testing & Feeder Trip Troubleshooting 11.4 Generator Paralleling & Emergency System Commissioning 11.5 As-Found / As-Left Documentation 11.6 Restoration & Handover Workflow
6.3 Bushing Power Factor & Transformer PF Configurations
Key Takeaways Explain This Topic AI
Power factor (tan-delta) testing measures dielectric losses in insulation — elevated PF indicates moisture, contamination, or aging.
Bushing C1 tests the main insulation (conductor to capacitance tap) in UST mode at 10 kV; C2 tests the tap-to-ground insulation in GST-g mode at 500 V (test tap) or 2 kV (potential tap).
Transformer winding tests use CH (high-to-low, UST), CL (low-to-ground, GST), and CHL (high-to-low-and-ground, GST) configurations — not C1/C2 nomenclature.
Healthy OIP bushing C1 PF is typically 0.2–0.5% at 20°C; investigate if PF exceeds 1.5× nameplate, remove from service if it exceeds 2× (or 3× per IEEE C57.152).
Tip-up (PF at 10 kV minus PF at 2 kV) should be ≈ 0.00% for healthy insulation; a flat or decreasing frequency sweep indicates deterioration.
Last updated: August 2026
What Power Factor / Tan-Delta Measures
An insulation power-factor test (also called dissipation-factor or tan-delta ) applies an AC voltage to the insulation and measures the loss angle between the capacitive and resistive components of the resulting current. Pure insulation behaves like an ideal capacitor — current leads voltage by 90°, and the loss angle is zero. Real insulation has resistive losses, so the angle is slightly less than 90°. The tan of that loss angle equals the ratio of resistive to capacitive current — a direct measure of dielectric loss.
- Condition PF / tan δ (corrected to 20°C)
- Healthy new OIP bushing 0.2–0.4%
- Acceptance limit (IEEE/IEC) ≤ 0.5%
- Investigate > 1.5× nameplate PF
- Unacceptable / remove > 2× nameplate (or > 3× per IEEE C57.152)
Elevated PF indicates moisture ingress, contamination, or thermal aging of the oil-paper insulation. Trending PF over years is more diagnostic than a single absolute reading.
Bushing C1 and C2 Tests
A capacitance-graded bushing has a concentric capacitor stack between the high-voltage conductor and the ground flange, with a capacitance tap brought out for testing. This creates two distinct insulation paths:
C1 — main insulation : between the line conductor and the capacitance tap. Tested in UST (Ungrounded Specimen Test) mode at 10 kV . This is the primary dielectric path that sees service stress.
C2 — tap-to-ground insulation : between the capacitance tap and the ground flange. Tested in GST-g (Grounded Specimen Test, guarded) mode at 500 V for a test tap or 2 kV for a potential tap . C2 protects the tap circuit and indicates tap-area moisture or contamination.
The two tests are complementary. A high C1 PF points to main insulation degradation. A high C2 PF (or abnormal capacitance, or negative PF) points to tap-area moisture, a loose flange ground, or a defective tap. Hot collar tests (10 kV, GST-GND) supplement C2 by locating low-oil or condenser faults section by section.
Acceptance guidelines (nameplate comparison)
C1 PF > 1.5× nameplate → questionable; test more frequently.
C1 PF > 2× nameplate → unacceptable for service.
Capacitance change > 5% → investigate; > 10% → consider replacement (shorted condenser layers).
C1 tip-up (10 kV PF − 2 kV PF) should be ≈ 0.00% for healthy oil-paper insulation. Values above ~0.05% warrant investigation.
Transformer Power-Factor Configurations
A two-winding transformer has three insulation paths of interest: high winding to low winding (H-X) , high winding to ground (H-GND) , and low winding to ground (L-GND) . The Doble test set measures each using a combination of three modes:
UST (Ungrounded Specimen Test) — measures only the current between the HV lead and the specific terminal connected to the measuring input; rejects any current flowing to ground. Isolates a single inter-winding path.
GST (Grounded Specimen Test) — the specimen's low end is grounded; measures all current paths between the HV terminal and ground simultaneously (winding-to-winding plus winding-to-ground).
GST-Guarded — adds the guard terminal to divert a specific stray current path around the measuring circuit so it is not counted.
The standard three measurements are:
- Test Mode Energize Measure What it captures
- CH UST H winding X winding (return) H-to-X inter-winding insulation only (tank floating)
- CL GST (or UST) X winding Ground X/L winding-to-ground, including LV bushings
- CHL GST H winding X + ground H-to-X plus H-to-ground combined
Running all three provides a consistency check : the readings are arithmetically related, so a measured third value that does not match the value calculated from the other two reveals a connection error, a grounding problem, or external interference. CHL is not C1 — C1/C2 is bushing nomenclature; CH/CL/CHL is winding nomenclature. Confusing the two is a common exam trap.
Typical PF values (oil-filled transformers, corrected to 20°C)
- Test New / acceptance Caution (in-service)
- CH, CL, CHL ≤ 0.5% ~1.0–2.0%
Dry-type transformer values are higher — ventilated dry-type CHL up to 2.0%, CL up to 4.0%, CH up to 3.0%.
Guard Terminal Use
The guard terminal diverts surface leakage current (e.g., across dirty or wet bushing porcelain) around the measuring circuit so the meter reads only the volume (through-insulation) resistance. Proper guarding gives a cleaner reading for trending. Improper guarding — guarding out a path that is part of the intended measurement — produces falsely low (good-looking) results. Guarding must be deliberate, never default.
Temperature Correction and Trending
PF is strongly temperature-dependent. Correct all readings to 20°C using the oil temperature (not ambient air). Trending a given bushing or winding over years, with consistent temperature correction, is more diagnostic than comparing to a generic table. A sudden step-change between scheduled tests is the strongest alarm — even if the absolute value is still under 0.5%.
The Doble Test Set
The Doble M-series (and equivalent OMICRON test sets) is the field-standard instrument for insulation PF / tan-delta and capacitance testing. It performs bushing C1/C2, transformer CH/CL/CHL, CT, PT, and breaker insulation tests, and supports voltage and frequency sweeps for tip-up and DFR analysis. Trending software compares each test to the unit's nameplate and to prior readings — the diagnostic power comes from the trend.
Common PF Test Traps
Confusing C1/C2 (bushing) with CH/CL/CHL (winding) — C1 is the main bushing insulation in UST at 10 kV; CH is the high-to-low winding path in UST. They are different tests on different apparatus.
Guarding by default — guarding out a path that is part of the intended measurement produces a falsely low (good-looking) PF. Guarding must be deliberate.
Comparing an uncorrected field reading to a 20°C nameplate — always temperature-correct to 20°C using oil temperature before any nameplate comparison.
Ignoring capacitance change — a C1 capacitance change > 5% (especially an increase) indicates shorted condenser layers, a serious mechanical fault even if PF looks fine.
Trusting a single reading over the trend — a step-change between scheduled tests is the strongest alarm, even when the absolute value is still under 0.5%.