Study guide
7.2 Traverse Computation and Adjustment
SURCON Professional Examination — Surveyor Nigeria
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: The SURCON Professional Examination
1.1 The Surveyor's-Cadre Examination: Papers VI, VII and the Folio 1.2 Enrolment, Pupilage and the Certificate of Experience 1.3 Paper VII: The Professional Essay 1.4 Compiling the Survey Folio 1.5 The Oral Interview and Project Defence 1.6 Contemporary Professional Issues for the Essay and Interview
2 Chapter 2: The SURCON Act (Cap S18 LFN 2004)
2.1 The SURCON Act: Establishment, Membership and Functions 2.2 The Registrar and the Four-Part Register 2.3 Registration of Surveyors, Technologists and Technicians 2.4 Approved Qualifications, Supervision of Training and Appeals 2.5 Professional Discipline: the Disciplinary Committee and the Investigating Panel 2.6 Penalties, Offences and the Right to Practise
3 Chapter 3: Survey Co-ordination Act, Survey Laws and Regulations
3.1 The Survey Co-ordination Act 3.2 State Survey Laws: Plans, Deposit and Protection of Survey Marks 3.3 Survey Regulations: Field Survey Methods and the Standard of Survey 3.4 Survey Regulations: Demarcation and Beacon Construction 3.5 Survey Plans, Records and Information 3.6 Resurvey, Boundary Disputes and the Surveyor as Witness
4 Chapter 4: Land Law for Surveyors
4.1 The Land Use Act 1978: Vesting and Land Administration 4.2 Rights of Occupancy, Certificates of Occupancy and Deemed Grants 4.3 Alienation, Consent and the Nullity Rule 4.4 Revocation and Compensation under Sections 28 to 30 4.5 Land Registration Systems and LIS Integration 4.6 Minerals, Planning and Boundary Legislation
5 Chapter 5: Professional Practice, Ethics and Management
5.1 Professional Ethics and Client Relations 5.2 Charging for Survey Work, Records and the Surveyor's Signature 5.3 Establishing and Running a Survey Practice 5.4 Engagement, Liability, Quality Assurance and Safety
6 Chapter 6: Geodesy and Control
6.1 Minna Datum and Geodetic Reference Frames in Nigeria 6.2 Height Systems and Geoid Undulation 6.3 The Nigeria Transverse Mercator Projection and Grid Belts 6.4 GNSS Positioning, NIGNET and Control Networks 6.5 Geodetic Computations and Network Adjustments 6.6 Geodetic Astronomy and Azimuth Determination 6.7 Datum Transformation in Practice
7 Chapter 7: Computations, Land Surveying and LIS
7.1 Error Theory and Least Squares 7.2 Traverse Computation and Adjustment 7.3 Areas, Volumes and Setting Out 7.4 GIS Spatial Data Models and Topology 7.5 Land Information Systems and Spatial Databases 7.6 Web GIS, Cartography and Spatial Data Infrastructure
8 Chapter 8: Photogrammetry, Remote Sensing, Hydrography and Engineering
8.1 Fundamentals of Aerial Photogrammetry 8.2 UAV Photogrammetry and Structure from Motion 8.3 Satellite Remote Sensing and Image Interpretation 8.4 Image Processing, Classification and LiDAR 8.5 Sounding Systems and Hydrographic Equipment 8.6 Hydrographic Data Reductions and Tidal Datums 8.7 IHO S-44 Standards and Offshore Survey Practice 8.8 Engineering Route Surveying and Curve Geometry 8.9 Tunnelling, Mining Surveys and Deformation Monitoring
7.2 Traverse Computation and Adjustment
Key Takeaways Explain This Topic AI
Angular misclosure is checked before any coordinate computation, against the theoretical sum (n - 2) x 180 degrees for interior angles of a closed polygon.
The linear misclosure vector is the root of the sum of the squares of the departure and latitude misclosures, and its ratio to the perimeter is the fractional linear misclosure.
Regulation 3 sets the standard at an accuracy equivalent to a surround traverse closing at 1:3,000.
The Bowditch (compass) rule distributes misclosure in proportion to leg length; the transit rule distributes in proportion to the departure or latitude of each leg.
Regulation 5(E) requires bearings reduced to the nearest thirty seconds, lengths and coordinates to the nearest tenth of a foot, and areas computed arithmetically from the coordinates of the corners.
Last updated: August 2026
- 7.2 Traverse Computation and Adjustment
- 1. Angular closure comes first
Never compute coordinates before checking angles. A blunder in an angle propagates into every subsequent bearing, and the linear misclosure will then be large without telling you where the fault lies.
For a closed polygon traverse of n n n sides: ∑ interior angles = ( n − 2 ) × 180 ∘ \sum \text{interior angles} = (n-2) \times 180^\circ ∑ interior angles = ( n − 2 ) × 18 0 ∘ ∑ exterior angles = ( n + 2 ) × 180 ∘ \sum \text{exterior angles} = (n+2) \times 180^\circ ∑ exterior angles = ( n + 2 ) × 18 0 ∘
For a link (closed-route) traverse between two lines of known bearing, the check is against the difference between the fixed opening and closing bearings.
The angular misclosure is the difference between the observed and theoretical sums. It must satisfy regulation 5(A)(iii): 3 seconds times the square root of N , with N not exceeding 30. If it does, distribute it equally among the angles - each angle was observed the same way, so each carries the same expected error - and then propagate bearings from the fixed opening bearing.
Worked example. A five-sided closed traverse gives observed interior angles summing to 540 deg 00' 25".
- Theoretical: ( 5 − 2 ) × 180 = 540 (5-2) \times 180 = 540 ( 5 − 2 ) × 180 = 540 deg 00' 00"
- Misclosure: +25"
Tolerance: 3 ′ ′ × 5 = 3 × 2.236 = 6.7 ′ ′ 3'' \times \sqrt{5} = 3 \times 2.236 = 6.7'' 3 ′′ × 5 = 3 × 2.236 = 6. 7 ′′
25 seconds exceeds the tolerance. The correct response is not to distribute it but to look for a blunder - a misread angle, a wrong station, a transcription error - because 25 seconds in five stations is not random error. This is the discipline the Regulations impose, and it is the discipline a Folio must demonstrate.
Had the misclosure been, say, +5", it would be within tolerance and each angle would be corrected by − 1 ′ ′ -1'' − 1 ′′ .
2. Bearings, latitudes and departures
Propagate bearings around the traverse from the fixed opening bearing using the corrected angles, and reduce each to the nearest thirty seconds as regulation 5(E)(i) requires.
For each leg of length L L L and bearing θ \theta θ (measured clockwise from north): Δ N = L cos θ ( latitude ) Δ E = L sin θ ( departure ) \Delta N = L\cos\theta \quad (\text{latitude}) \qquad \Delta E = L\sin\theta \quad (\text{departure}) Δ N = L cos θ ( latitude ) Δ E = L sin θ ( departure )
For a closed polygon , both sums should be zero: ∑ Δ N = 0 , ∑ Δ E = 0 \sum\Delta N = 0, \qquad \sum\Delta E = 0 ∑ Δ N = 0 , ∑ Δ E = 0
For a link traverse , they should equal the known coordinate differences between the terminal stations.
3. Misclosure and its ratio ≠ N = ∑ Δ N − ( Δ N ) k n o w n , e E = ∑ Δ E − ( Δ E ) k n o w n \ne_N = \sum\Delta N - (\Delta N)_{known}, \qquad e_E = \sum\Delta E - (\Delta E)_{known} = N = ∑ Δ N − ( Δ N ) kn o w n , e E = ∑ Δ E − ( Δ E ) kn o w n ≠ = e N 2 + e E 2 \ne = \sqrt{e_N^2 + e_E^2} = = e N 2 + e E 2 Fractional linear misclosure = e ∑ L = 1 ( ∑ L ) / e \text{Fractional linear misclosure} = \frac{e}{\sum L} = \frac{1}{(\sum L)/e} Fractional linear misclosure = ∑ L e = ( ∑ L ) / e 1
Worked example. A traverse of total length 1,842.60 m closes with e N = − 0.28 e_N = -0.28 e N = − 0.28 m and e E = + 0.42 e_E = +0.42 e E = + 0.42 m. ≠ = ( − 0.28 ) 2 + ( 0.42 ) 2 = 0.0784 + 0.1764 = 0.2548 = 0.505 m \ne = \sqrt{(-0.28)^2 + (0.42)^2} = \sqrt{0.0784 + 0.1764} = \sqrt{0.2548} = 0.505\text{ m} = = ( − 0.28 ) 2 + ( 0.42 ) 2 = 0.0784 + 0.1764 = 0.2548 = 0.505 m Ratio = 0.505 1842.60 = 1 3648 \text{Ratio} = \frac{0.505}{1842.60} = \frac{1}{3648} Ratio = 1842.60 0.505 = 3648 1
1:3,648 is better than 1:3,000 , so the traverse meets the regulation 3 standard and may be adjusted. Had it come out at 1:2,400 the survey would have failed the standard and the correct answer is re-observation, not adjustment. Adjustment redistributes random error; it does not convert a substandard survey into a compliant one.
The direction of the misclosure vector is worth computing too. A misclosure that lies almost along one leg's bearing often points to a length blunder in that leg; one perpendicular to it points to an angular problem.
4. Bowditch (compass) rule
The Bowditch rule assumes that angles and distances are of comparable precision , so error accumulates in proportion to the length of each leg: Correction to Δ N i = − e N × L i ∑ L , Correction to Δ E i = − e E × L i ∑ L \text{Correction to } \Delta N_i = -e_N \times \frac{L_i}{\sum L}, \qquad \text{Correction to } \Delta E_i = -e_E \times \frac{L_i}{\sum L} Correction to Δ N i = − e N × ∑ L L i , Correction to Δ E i = − e E × ∑ L L i
Worked example. Continuing from above, with e N = − 0.28 e_N = -0.28 e N = − 0.28 m, e E = + 0.42 e_E = +0.42 e E = + 0.42 m and ∑ L = 1842.60 \sum L = 1842.60 ∑ L = 1842.60 m, a leg of L = 421.30 L = 421.30 L = 421.30 m receives:
Δ N \Delta N Δ N correction: + 0.28 × 421.30 1842.60 = + 0.28 × 0.22864 = + 0.064 +0.28 \times \dfrac{421.30}{1842.60} = +0.28 \times 0.22864 = +0.064 + 0.28 × 1842.60 421.30 = + 0.28 × 0.22864 = + 0.064 m
Δ E \Delta E Δ E correction: − 0.42 × 0.22864 = − 0.096 -0.42 \times 0.22864 = -0.096 − 0.42 × 0.22864 = − 0.096 m
Apply the corrections with the opposite sign to the misclosure , and check that the corrections sum to exactly − e N -e_N − e N and − e E -e_E − e E before proceeding. That check catches arithmetic slips immediately.
Bowditch is the default in Nigerian cadastral practice because ordinary traverse work does observe angles and distances to comparable relative precision.
5. Transit rule
The transit rule assumes that angles are more precise than distances , so error is attributed to the linear components: Correction to Δ N i = − e N × ∣ Δ N i ∣ ∑ ∣ Δ N ∣ , Correction to Δ E i = − e E × ∣ Δ E i ∣ ∑ ∣ Δ E ∣ \text{Correction to } \Delta N_i = -e_N \times \frac{|\Delta N_i|}{\sum|\Delta N|}, \qquad \text{Correction to } \Delta E_i = -e_E \times \frac{|\Delta E_i|}{\sum|\Delta E|} Correction to Δ N i = − e N × ∑ ∣Δ N ∣ ∣Δ N i ∣ , Correction to Δ E i = − e E × ∑ ∣Δ E ∣ ∣Δ E i ∣
It is appropriate where a precise theodolite is used with less precise distance measurement. Its weakness is that the adjusted result depends on the orientation of the traverse relative to the axes: rotate the whole traverse and the transit-adjusted coordinates change shape, which Bowditch-adjusted coordinates do not. For general cadastral work that is a decisive objection.
- Bowditch (compass) Transit
- Assumes Angles and distances of comparable precision Angles more precise than distances
- Distributes in proportion to Leg length Departure / latitude of each leg
- Orientation-dependent? No Yes
- Usual Nigerian cadastral use Default Special cases only
- 6. Coordinates and area
Accumulate the adjusted latitudes and departures from the fixed starting coordinates. Regulation 5(E)(iii) requires coordinates computed to the nearest tenth of a foot , by logarithms of not less than five figures or by calculating machine, and requires that the Colony coordinates of at least one beacon in the survey be computed where Colony coordinates are available for the beacon to which the survey is connected.
For area, regulation 5(E)(iv) requires the area of land bounded by straight lines to be computed arithmetically from the coordinates of the corners - the cross-product ("surveyor's") formula: A = 1 2 ∣ ∑ i = 1 n ( E i N i + 1 − E i + 1 N i ) ∣ A = \frac{1}{2}\left|\sum_{i=1}^{n}\left(E_i N_{i+1} - E_{i+1} N_i\right)\right| A = 2 1 i = 1 ∑ n ( E i N i + 1 − E i + 1 N i )
with the polygon closed by taking ( E n + 1 , N n + 1 ) = ( E 1 , N 1 ) (E_{n+1}, N_{n+1}) = (E_1, N_1) ( E n + 1 , N n + 1 ) = ( E 1 , N 1 ) .
Where a boundary is irregular, the area between it and the adjacent traverse line is computed as a series of trapezoids , consistent with regulation 9, which requires traverse lines to follow approximately the course of an irregular boundary with offsets taken at suitable points.
Finally, state the area to the accuracy prescribed by regulation 31(j) - which reduces the number of decimals as the parcel grows, because relative boundary accuracy, not arithmetic, limits how many digits are meaningful.
7. The order of operations 1. Angular misclosure -> check against 3" x sqrt(N), N <= 30
OUT OF TOLERANCE? Find the blunder.
2. Distribute angular misclosure equally; propagate bearings
from the fixed opening bearing; reduce to nearest 30".
3. Reduce distances: standard, slope, temperature, sag;
then to the ellipsoid and to the grid (combined factor).
4. Compute latitudes and departures.
5. Linear misclosure and its RATIO -> check against 1:3,000.
SUBSTANDARD? Re-observe. Do not adjust.
6. Adjust (Bowditch by default); verify corrections sum to -e.
7. Accumulate coordinates from the fixed start.
8. Area from coordinates; irregular strips as trapezoids.
9. State area to reg. 31(j) accuracy.