Study guide
5.2 Charging for Survey Work, Records and the Surveyor's Signature
SURCON Professional Examination — Surveyor Nigeria
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: The SURCON Professional Examination
1.1 The Surveyor's-Cadre Examination: Papers VI, VII and the Folio 1.2 Enrolment, Pupilage and the Certificate of Experience 1.3 Paper VII: The Professional Essay 1.4 Compiling the Survey Folio 1.5 The Oral Interview and Project Defence 1.6 Contemporary Professional Issues for the Essay and Interview
2 Chapter 2: The SURCON Act (Cap S18 LFN 2004)
2.1 The SURCON Act: Establishment, Membership and Functions 2.2 The Registrar and the Four-Part Register 2.3 Registration of Surveyors, Technologists and Technicians 2.4 Approved Qualifications, Supervision of Training and Appeals 2.5 Professional Discipline: the Disciplinary Committee and the Investigating Panel 2.6 Penalties, Offences and the Right to Practise
3 Chapter 3: Survey Co-ordination Act, Survey Laws and Regulations
3.1 The Survey Co-ordination Act 3.2 State Survey Laws: Plans, Deposit and Protection of Survey Marks 3.3 Survey Regulations: Field Survey Methods and the Standard of Survey 3.4 Survey Regulations: Demarcation and Beacon Construction 3.5 Survey Plans, Records and Information 3.6 Resurvey, Boundary Disputes and the Surveyor as Witness
4 Chapter 4: Land Law for Surveyors
4.1 The Land Use Act 1978: Vesting and Land Administration 4.2 Rights of Occupancy, Certificates of Occupancy and Deemed Grants 4.3 Alienation, Consent and the Nullity Rule 4.4 Revocation and Compensation under Sections 28 to 30 4.5 Land Registration Systems and LIS Integration 4.6 Minerals, Planning and Boundary Legislation
5 Chapter 5: Professional Practice, Ethics and Management
5.1 Professional Ethics and Client Relations 5.2 Charging for Survey Work, Records and the Surveyor's Signature 5.3 Establishing and Running a Survey Practice 5.4 Engagement, Liability, Quality Assurance and Safety
6 Chapter 6: Geodesy and Control
6.1 Minna Datum and Geodetic Reference Frames in Nigeria 6.2 Height Systems and Geoid Undulation 6.3 The Nigeria Transverse Mercator Projection and Grid Belts 6.4 GNSS Positioning, NIGNET and Control Networks 6.5 Geodetic Computations and Network Adjustments 6.6 Geodetic Astronomy and Azimuth Determination 6.7 Datum Transformation in Practice
7 Chapter 7: Computations, Land Surveying and LIS
7.1 Error Theory and Least Squares 7.2 Traverse Computation and Adjustment 7.3 Areas, Volumes and Setting Out 7.4 GIS Spatial Data Models and Topology 7.5 Land Information Systems and Spatial Databases 7.6 Web GIS, Cartography and Spatial Data Infrastructure
8 Chapter 8: Photogrammetry, Remote Sensing, Hydrography and Engineering
8.1 Fundamentals of Aerial Photogrammetry 8.2 UAV Photogrammetry and Structure from Motion 8.3 Satellite Remote Sensing and Image Interpretation 8.4 Image Processing, Classification and LiDAR 8.5 Sounding Systems and Hydrographic Equipment 8.6 Hydrographic Data Reductions and Tidal Datums 8.7 IHO S-44 Standards and Offshore Survey Practice 8.8 Engineering Route Surveying and Curve Geometry 8.9 Tunnelling, Mining Surveys and Deformation Monitoring
5.2 Charging for Survey Work, Records and the Surveyor's Signature
Key Takeaways Explain This Topic AI
Survey fees for services rendered by a State Survey Division are prescribed by regulations made under section 18(k) of the Survey Law, in Part VII of the Survey Regulations.
SURCON does not publish a national scale of fees on its website; a candidate should describe the statutory fee-making powers rather than quote invented tariffs.
Section 20 of the SURCON Act bars anyone other than a fully registered surveyor from recovering fees by process of law, and section 5 of the Survey Law adds a fine per transaction for unlicensed practice.
A surveyor's signature on a plan is the statutory trigger for registration and admissibility under section 3 of the Survey Law, which makes signing another person's work a serious matter.
Section 4 of the Survey Law requires the surveyor to date the plan and deposit a copy with the Surveyor-General within one month, on pain of a fine.
Last updated: August 2026
5.2 Charging for Survey Work, Records and the Surveyor's Signature
Sources: Survey Law ss.4, 5, 16 and 18; Survey Regulations Part V (private applications to the Surveyor-General) and Part VII (survey fees); SURCON Act ss.4, 18 and 20.
A warning before the substance. Figures for a "SURCON Scale of Fees" circulate widely in candidate materials, and they are not published by the Council. Do not quote a tariff you cannot source. Paper VI rewards a candidate who explains where fee-making power sits and how charging is regulated; it does not reward invented numbers.
1. Where fee-making power actually sits
Instrument Power
SURCON Act s.7(5)(d) The Council may make rules specifying the fees to be paid to the Council in respect of the entry of names on the register , and authorising the registrar to refuse entry until paid. Section 7(6): those rules do not come into force until confirmed by the Minister.
SURCON Act s.4(d) The Council's general duty of regulating and controlling the practice of the profession in all its ramifications - the source of any instrument the Council issues on professional charging.
Survey Law s.18(k) The Governor may make regulations prescribing the fees which may be charged for services rendered by the Survey Division .
Survey Regulations, Part VII Regulation 53 - fees for survey of parcels of land ; regulation 54 - fees for other survey services ; regulation 55 - alteration of rates of charge ; regulation 56 - layout surveys ; regulation 57 - waiver of fees .
Survey Regulations, Part V Private applications for survey to the Surveyor-General: regulation 41 (information required), 42 (discretion to investigate or refuse), 43 and 45 ( assessment of charges ), 44 (attendance of applicant), 46 ( cost of investigation ).
So the prescribed tariffs that genuinely exist are for services rendered by the State Survey Division , made by the Governor under the Survey Law. Private practice charging is a matter of contract, subject to whatever professional instruments the Council issues under section 4(d) and to the ordinary law.
2. Private applications to the Surveyor-General (Part V)
A member of the public may apply to the Surveyor-General to have a survey executed by the Survey Division. Part V of the Regulations governs the process:
Regulation 41 prescribes the information required on the application.
Regulation 42 gives the Surveyor-General discretion to investigate or refuse the application. The citizen has no automatic entitlement to a departmental survey.
Regulations 43 and 45 govern assessment of charges , and regulation 46 the cost of investigation - so an applicant may incur cost even where the survey does not proceed.
Regulation 44 provides for the attendance of the applicant , which in practice means attending to point out the boundary claimed.
Under section 16 of the Survey Law , any sum due under the Law may be sued for and recovered by the Director, the Surveyor-General or a person authorised, by action in any court of competent jurisdiction.
3. The economics of unlicensed practice
Two provisions do the work, and they are civil rather than criminal in their most effective operation.
SURCON Act section 20. "A person other than a fully registered surveyor shall not be entitled to recover, by process of law, fees or other valuable consideration whatsoever in respect of any act, matter or thing done or omitted to be done by him pursuant to any contract while purporting to act as a registered surveyor ."
Survey Law section 5. A person who practises or professes to practise the profession of surveying, not being a surveyor, is liable on conviction to a fine of five thousand naira in respect of each transaction , and shall not be entitled to sue in any court for remuneration in respect of a survey, plan, map or diagram made by him.
The combined effect is that an unregistered operator works without an enforceable right to be paid, and faces a per-transaction fine. Add section 3 of the Survey Law - the plan is unregistrable and, save for good cause shown, inadmissible - and the product itself is close to worthless. That analysis is a far better Paper VI answer on "how does the law address quackery" than a recitation of the criminal penalties in section 18 of the SURCON Act.
4. What a signature means
Section 3 of the Survey Law is short, and it is the reason a surveyor's signature has value:
No plan accepted for registration with a registrable instrument unless prepared and signed by a surveyor;
No plan admitted in evidence , save for good cause shown to the court, unless prepared and signed by a surveyor, or certified by a surveyor as a true copy.
The signature is therefore not a formality but the statutory act that gives the document its legal effects. Three consequences follow directly:
Signing work you did not direct is signing a legal warranty you cannot support. The plan will be registered and may be admitted in evidence on the strength of the signature.
Certifying a copy is a distinct professional act. Regulation 38 governs certificates on copy plans, and section 3 makes a certified copy admissible. Certify only what you have compared with the original.
Lending a signature to an unregistered person's work defeats sections 18 and 20 of the SURCON Act. A registered surveyor who does so exposes himself to a direction of the Disciplinary Committee for infamous conduct in a professional respect under section 17(1)(a), and there is no ceiling on the seriousness with which that is treated - the available directions run to striking off.
5. Records and returns
Record-keeping is a legal obligation, not office hygiene. Collected in one place, the obligations are:
Obligation Source Period
Insert the date of completion on a plan for a registrable instrument, and submit a copy to the Surveyor-General Survey Law s.4(1) Within one month of completion; fine not exceeding N2,000 for failure
- Obtain the certificate of deposit Survey Law s.4(2) On payment of the prescribed fee
- Forward a list of all numbered beacons used , or a "Nil" return Survey Reg. 14 Monthly
Report in writing any removal, obliteration or defacement of a survey mark coming to notice Survey Reg. 26 On coming to notice
Full report on a disagreement in data or damage to Government beacons, with positions, diagrams, descriptions and particulars of development Survey Reg. 28 On discovery
Report in writing when the Surveyor-General's instructions to amend a survey or re-site beacons have been carried out Survey Reg. 29 On completion
Maintain field books in ink, no erasures, no pages torn out, with tape standardisation recorded Survey Reg. 5(D) Continuously
Notify the registrar of any change in registered particulars SURCON Act s.7(5)(b) As rules provide
The monthly beacon return in regulation 14, including the nil return , is the most frequently overlooked item on that list and one of the easiest examination marks to earn.
6. Charging in practice: what a defensible answer says
If asked how a surveyor should determine his fee, a strong answer covers:
the basis of engagement - a written instruction defining the parcel, the purpose, the deliverables and the datum and belt to be used;
the statutory work that must be done regardless - archive search under regulation 39, connection to control under regulation 4, demarcation to regulation 10, plan to regulations 30-31, deposit under section 4 - none of which is optional and all of which has a cost;
the prescribed departmental fees under Part VII of the Regulations, which set a public reference point for comparable work;
the risk carried, since the signature exposes the surveyor to liability for a document that will be relied on for decades; and
the professional constraint that the Council regulates practice in all its ramifications under section 4(d), so any instrument the Council issues on charging binds the practitioner.
What such an answer avoids is a fabricated national tariff table.